Professional Documents
Culture Documents
TG-360 LOT Procedure
TG-360 LOT Procedure
Tg-360
12-1/4in Hole Section Leak-Off Test at 13-3/8in Casing Shoe
Revision No. 1
Operational Objectives:
No accidents, no harm to people and no damage to the environment
Obtain Leak-Off Test data at 13-3/8in casing shoe
Operational Hazards:
Formation fracture
Manual handling rigging up Dowell lines
High pressure
Mud losses
Well Status:
3m of new formation has been drilled
Bottom is at 740m.
13-3/8in casing shoe at 733m MD TVD
Mud weight in hole 1.15sg
Casing has been tested to 2000psi (bumped plug)
Important Notes:
Have LCM materials close to mixing hopper and ready to mix
Have 30bbls LCM pill mixed and ready to pump.
Ensure chemicals are available for thixotropic cement plug
Have radios at Dowell unit and on rig floor
Operations
Circulate at least 1 X BU
o Ensure Mud Weight in = Mud Weight out
o Take SCRs
Pull bit into casing
o Space out for annular preventer
Install Circulating swage, lo torque valve and chiksans.
Line up cement unit to annulus via choke line and to drill string