Professional Documents
Culture Documents
Cost Estimation Sheet For Bldg. & Structure (Direct Cost)
Cost Estimation Sheet For Bldg. & Structure (Direct Cost)
Cost Estimation Sheet For Bldg. & Structure (Direct Cost)
:
ME :
COST
COSTESTIMATION
ESTIMATIONSHEET
SHEETFOR
FORBLDG.
BLDG.&&STRUCTURE
STRUCTURE(DIRECT
(DIRECTCOST)
COST)
NO. :
REV :
S/N
SYSTEM
11
13
14
15
16
17
106
107
PKG B
QTY.
Labor
Equip
TOTAL
COST
Total
MANHOUR (10HR/DAY)
UNIT MH
Earth Work
Earth Work
Earth Work
DISPOSAL (10KM)
LOADER1.34+DUMP 15
Earth Work
LAYING PE FILM
Earth Work
GRAVEL PAVING
For Transformer yard
150 MM
FORM (PLYWOOD)
For above grade
FORM (PLYWOOD)
For below grade
2 TIMES
RE-BAR 1
Deformed bar
RE-BAR 2
Deformed bar
NORMAL
CONCRETE 1
LEAN CONCRETE
URINAL SCREEN
Fc=28 MPa
Fc=7 MPa
H=1.2M, W=0.6M
PC Concrete Work
PARAPET COPPING
PC Concrete Work
PLINTH BLOCK
w=1000
105
UNIT
The cost for the temporary works is to be included in the relevant items. Bidders please refer to the COST ESTIMATION GUIDANCE located beneath the COST ESTIMATION SHEET.
18
19
20
Size
Temporary Work
10
12
3 TIMES
TOTAL MH
m3
4,091.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
3,370.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
721.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
771.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
79.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
10,924.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
m2
2,150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ton
55.00
0.00
N/A
N/A
0.00
0.00
N/A
N/A
ton
238.00
0.00
N/A
N/A
0.00
0.00
N/A
N/A
ton
293.00
N/A
0.00
0.00
0.00
0.00
0.00
0.00
m3
m3
2,335.00
234.00
0.00
0.00
N/A
N/A
N/A
N/A
0.00
0.00
0.00
0.00
N/A
N/A
N/A
N/A
EA
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
376.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
376.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
GRAND TOTAL
0.00
- Bn cht ca thng s ny l g?
- Cho gi cho phn ny nh th no???
1/1
0.00
COST ESTIMATION
BASIS