AREA SCOPE

DICIPLINE
CIVIL WORKS

Dicipline S/I

Area

Group Leader

KOO N.H

PROCESS

SHIN S.H

AREA - GS SCOPE

UTILITY
/OFFSITE

MECHANICAL WORKS

CHANG H.D

KU B.M

Sub G/ Leader

GROUP 1

Tri. Rusmono

GROUP 2

Tri. Rusmono

GROUP 3

Agus

GROUP 4

Casmadi

GROUP 5

Tri. Rusmono

GROUP 6

Agusta

GROUP 7

Danny

GROUP 8

Bara

GROUP 9

Bara

Sub-Area

41 Area

41 Area
41 Area

RU IV

Unit Group Leader

Equipment FDN

RG/RX FDN

Darmanto

Equipment FDN

MAIN COLUMN FDN

Darmanto

Equipment FDN

HOPPER FDN

Sutritsno

Equipment FDN

PIT FDN

Suryono

Heavy Crane Access Way

Heavy Crane Access Way

Basuki

Equipment Structure

STG

Rokito

Building

DEG

Tukiran

Piperack FDN

170 A

TDN

Piperack FDN

170 B

Antoni

PC Piperack Erection

104R, 107S, ROOR

Herry

GROUP 10 Eko, Ali

PROCESS

JANG S.H

GROUP 1

EDDY

Process-1

Equipment Erection,( RX/RG & CO


Boiler, Vessel,Drum, Fire Heater,
Pumps ) )

GROUP 2

TBN

Process-2

Equipment Erection ( Vessel & Drum,


Heat Exchanger, Fire Heater Air
Unit 103, 104, 105, 106, 107, 108, 109
Cooler & Pumps )

TBN

GROUP 3

TBN

Utility-1

Equipment Erection ( AUX Boiler, STG,


Unit 110, 156, 157, 158, 165
Vessel,Drum, Heat Exchaner,Pumps )

TBN

GROUP 4

TBN

Utility-2

Equipment Erection (Drum, Vessel,


Heat Exchanger,Pumps )

Unit 151, 152, 154

TBN

GROUP 5

TBN

offsite

Equipment Erection

Flare Area

TBN

GROUP 1

SUBROTO

41 Area

Unit 110, 156, 157, 158, 165


Unit 151, 152, 154
FLARE AREA, LPG&PP. RU-4
DEG. MCB. UTILITY. PROCESS S/S
WWT, WATER INTAKE. OIL TANK, LPG&PP S/S

GROUP 2

SUBROTO

41 Area

ELECTRICAL EQUIPMENT
POWER SYSTEM
EARTHING SYSTEM
LIGHTING SYSTEM
TELEPHONE AND PAGING SYSTEM
CATHODIC PROTECTION SYSTEM
FIRE ALARM SYSTEM
ELECTRICAL EQUIPMENT
POWER SYSTEM
EARTHING SYSTEM
LIGHTING SYSTEM
TELEPHONE AND PAGING SYSTEM
CATHODIC PROTECTION SYSTEM
FIRE ALARM SYSTEM

TBN
TBN
ZAENAL
TBN
TBN
IRAWADI
TBN
TBN
TBN
ZAENAL
TBN
TBN
IRAWADI
TBN

41 Area

Steel Structure Erection Works

41 Area

Steel Structure Erection Works

Stl Str related PC Rack


Unit 101, 102 All Stl Str
RX/RG Stl Str.
Unit 103, 104, 105, 106, 107, 108, 109, 110
All Stl Str.

LEE B.H

CHAI N.G
LEE B.H
TILITY & OFFSIT

CHAI N.G
LEE B.H
PROCESS

STEEL STRUCTURE WORKS Myeong C.N

Unit Group

Kim J.W

Yoon.J.W

41 Area

Work Activity

PC P/R

UTILITY
/OFFSITE

ELECTRICAL WORKS

GROUP

PROCESS

Myeong C.N

GROUP 1
Erwan
GROUP 2
Haris

Unit 101/102

Unit 101. 102. 103, 104, 105, 106, 107, 108, 109

TBN

Im S.C

Jung W.K

AREA SCOPE

DICIPLINE
PIPING WORKS

Dicipline S/I
H . J KANG

UTILITY
/OFFSITE

Kim Y.G

Area
PROCESS-1

Group Leader
Y.U OH

GROUP 3
Azwardi
GROUP
GROUP 1

Sub G/ Leader
M.Kamal'

41,38, 47 Area
RU IV
Sub-Area
41 Area

Steel Structure Erection Works

Work Activity
A/G Piping Shop Fabrication
Steam Tracing, Hydro test

AREA - GS SCOPE

A/G Piping Field Erection

PROCESS-2

S. M LEE

GROUP 2

Totok

41 Area
A/G Piping Shop Fabrication
Steam Tracing, Hydro test

A/G Piping Field Erection

GROUP 3

FATONI

41 Area

U/G Piping Shop Fabrication


U/G Piping Field Erection

UTILITY
J. P PARK

GROUP 4

Rumekso Edi

41 Area

A/G Piping Shop Fabrication


Steam Tracing, Hydro test

A/G Piping Field Erection

OFF SITE

S. H KIM

GROUP 5

Teguh

38,41,47 Area
A/G Piping Shop Fabrication
Steam Tracing, Hydro test

A/G Piping Field Erection

Pipe rack [ UT1R-1,-2 , 156R-1,2,3 etc ]


Pipe rack [ OS1R-1, 2 , etc ]
170 B ( RU-VI ), 170 A ( RU-VI )

Wi P.H

Unit Group
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Pipe Support
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Punch Clear
Hydro Test
Steam Tracing
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Pipe Support
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Punch Clear
Hydro Test
Steam Tracing
Carbon Steel Pipe (Cooling water, Drainage)
Cement Lined Pipe(Fire Water)
Carbon Steel Pipe (Cooling water, Drainage)
Cement Lined Pipe(Fire Water)
Carbon Steel Pipe
Stainless Steel Pipe
Pipe Support
Carbon Steel Pipe
Stainless Steel Pipe
Punch Clear
Hydro Test
Steam Tracing
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Pipe Support
Carbon Steel Pipe
Stainless Steel Pipe
Alloy Steel Pipe
Punch Clear
Hydro Test
Steam Tracing
Tie-in Work

Unit Group Leader


Sutrisno
Sutardi
Sutrisno
Jeong woon Bae
TBN
TBN
TBN
TBN
TBN
TBN
Amine Fauzy
Siwan
Bonari
TBN
TBN
TBN
TBN
TBN
TBN
AMINE fauzy
Parlan
Barlian Adam
Supriyono
Dadang .H
Sutaji
Rebi
TBN
TBN
TBN
TBN
TBN
Salifan
Panuji
Arief
TBN
TBN
TBN
TBN
TBN
TBN
Mujiono