Location: By: Date: Chk. By: Date:: Project

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

MANNING'S EQUATION FOR PIPE FLOW

Project:

By:
Chk. By:

Location:
Date:
Date:

Mannings Formula

Q=(1/n)ARh2/3S1/2
R=A/P
A=cross sectional area
P=wetted perimeter

V=(1/n)Rh2/3S1/2

S=slope of channel

Q=V x A

n=Manning's roughness coefficient


Solution to Mannings Equation
Area,m2

Wetted
Perimeter, m

Hydraulic
Radius, m

velocity m/s

flow, m3/s

degree

Design based
on 1/2 flow

0.0209

0.3624

0.0577

1.42

0.0298

180

Selected

0.0210

0.3684

0.0570

1.4123

0.0297

211.0967

INPUT
q=

0.03 m3/s
0.2 m
m
0.011 mannings coef
degrees
0.011 slope m/m

Manning's n-values
pipe dia, m

PVC

0.01

0.2307395002

0.20

PE (<9"dia)

0.015

PE (>12"dia)

0.02

PE(9-12"dia)

0.017

CMP

0.025

ADS N12

0.012

HCMP

0.023

Conc

0.013

MANNING'S EQUATION FOR PIPE FLOW


Project:

Location:

By:
Chk. By:

Date:
Date:

INPUT

Mannings Formula
Q=(1/n)AR

2/3
h

D=
d=
n=

1/2

S=
v=
d/D

R=A/P
A=cross sectional area
P=wetted perimeter

V=(1/n)Rh2/3S1/2

S=slope of channel

Q=V x A

0.2
0.1
0.011
180.0
0.011
1.29
0.5

n=Manning's roughness coefficient


Solution to Mannings Equation
Area,m2

Wetted
Perimeter, m

Hydraulic
Radius, m

velocity m/s

flow, m3/s

Design

0.0157

0.3142

0.0500

1.29

0.0203

Actual

0.0164

0.3621

0.0452

1.21

0.0198

Manning's n-values
PVC
PE (<9"dia)
PE (>12"dia)
PE(9-12"dia)
CMP

ADS N12
R 0.0370549

HCMP

83.395093

Conc

D
d
d/D

0.15
0.131
0.8733333

m
m
mannings coef
degrees
slope m/m
m/s

Manning's n-values
0.01
0.015
0.02
0.017
0.025
0.012
0.023
0.013

You might also like