CAVITE PROJECT REVISIONS

Inter rake carrier Structure.

Cane carrier structure.

Auxillary cane carrier structure.

Cane belt conveyour

a) Cane shredder structure.

b) Equalizer+Seprator_C24-C25-C26.

c) Head end platform.

d) Trestle_C23-23X

Semi Prepaired Belt Conveyour

a) Gantry/gallary structure.

b) Magnetic_seprator_C15-C16

R0

Staad analysis & designas per given loading & drawings

Sr No. Description of work

c) Trestle_C18

Initial Agreed PO Amount


Charges for revisions & extra work

TOTAL AMOUNT FOR CAVITE PROJECT

Revisions
R1

R2

Changes in drawing.

Reduce loading on structures.

Changes in base plates &


members.

Change loading on structures.

Changes in loading.

Reduce loading on structures

Changes in members & loading.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes in members & loading.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes in loading.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes in bracing.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes staad files for members.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes in bracing & loading.

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Changes in bracing.

=50,000/- + Service charges


= 20 days x 2500/=50,000/- + Service charges
=1,00,000/- + Service charges

Reduce loading on structures try


to keep GA Drawing sections as it
is.

Revisions
R3

R4

Changes in bracing & loads.

Changes in loading &


bracing removed.

TOTAL Nos. Extra


days

days

Reduce loading on structures.

days

Reduce loading on structures try to


keep GA Drawing sections as it is.

days

days

days

1.5

days

days

days

days

TOTAL EXTRA WORKING DAYS

days

19.5