R1 - Work Plan - RFP For 4 Bridge

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Work Plan of the Project "Study proposal for construction of 4(Four) nos.

of Bridges: One Bridge


over the Korotoa river at Rangpur & Two Bridges over the Balu River at Narayanganj and
another One over the Turag river at Dhaka"
ID

Task
Mode
1

Task Name
F

Mobilization

Topographical Survey

Fixation of Alignment

Physical Planning of the Project.

Acquisition & Relocation Plan

Soil and Sub-Surface Investigation

Material Investigation

9
10

Preparation of Preliminary Design of the Proposed


Bridges.
Preparation of Preliminary Cost Estimation

11

Preparation of Detailed Design of Proposed Bridges.

12

Preparation of Final Cost Estimation

13

Preparation of Prequalification Documents

14

Preparation of Tender Documents

Nov 22, '15


S
T

Dec 6, '15
T

Dec 20, '15


S
T

Jan 3, '16
T

Jan 17, '16


S
T

Jan 31, '16


T

Feb 14, '16


S

Report, Plans & Documents

16

Inception Report

17

Draft Final Report

18

Final Report

Figure No:

WORK PLAN FOR DETAIL ENGINEERING DESIGN

15

Nov 8, '15
T

11/30
12/31
2/11

Task

Project Summary

Manual Task

Start-only

Deadline

Split

Inactive Task

Duration-only

Finish-only

Progress

Milestone

Inactive Milestone

Manual Summary Rollup

External Tasks

Manual Progress

Summary

Inactive Summary

Manual Summary

External Milestone