Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Name:____________________________________________

Grade & Section:____________________________________


Name of the Project:_________________________________

Date:____________
Time:____________
Activity No._______

Objective: To be able to perform a Rat Tail Splice.

POINTS
CRITERIA
Allotte
d
Execution of the proper procedure
1) Tools and material are present.
2) Able to skin the ends of two wires to be spliced
about two inches.
3) Able to place the bare wires in crossed position.
4) Able to twist the bare conductors about six to eight
times.
5) Able to cut off the excess wire if necessary.

5 pts.

Workmanship
1) Proper splice and joint of wire
a. Firmness of twisted wire
b. Neatness of bare conductors

4 pts.

Speed

1 pt.

TOTAL

Gaine
d

10 pts.

Final Rating:_____________

CHECKED BY:
EUNICE S. HABAGAT

You might also like