Inhouse NCR Format

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

INHOUSE NCR REGISTERED DURING THE YEAR 2015-2016

DATE

NCR
NO.

04.04.201
5

P.O.No./ Project/
Drawing No.

NCR Description

Root Cause

Corrective Action

001

During machining of JOF of


Separator Body, it is observed
that the 20% area for 4 -5mm
material is not available for
machining

Sufficient stiffeners are not 5mm Weld buildup


provided around the JOF
carried out on 20%
before welding.
area. Dye penetrant
test carried out on
the weld buildup
area and found
satisfactory.
Machining carried
out and found
satisfactory.

23.04.201
5

002

Channel 120x75 is 2100mm as


against the Drawing requirement
of 2200mm.

18.07.201
5

003

Parallality of Flanged Nozzle


not maintained as per the
requirement.

Preventive
Action

Sufficient
stiffeners are
provided on
JOF before
welding. These
stiffeners will
be removed
only after
stress relieving
operation, to
maintain the
dimensional
stability.
Helper hold the tape at
New channel was cut Fitters are
100mm, and the fitter has
to the required
advised to take
marked to 2200mm.
dimension
care for future
Hence, 100mm difference
jobs. Fitter
was observed.
should confirm
with Helper
before
marking.
Sufficient stiffeners are not Nozzle flange was
Suffiecient
provided around the
removed and
stiffeners will
Flanged nozzle, before
rewelded to maintain be provided
welding
the parallality
around the
nozzles for
future jobs.

Impleme
ntation
status
Impleme
nted.

Impleme
nted.

Impleme
nted.