COLD WATER PLUMBING INSPECTION CHECKLIST - pump

Project Title :
Type of Work :
Location :

No.
A

Clients
Consultant

Remarks

Preparatory
Approved material submission inclusive of accessories

2.

Approved Method Statement

3.

Endorsed Construction Drawing

4.

Approved Shop Drawing

Installation
Pump on parallel and at correct location

2.

Balancing and vibration in controlled

3.

Pump casing material as per contract

4.

Pump impeller material as per contract

5.

Shaft material as per contract

6.

Shaft sleeves installed correctly

7.

Wear ring installed correctly

8.

Bolts, nuts and fastener installed correctly

9.

Base plate and pump assemble installed correctly

10.

Plinth installed correctly

11.

Flexible coupling installed correctly

12.

Shaft seal installed correctly

13.

Bearing installed correctly

14.

No bad / loose electrical terminations

Date :

Main
Contractor

Items To Be Checked

1.

B
1.

RFWI No :

Ref. Drawing No :

Completion

1.

Testing instrument calibrated (to show certificate) to be


checked before testing

2.

Electric motor operate in good working condition

3.

No damages to the pipe installed.

Status of Inspection
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Checked By
Main-Contractor

Verified By
Clients Consultant

Acknowledged By
ER/ERA

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable