Company

LOGO

Contractor

Client :
SANITARY PLUMBING INSPECTION CHECKLIST

Project Title :
Type of Work :
Location :

No.
A

2.

Approved Work Method Statement

3.

Endorsed Construction Drawing

3.

Approved Shop Drawing

Actual piping isometric and drain outlets against shop drawing

3.

Correct adequate pipe gradient

4.

Vents and drains points installed (add temp points for testing as
required)

5.

Correct schedule, sizes and type of piping

6.

Adequate branch reinforcement, pipe support and spacing/bedding


as per specs

7.

Correct sealant used as per specs

8.

Proper joints

9.

Vertical or horizontally aligned and sufficient clearance in-between


other services

10.

Electrical works and pump installation as per specification (if


applicable).

11.

Accessible for maintenance.

2.

Remarks

Installation
Correct material, fitting and accessories

2.

1.

Clients
Consultant

Preparatory
Approved Material, product and accessories as per catalogue,
sample and specification

Date :

Main
Contractor

Items To Be Checked

1.

B
1.

RFWI No :

Ref. Drawing No :

Completion
Requirement for Leak/Flow/Smoke test
No damages to the pipe installed

Status of Inspection
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Checked By
Main-Contractor

Verified By
Clients Consultant

Acknowledged By
ER/ERA

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable , X = Not Acceptable, - = Not Applicable