Professional Documents
Culture Documents
Risk Assessment
Risk Assessment
Hazard
Who/w
hat is
at risk?
Projecto
rs and
laptop(s
).
Existing
Control
Measures
Ensuring all
furniture is
stable
Extension
cable
/cables
All plugins
Not
overloading
the reel
Overheati
ng of
projectors
Projecto
rs
Stacking
of
furniture:
tables and
chairs
Lack of
vision
caused by
projection
s
Tripping/Sl
ipping on
newspape
rs on the
floor
Responsibiliti
es
Ensuring
theres a
constant
airflow in the
room.
Vents/fan is
not
covered/block
ed
Participa Not having
nts and
projectors
us
turned on
unless
necessary.
Preventati
ve
Measures
Keeping
furniture
well away
from
walking
area
Keeping
cables tidy
and away
from
walking
area.
Ensuring
theres a
constant
airflow in
the room.
Vents/fan is
not
covered/blo
cked.
Limiting the
amount of
people
entering the
room.
Warning
participants
before
entering.
Warning
participants
before
entering.
HIGH
Event:
Risk
Ratin
g
MEDIUM
Disney/Reality
Date:
13/12/15
Installation
Humaira Chuhan, Lucas Pelizaro, Roshan Langley
Opening
windows
behind
projectors
Warning
participants
before
entering.
LOW
Venue:
XFG.03