Client:Wapda Contractor:Netracon Neie/Holley Consultant:Gghpc JV Date: Grid Station: Drawing No.
Client:Wapda Contractor:Netracon Neie/Holley Consultant:Gghpc JV Date: Grid Station: Drawing No.
CONTRACTOR:NETRACON NEIE/HOLLEY
CONSULTANT:GGHPC JV
Lean Concrete
Date:
____________________
Grid Station:
___________________________
Drawing No.:
_______________________________________________________________________________
Transformer Bay
Description
Lean
Concre
te
DS (3 No.)
CT (3 No.)
CB (1 No.)
SA (3 No.)
Length
(mm)
Width
(mm)
Depth/He
ight
(mm)
Volume (Cum)
Description
Lean
Concre
te
Date 20.10.2015
DS (Bus) (3
No.)
LT (2 No.)
CT (3 No.)
Length
(mm)
Width
(mm)
Depth/He
ight
(mm)
Volume (Cum)
Description
Lean
Concre
te
LT (2 No.)
DS (Bus) (3
No.)
Length
(mm)
Width
(mm)
Depth/He
ight
(mm)
Volume (Cum)
Description
Lean
Concre
te
PT Bay
DS (3 No.)
PT (3 No.)
Earth Mast
11 Kv Structure
Length
(mm)
Width
(mm)
Contractors Representative:
Representative:
Name:
__________________________
Consultants
Name:
_________________________
Designation:
__________________________
Designation:
_________________________
Signature: __________________________
Signature: _________________________
Date:
Date:
__________________________
_________________________
Lean
Concre
te
Gantry-1
Gantry-2
Gantry
Gantry-3
Gantry-4
Gantry-5
Gantry-6
Length
(Mtr)
Width
(Mtr)
Depth/He
ight
(Mtr)
Volume (Cum)
Contractors Representative:
Representative:
Name:
__________________________
Consultants
Name:
_________________________
Designation:
__________________________
Designation:
_________________________
Signature: __________________________
Signature: _________________________
Date:
Date:
__________________________
_________________________