Demolition old building and underground structures (if, any)

removal of trees and shrubs


top soil removal
Excavation for Footings
Excavation for Trenches
Imported fillng
Antitermite Treatement-(horizontal)
blinding
protection membrane-horizontal
screed
concrete for footings
protection membrane-vertical sides of footing
protection board to vertical and top side of footings
Stub /neck columns (substructure)
protection membrane-vertical sides of column
protection board to vertical sides
Antitermite Treatement-(horizontal)
blinding
Tie Beams/ Ground Beams (substructure)
protection membrane-vertical sides of beams
protection board to vertical sides
Back filling and compaction
disposal of excess material
Antitermite Treatement-(horizontal and around periphery of the building)
Ploythene sheet
Allowance for Isolation joint, Control Joint and Expansion joints
Slab on Grade/ Ground slab (depend on the design)
Steps and Ramps
Superstructure Columns
Superstructure Beams
Core Walls
Staircases
Suspended Slabs (with allowance to MEP services)
Parapets
roof insulaton
External Block works with opening to Doors and windows
Internal Block works with opening to Doors and windows

Internal Plaster
External Plaster
False ceiing and ceiling finishes
Internal paint and tile finshes to walls
External paint and tile finshes to walls
Doors and windows installation
Floor finishes
exteral mep trenches, manholes, septic tanks, sewerage tanks, tie in connections
landscaping
Boundry wall