The Adams-Butzel Recreational

Complex Facility Equipment


Analysis
DAVID PITTS

Ice Arena Floor Padding


The tile for the ice arena needs to be
stripped and replaced throughout
the rink
I would purchase the padding from
Northwest Rubber, a company that
manufactures and installs this type
of flooring
I would need about 3,000 square feet
worth of flooring which would come
to $7,000 with installation base on
speaking with a representative from
the company

Lockers
The lockers in the arena are not properly
bolted to the wall
The lockers just need to be replaced
Lockers of America offers this type or locker
assembled for $430/per three lockers. I would
order three sets which comes to a total of
$1,290

Locker Room Bench


I would replace the benches in this locker room
The room cant be utilized because of its lack of
benches.
RinkSystems offers benches for $200 per
bench and I would need three of them for this
locker room totaling $600

Summary
The total of these three items is $8,890 which is

below the budget of $10,000


These items are very important to the daily functions
of the ice arena and need to be addressed as soon as
possible