2. Design records .
CAD/ CAM data, Part drawings,Specifications.
3. Engineering approval records.
4. DFMEA , PFMEA .
5. Process flow diagrams
6. Dimensional results.
Required for unique manufacturing process.
Supplier to keep master sample .
7. Material test results .
Chemical ,physical , metallurgical ,mechanical
requirements.
Performance test results .
customer requirements.
1.33 > index value > 1.67- Currently acceptable, but
may require some improvement
CONTROL PLAN .-
Define all controls used for process control.
PART SUBMISSION WARRANT
Required for each part submission .
There are five levels.
Level 1- Warrant only .
Level 2- Warrant with product samples.
Level 3- Warrant with product samples and
complete supporting data .
Level 4- Warrant and other requirements defined
by the customer.
Level 5- Warrant with complete data at supplier
end.
Record retention .
Till the part is active plus one calendar year .