VOLUME PEKERJAAN

KEGIATAN : PEMBANGUNAN KANTOR POS SEMARANG SELATAN


TAHUN ANGGARAN 2012

No
A
I
1

Jenis Pekerjaan
LANTAI 1
PEKERJAAN PERSIAPAN
Pembersihan Lahan

Perhitungan

=
=
=

Luas area
25
x
500

Volume

=
=
=

Luas gudang
4
x
4
16
m2

Volume

25m

20
m2

20m

Pembuatan Kantor Sementara


dan Gudang
4m
4m

Pengadaan Air Kerja

Volume

.=

Pembuatan Pagar Sementara

Volume

=
=
=

25m

ls

Keliling gudang
2
x(
25
90
m'

20

2.5

20m

Pengadaan Skafolding

Volume

.=

Pemasangan Bouwplank

Volume

=
=
=

2m

ls

Panjang
2
x
136 m'

Dokumentasi

Volume

.=

ls

Pembuatan Papan Nama

Volume

.=

ls

II
1

PEKERJAAN TANAH
Galian Footplat

Volume

2.5 m

=
=

1.2
x
100.800

1.2
m3

68

2.5 m

1,20 m

Galian Pondasi

Volume

=
=

80

20
10
100

x
173.800

1.1

x
m3

158.00

Galian Rolag

Volume

=
=

0.15
0.480

x
m3

0.2

Volume

=
=

0.1
x
15.800

1
m3

158

Volume

=
=

0.10 x
24.700

247
m3

m2

Volume

=
=

0.03 x
1.210

1.2
m3

1.2

Volume

=
=

0.05 x
0.320

0.2
m3

32

0.15 x
0.667

0.15
m3

16

20
15

Urugan pasir bawah pondasi t=10cm


10
100

Urugan pasir bawah lantai t=10cm


10

Urugan pasir bawah footplat t=3cm


3

120

Urugan pasir bawah rollag t=5cm


5

15

Urugan tanah rollag

Volume

=
=

Urugan tanah kembali

Volume

1
3

91.533

Volume

=
=

0.20 x
31.600

Volume

15

III PEKERJAAN PASANGAN & PLESTERAN


1 Pemasangan
Aanstamping
20
100

x(

100.80

29.650

173.800

m3

1.00
m3

158.000

30

Pas Pondasi Batu kali

80

80

0.3
69.520

+
2

0.8
m3

)x

0.8

80

80

15

Pas. Rolag batu bata

Volume

=
=

0.15 x
0.720

0.15
m3

32

4 Pas. Bata camp 1 : 5

Volume sb. X

Volume sb.Y

=
=

Total volume
5

Pas. Bata camp 1 : 3

Volume sb. X

Volume sb. Y
Total volume

=
=
=
=
=

58.650
+
5
+
80
+
7.421
+
14.013
+
7.421
+
22.2
2
253.018
m
47.55
+
10
+
9
+
4.229
+
21.144
+
14.013
+
10.659
+
5.863
+
11.421
+
12.736
243.513
m2
253.018
+
243.513
496.531 cm
0.35
:
4
x
253.018
2
22.139075 m

=
=
=
=
=
=

0.35
21.307
22.139
43.446
2
x(
993.062

:
4
x
m2
+
21.307
cm
253.018
+
m2

243.513

Plesteran camp 1 : 5

Volume

243.513

Plesteran camp 1 : 3

Volume

=
=

2
x(
86.892

22.139
m2

21.307

Acian

Volume

=
=

2
x(
1079.95

496.531
m2

43.446

Volume

=
=

1.20 x
12.096

1.20
m3

0.3 x

Volume

=
=

1.20 x
4.032

1.20
m3

0.1 x

Volume

=
=

0.20 x
5.250

0.25
m3

105

IV PEKERJAAN BETON
1 Foot plat 120/120

KOLOM STRUKTUR30x30
8-15
D12-20
10
LANTAI KERJAT=5CM

20

-2.50
120

25
Lantai kerja footplat t=10cm
20

Sloof 20/25

20
15

20
15

Sloof 15/20

Volume

=
=

0.15 x
1.590

0.20
m3

Volume

=
=

0.30 x
5.317

0.30
m3

53

30

30

Kolom Pedestel 30/30

30

30

Kolom 30/30

Volume

=
=

0.30 x
10.080

0.30
m3

Volume

=
=

0.15 x
2.520

0.15
m3

Volume

=
=

0.20 x
8.040

0.30
m3

134

Volume

=
=

0.15 x
1.500

0.20
m3

50

Volume

=
=

0.11
21.890

x
m3

199

m2

Volume

=
=

0.10
5.950

x
m3

59.5

m2

Volume

=
=

0.10
0.300

x
m3

Volume

15
15

Kolom 15/15
30
20

Balok 20/30

20
15

Balok 15/20

11

10

10 Pelat beton Lantai 2 t= 11 cm


10

11 Pelat dak beton t= 10 cm


24
23
22
21
20
19
18
17
16
15

12 Kantilever t= 10 cm
14

13

12

11
10
09
08

07
06
05
04
03
02
01

13 Tangga Beton t= 15 cm

KUSEN 6/12

KUPINGAN 10cm
KACA 5 mm
ANGKUR

PEKERJAAN KUSEN PINTU + JENDELA


NEUT BETON

POT. 2-2
SKALA 1 : 20

1.5
x 0.35
( 0.15 x
4.769
m3

x(
3

3.77 +
x 1.23

NEUT BETON

2
Kusen dan daun
pintu
P1 , 4bh
POT. 2-2
SKALA 1 : 20

Kusen
Volume

POT. 1-1
SKALA 1 : 20

P1 ( 6 bh )
SKALA 1 : 20

2
KUPINGAN 10cm

ANGKUR

KUSEN 6/12

HANDLE PINTU

NEUT BETON

POT. 2-2
SKALA 1 : 20

P2 ( 7 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

=
=

0.06 x
0.209

0.12
m3

7.24

NEUT BETON

2
POT. 2-2 pintu P2, 1bh
Kusen dan daun
SKALA 1 : 20

Kusen
Volume

=
=

0.06 x
0.043

0.12
m3

Daun

=
=

0.80 x
2.000

2.50
m3

Total volume

=
=

P2 ( 7 bh )
SKALA 1 : 20

6.04

POT. 1-1
SKALA 1 : 20

ANGKUR

0.043
2.043

+
cm

2.000

KUSEN 6/12

HANDLE PINTU

NEUT BETON

2
2
Kusen dan daun pintuPOT. 2-P3,
4bh
SKALA 1 : 20

Kusen
Volume
P3 ( 4 bh )

=
=

0.06 x
0.043

0.12
m3

6.04

Daun

=
=

0.80 x
8.000

2.50
m3

4.00

Total volume

=
=

+
cm

8.000

POT. 1-1
SKALA 1 : 20

SKALA 1 : 20

2
KACA 5 mm

POT. 2-2

0.043
8.043

SKALA 1 : 20

Kusen dan daun pintu P4, 5bh


P4 ( 9 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

Volume

.=

unit

Kusen J1,1bh
Kusen
Volume

=
=

0.06 x
0.111

0.12
m3

15.5

=
=

0.06 x
0.113

0.12
m3

15.6

=
=

0.06 x
0.039

0.12
m3

5.38

Kusen J2
2

Kusen
Volume

KUPINGAN 10cm
ANGKUR

KUSEN 6/12

KACA 5 mm

2
POT. 2-2
SKALA 1 : 20

J3 ( 11 bh )

POT. 1-1
SKALA 1 : 20

SKALA 1 : 20

Kusen dan daun jendela J3, 2bh


Kusen
Volume

2
ANGKUR

KUSEN 6/12

1
2

Daun

= (( 0.45 x
=
0.379

2.00 ) - ( 1.92
m3

BV ( 9 bh )
SKALA 1 : 20

Total volume

=
=

0.039
0.418

+
cm

0.379

Kusen BV
Kusen
Volume

=
=

0.06 x
0.089

0.12
m3

2.48

VI PEKERJAAN PLAFOND & CAT


1 Gypsum Board

Volume

24.00
28.00
238

+
+
m2

168.00
12

74.00

55.00
18.00
232.50

m2
496.531
m2

=
2

List Plafond

Volume

Pengecatan tembok

Volume

=
=

2
x(
1079.95

Pengecatan plafond

Volume

24.00
28.00
238

=
VII
1
2
3
4

+
+
m2

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Kunci tanam biasa
Kunci tanam pintu WC
Engsel pintu
Kaca P1, 4bh

Volume
Volume
Volume
Volume

=
=
=
=
=

9
5
30
1
20.0

bh
bh
bh
x
m2

Kaca J1

Volume

=
=

0.50
1.8

x
m2

3.5

Kaca J2

Volume

=
=

4.70
14.1

x
m2

Kaca J3

Volume

=
=

1.92
1.4

x
m2

Kaca BV

Volume

=
=

0.25
0.6

x
m2

PEKERJAAN INSTALASI LISTRIK


Lampu TL 2x18 W
Lampu SL 15 W
Saklar tunggal
Saklar ganda
Stop kontak
Box panel
Instalasi titik lampu

Volume
Volume
Volume
Volume
Volume
Volume
Volume

=
=
=
=
=
=
=

14
29
5
7
13
1
43

bh
bh
bh
bh
bh
unit
bh

Volume

28 +
+
4
101.00

VIII
1
2
3
4
5
6
7

IX PEKERJAAN LANTAI
1 Pasang Keramik granito 60 x 60

2.5

168.00
12

43.446

0.37

0.25

20
+
m2

+
3

Pasang Keramik granito 40 x 40

Volume

=
=

6 +
26.00

8
m2

Pasang Keramik lantai 30 x 30

Volume

=
=

36 +
52.00

16
m2

Pasang Keramik lantai 30 x 30 (Tangga)

Volume

=
=

10 +
14.04

3.69
m2

Pasang Keramik lantai 20 x 20


(KM/WC dan teras)

Volume

=
=

15 +
36.00

6
m2

X
1
2
3
4
5
6
7
8
9
10

PEKERJAAN SANITASI
Closet jongkok
Wastafel
Septictank & peresapan
Kran air
Pipa PVC 1/2"
Pipa Galvanis 3/4"
Bak kontrol
Ground tank
Tandon air
Floor drain

Volume
Volume
Volume
Volume
Volume
Volume
Volume
Volume
Volume
Volume

=
=
=
=
=
=
=
=
=
=

5.0
5.0
2.0
9.0
24.7
87.5
1.0
1.0
1.0
5.0

bh
bh
unit
bh
m'
m'
bh
bh
bh
bh

12

B
I
1

LANTAI 2
PEKERJAAN PASANGAN
Pas. Bata camp 1 : 5

30

Pas. Bata camp 1 : 3

Volume sb. X

Volume sb.Y

=
=

Total volume
Volume sb. X

30

Volume sb. Y
15
15

Total volume

=
=
=
=
=

47.100
+
42.35
6.01 +
22.066
+
+
56 +
6.013
2
217.504
m
38.54
+
122.916
12.987
+
8.987
+
24.387
244.651
m2
217.504
+
244.651
462.155 cm
0.35
:
4
x
2
19.032
m

+
18.013

+
+

217.504

=
=
=
=
=
=

0.35
21.407
19.032
40.439
2
x(
924.31

:
4
x
2
m
+
21.407
cm
217.504
+
2
m

244.651

Plesteran camp 1 : 5

Volume

244.651

Plesteran camp 1 : 3 20

Volume

=
=

2
x(
80.877

19.032
m2

21.407

Volume

=
=

2
x(
1005.187

462.155
m2

40.439

Volume

=
=

0.30 x
9.720

0.30
m3

Volume

=
=

0.15 x
2.160

0.15
m3

Volume

=
=

0.15 x
4.020

0.20
m3

134

15

Acian

10

II
1

PEKERJAAN BETON
Kolom 30/30

KUSEN 6/12

KUPINGAN 10cm
KACA 5 mm
ANGKUR

Kolom 15/15

NEUT BETON

POT. 2-2

SKALA 1 : 20

Ring Balok 15/20


POT. 1-1
SKALA 1 : 20

P1 ( 6 bh )
SKALA 1 : 20

Kantilever t=10 cm

Volume
2

=
=

0.10
10.200

=
=

0.06 x
0.104

x
m3

51

0.12
m3

7.24

KUPINGAN 10cm

ANGKUR

KUSEN 6/12

HANDLE PINTU

III PEKERJAAN KUSEN PINTU + JENDELA


1 Kusen P1 , 2bh
1

Kusen
Volume

NEUT BETON

POT. 2-2
SKALA 1 : 20

P2 ( 7 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

2
KACA 5 mm
ANGKUR

KUSEN 6/12

1
2

BV ( 9 bh )
SKALA 1 : 20

POT. 2-2

SKALA 1 : 20

P4 ( 9 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

2
KACA 5 mm
ANGKUR

KUSEN 6/12

1
2

Kusen dan daun pintu P2, 4bh


BV ( 9 bh )

Kusen
Volume

SKALA 1 : 20

=
=

0.06 x
0.043

0.12
m3

6.04

Daun

=
=

0.80 x
8.000

2.50
m3

4.00

Total volume

=
=

+
cm

8.000

POT. 2-2
SKALA 1 : 20

P4 ( 9 bh )

POT. 1-1
SKALA 1 : 20

SKALA 1 : 20

0.043
8.043

2
KUPINGAN 10cm

ANGKUR

KUSEN 6/12

KACA 5 mm

Kusen P4 PVC, 5bh


Volume

.=

unit

0.06 x
0.039

0.12
m3

POT. 2-2
SKALA 1 : 20

J3 ( 11 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

KACA 5 mm

KUPINGAN 10cm

ANGKUR

KUSEN 6/12

Kusen dan daun jendela J3, 9bh


2

POT. 2-2

SKALA 1 : 20

J5 ( 3 bh )

Kusen
Volume

POT. 1-1

SKALA 1 : 20

SKALA 1 : 20

Daun
KACA 5 mm

=
=

= (( 0.45 x
=
1.706

5.38

2.00 ) - ( 1.92
m3

2
KUPINGAN 10cm

ANGKUR

Total volume

KUSEN 6/12

=
=

0.039
1.745

+
cm

1.706

KUPINGAN 10cm

ANGKUR

KUSEN 6/12

POT. 2-2
SKALA 1 : 20

J6 ( 1 bh )
POT. 1-1

SKALA 1 : 20

SKALA 1 : 20

Kusen J5
Kusen
Volume

KACA 5 mm

2
KUPINGAN 10cm

ANGKUR

KUSEN 6/12

POT. 2-2

SKALA 1 : 20

J6 ( 1 bh )
SKALA 1 : 20

POT. 1-1
SKALA 1 : 20

=
=

0.06 x
0.114

0.12
m3

5.28

Kusen J6

Kusen
Volume

Kusen BV

IV PEKERJAAN PLAFOND & CAT


1 Gypsum Board

0.06 x
0.084

0.12
m3

11.6

=
=

0.06 x
0.124

0.12
m3

8.6

=
=

0.06 x
0.071

0.12
m3

2.48

Kusen J7,2bh

Kusen
Volume

=
=

List Plafond

Kusen
Volume

Volume

Volume

=
=

36.0
40.0
184

+
+
m2

4.00

107.55

m2

40.0
25.0 +

85.55

+
6

Pengecatan tembok

Volume

=
=

2
x(
1005.187

Pengecatan plafond

Volume

36.0
40.0
184

V
1
2
3

PEKERJAAN ATAP
Nok
Papan Ruiter
Papan Listplank

Volume
Volume
Volume

=
=
=

0.08
0.02
0.03

462.155
m2
+
+
m2

x
x
x

0.12
0.2
0.3

40.0
25.0 +

x
x
x

12
12
73

40.439

+
6

=
=
=

Atap Genteng
Volume I

=
=

Volume II

158.620
1
2

=
Volume III

4.19

1
2

2.5

3.05

=
=
=

158.620
+
+
7.625
356.986
m2
356.986
m2

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Kunci tanam biasa
Kunci tanam pintu WC
Engsel pintu
Kaca J3, 9bh

Volume
Volume
Volume
Volume

=
=
=
=
=

7
4
33
1.92
6.39

bh
bh
bh
x
m2

Kaca J5

Volume

=
=

0.40
2.40

Kaca J6

Volume

=
=

Kaca J7

Volume

Kaca BV

7.21

8.15

)x

7.21

3.05

m2

Volume total

VI
1
2
3
4

7.21

m2

15.250

Volume total

m2
86.520
+
+
15.250

0.37

x
m2

2.00

3.00
7.74

x
m2

2.58

=
=

3.00
3.24

x
m2

1.08

Volume

=
=

0.25
0.50

x
m2

0.25

Volume
Volume
Volume

=
=
=

17
15
6

bh
bh
bh

1000

PEKERJAAN INSTALASI LISTRIK


Lampu TL 2x18 W
Lampu SL 15 W
Saklar tunggal

+
2

Rangka Atap

)x

m2

7.625

VII
1
2
3

12

88.971

=
Volume V

18
m2

86.520

=
Volume IV

+
2

4
5
6

Saklar ganda
Stop kontak
Instalasi titik lampu

VIII PEKERJAAN LANTAI 500


1 Pasang Keramik lantai 40 x40

Pasang Keramik lantai 30 x30

Pasang Keramik lantai 20 x 20 (KM/WC)

IX
1
2
3
4
5
6

PEKERJAAN SANITASI
Closet jongkok
Wastafel
Kran air 80
Pipa PVC
2"
20
10 1/2"
Pipa PVC
100
Floor Drain

Volume
Volume
Volume

=
=
=

Volume

Volume

=
=
=

=
=

Volume
Volume
Volume
Volume
Volume
Volume

18 +
29.00

7
m2

=
=
=
=
=
=

5
6
32

bh
bh
unit

50

+
12
+
16.5
119.00
m2
32 +
6
38.00
m2
+

4
2.0
10
6.4
9.0
4

bh
bh
bh
m'
m'
bh

28

PEKERJAAN RANGKA BAJA

10
100

20

Batang Tarik
Batang Vertikal
Batang Diagonal
Batang Miring

=
=
=
=

Kuda-kuda Baja, 2bh

=
=

Batang Tarik
Batang Vertikal
Batang Diagonal
Batang Miring

=
=
=
=

Kuda-kuda Baja, 2bh

=
=

100

30

1
2
3
4
5
6

Kuda-kuda Baja
1/2 Kuda-kuda 80
Jurai
Gording CNP 125.50.20.3,2 mm
Baut 10mm
Baut 12mm
80

C
I
1

INFRASTRUKTUR
PEKERJAAN TANAH
Galian Pondasi Pagar

Volume
Volume
Volume
Volume
Volume
Volume

Volume

=
=
=
=
=
=

51
x
14.9
x
16.4
x
74.3
x
Jumlah total
313.1
626.22

156.55
313.1

Kg

1
1
1
1

2
Kg

1.1

62.70020

57.00

m3

15

15
Urugan Pasir bawah pondasi,
t=10cm
15

Urugan tanah kembali

20

Volume

=
=

Volume

1
3

20.900

15

II
1

PEKERJAAN PASANGAN
Pemasangan Aanstamping

=
=
=
=
=

Kg
Kg
Kg
Kg
buah
buah

=
=
=
=
=

51
x
14.9
x
16.4
x
74.3
x
Jumlah total

626.2
313.10
148.53
835.213
160
288

2
2
2
2

0.1
x
5.700

x(

1
m3

62.70
m3

57

Volume

=
=

Volume

1.00
m3

57.000

Pas Pondasi Batu kali

0.20 x
11.400

0.3
25.080

+
2

0.8

)x

0.8

m3

Pas. Bata camp 1 :2m5


Volume sb. X

=
=

1 x
18
+
8.550

0.15 x (
8 )
m2

III PEKERJAAN BETON


1 kolom 15/15
Volume

=
=

0.15 x
0.338

0.15
m3

15

Volume

=
=

0.15 x
1.710

0.20
m3

57

Volume

=
=

25
x
257.100

20
m3

242.9

Volume

9.0

bh

Volume
Volume
Volume

=
=
=

2.0
9.0
9.0

can
bh
bh

80

20
10
100

sloof 15/20

10
100

IV PEKERJAAN LANTAI
1 Pasang paving block
10

V
1

PEKERJAAN INSTALASI AC & VENT. MEKANIK


Pengadaan dan Pemasangan Unit AC Sentral
- Type : Air cooled split duct
Kapasitas pendingin : 100.000,00 btu / h
Karakteristik : 380 V, 1 Ph, 50 Hz
- Refrigerant : R - 22
- Dudukan out door
- Ongkos Pasang
20

D
I
1

100

POS SATPAM 2 UNIT


PEKERJAAN PERSIAPAN
Pembersihan Lahan

Volume

30

Pemasangan Bouwplank

Volume

80

=
=
=

Luas area
2
x
8

=
=
=

Panjang
2
x
16
m'

2
m2
x
4

jumlah
x
2

80

II
1

PEKERJAAN TANAH
Galian Pondasi

Volume

=
=

x
17.600

1.1

x
m3

Urugan pasir bawah pondasi t=10cm

Volume

=
=

0.1
x
1.600

1
m3

Urugan pasir bawah lantai t=10cm

Volume

=
=

0.10 x
0.800

4
m3

Urugan tanah kembali

Volume

15
15

1
3

x(

5.867

17.60
m3

III PEKERJAAN PASANGAN & PLESTERAN


1 Pemasangan Aanstamping

Volume

=
=

Volume

20

0.20 x
3.200

1.00
m3

8x

15

Pas Pondasi Batu kali


10

0.3

=
=

+
2

3.520
7.04
m3

0.8
m3

)x

0.8

2
KUPINGAN 10cm

ANGKUR

KUSEN 6/12

HANDLE PINTU

Pas. Bata camp 1 : 5


1

Volume

=
=

2 x
64.000

Volume sb. X

=
=

0.35
5.6

Volume

=
=

4 x
m2

NEUT BETON

Pas. Bata camp


1 2: 3
POT. 2-2
SKALA 1 : 20

Plesteran camp 1 : 5
P2 ( 7 bh )
SKALA 1 : 20

POT. 1-1

:
m2

x(

64.000
m2

128

64.000

Plesteran camp 1 : 3

Volume

=
=

2
x(
11.200

5.600
m2

Acian

Volume

=
=

2
x(
139.20

64.000
m2

Volume

=
=

0.15 x
0.480

0.20
m3

Volume

=
=

0.15 x
0.720

0.15
m3

Volume

=
=

0.15 x
0.480

0.20
m3

SKALA 1 : 20

IV PEKERJAAN BETON
1 Sloof 15/20

5.600

KACA 5 mm

KUPINGAN 10cm

ANGKUR

KUSEN 6/12

POT. 2-2

SKALA 1 : 20

Kolom 15/15
J4 ( 2 bh )
SKALA 1 : 20

Ring Balk 15/20

POT. 1-1
SKALA 1 : 20

Pelat dak beton t= 10 cm

Volume

=
=

0.10
1.250

x
m3

2.5

2.5

V
1

PEKERJAAN KUSEN PINTU + JENDELA


Kusen dan daun pintu P2, 1bh
Kusen
Volume

=
=

0.06 x
0.043

0.12
m3

6.04

Daun

=
=

0.80 x
4.000

2.50
m3

2.00

Total volume

=
=

+
cm

4.000

0.12
m3

0.043
4.043

Kusen J4
Kusen
Volume

=
=

0.06 x
0.108

7.5

VI PEKERJAAN PLAFOND & CAT


1 Gypsum Board

Volume

=
=

2.00
8

x
m2

2.00

Volume

4.00

6.00

48.00

m2

List Plafond

Pengecatan tembok

Volume

=
=

2
x(
139.20

Pengecatan plafond

Volume

=
=

2.00
8

VII PEKERJAAN KUNCI, KACA & PENGGANTUNG


1 Kunci tanam biasa
Volume

bh

64.000
m2
x
m2

2.00

5.600

2
3

VIII
1
2
3
4

Engsel pintu
Kaca J4

Volume
Volume

=
=
=

6
0.50
6.0

bh
x
m2

PEKERJAAN INSTALASI LISTRIK


Lampu SL 15 W
Saklar tunggal
Stop kontak
Instalasi titik lampu

Volume
Volume
Volume
Volume

=
=
=
=

2
2
2
2

bh
bh
bh
bh

Volume

=
=

IX PEKERJAAN LANTAI
1 Pasang Keramik lantai 30 x 30

2 x
8.00

2
m2

PEKERJAAN

ANTOR POS SEMARANG SELATAN


GGARAN 2012

Perhitungan

28

28

173.800

158.00

44.813
14.013
+

+
14

37.608
+
21.144
+
47.7
+
11.59

253.018

243.513

243.513

21.307

43.446

28

28

28

28

28

4.26
)

0.37 )) x

6.00

85.50

43.446

6.00

32

12

19.949
18.013

14.013

22.821

217.504

244.651

244.651

21.407

40.439

27

24

0.37 )) x

2.00

9.0
+

+
28

18.00

40.439

9.0
+

+
28

0.1152
0.048
0.657

m3
m3
m3

88.971

4.5

102.0
29.78
32.80
148.53
313.07046

+
kg

51.0
14.89
16.40
74.26
156.54

+
kg

25

57.00

8.00

64.000

5.600

2.00

2.00

5.600

2.00

VOLUME PEKERJAAN
KEGIATAN : PEMBANGUNAN RUMAH TINGGAL SEDERHANA BLOK E
TAHUN ANGGARAN 2013

NO

JENIS PEKERJAAN (SKET)

PERHITUNGAN

VOLUME

BQ (BILL OF QUANTITY)
NO.
I
1
2
3
4
5
6
7
8
II
1
2
3
4
5
6

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pembersihan Lahan
Pengukuran dan pemasangan bowplank
Pembuatan Direksi Keet
Pengadaan Air kerja
Pembuatan pagar sementara
Pengadaan skafolding
Dokumentasi
Papan IMB
PEKERJAAN TANAH
Galian pondasi t=90 cm
Galian Pondasin rollag t=80 cm
Urugan pasir bawah pondasi t=10cm
Urugan pasir bawah rollag t=10cm
Urugan pasir bawah lantai t=10cm
Urugan tanah kembali

VOL

SAT
m2
m2
m2
ls
m2
ls
ls
ls

NO.
VI
1
2
3
4

URAIAN PEKERJAAN
PEKERJAAN LANTAI & DINDING
Pasang Keramik polos 30 x 30, ex. Asia Tile
Pasang Keramik lantai 20 x 20 (KM/WC)
Pasang Keramik dinding 20 x 25 (KM/WC)
Pasang List Keramik 10 x 20 (KM/WC)

VII
1

PEKERJAAN KUSEN PINTU + JENDELA


Kusen P1 , 4bh
Daun pintu P1
P2 pintu PVC set kamar mandi
Kusen J1 , 2bh
Daun jendela J1
Kusen J2 , 4bh
Daun jendela J2
Kusen J3 , 2bh
Kusen J4 , 1bh
Daun jendela J4
Kusen J5 , 1bh
Daun jendela J4

m3
m2
unit
m3
m2
m3
m2
m3
m3
m2
m3
m2

VIII
1
2
3
4
5

PEKERJAAN ATAP
Pasang konstruksi kuda-kuda rangka kayu kamfer bentang 7,5m
Pasang gording 8/12 kayu kamfer
Pasang usuk 5/7 dan reng 2/3 kayu jati
Pasang Lisplank 3/30 kayu kamfer
Pasang atap genteng kodok/ glasur

m3
m3
m3
m1
m3

IX
1
2
3

PEKERJAAN LANGIT-LANGIT
Pasang rangka kayu jati plafond gypsumboard (60x120), t=9mm,
Pasang plafond gypsumboard (60x120), t=9mm,
List plafond gypsum lebar 5-10 cm

m3
m2
m1

X
1
2
3
4
5
6
7
8

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Pasang kunci tanam pintu 2 slag
Pasang handle pintu
Engsel pintu standar 4"
Engsel jendela standar 3"
Engsel bebas J5
Pasang grendel jendela
Pasang kaca t=5mm
Pasang angkur pintu & jendela

bh
bh
bh
bh
bh
bh
m2
bh

2
3
m3
m3
m3
m3
m3
m3

4
5
6
7

III
1
2
3

PEKERJAAN PONDASI
Pas Pondasi Batu kali 1pc:5pp
Pas Pondasi Batu kali rollag
Pas. Rollag batu bata 1pc:3pp

m3
m3
m3

IV
1
2
3
4
5
6
7
8

PEKERJAAN BETON
Kolom 15/30
Kolom 15/15
Kolom 15/15 gunungan
Sloof 15/20
Ring Balk 15/15
Pelat dak beton, t=11 cm
Lantai kerja bawah keramik t=5 cm
Kantilever, t=10 cm

m3
m3
m3
m3
m3
m3
m3
m3

V
1
2
3
4
5

PEKERJAAN DINDING & PLESTERAN


Pas. Batu bata 1pc:5pp
Pas. Batu bata 1pc:3pp
Plesteran dinding 1pc:5pp
Plesteran dinding 1pc:3pp
Acian

m
m2
m2
m2
m2
2

VOL

SAT
m2
m2
m2
m2

NO.
URAIAN PEKERJAAN
XI PEKERJAAN SANITASI AIR
Instalasi Air Bersih
1 Pasang pipa PVC 3/4"
2 Pasang pipa galvanis 1"
3 Pasang keni 1"
4 Pasang Tee 1" ke 3/4"
5 Pasang penyambung air bersih dari PAM
Instalasi Air Kotor
1 Pasang pipa PVC 3"
2 Pasang keni 1"
3 Pasang Tee 2" ke 3"
4 Pasang Septictank & Peresapan
5 Pasang bak kontrol
6 Pasang Closet jongkok, ex.INA
7 Floor drain KM/WC
8 Wastafel
9 Kran air
9 Tandon air
10 Pasang bak mandi fiberglass v=1m3

VOL

SAT

m1
m1
bh
bh
bh
m1
bh
bh
unit
bh
bh
bh
bh
bh
bh
unit

XII
1
2
3
4
5
6
7
8
9
10

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi lampu kabel NYM3 x 2,5mm
Pasang saklar tunggal
Pasang saklar ganda
Pasang Stop kontak
Lampu SL 18 W
Lampu SL 10 W
Pasang panel listrik
Pasang Box sekering
Pasang penyambung daya ke PLN
Instalasi titik lampu

m1
bh
bh
bh
bh
bh
bh
bh
unit
bh

XIII
1
2
3
4
5

PEKERJAAN PENGECATAN
Cat tembok dalam, ex. Mowillex
Cat tembok luar, ex. Catylac
Pengecatan plafond
Pengecatan list plafond
Pengecatan kusen pintu &jendela

m2
m2
m2
m1
m2

XIV
1
2
3
4

PEKERJAAN FINISHING
Pembersihan lahan setelah pekerjaan
Landscaping taman
Pasang ornamen batu alam
Pasang paving block

m2
unit
m2
m2

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

No.

Uraian Pekerjaan

I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN BETON
PEKERJAAN DINDING & PLESTERAN
PEKERJAAN LANTAI & DINDING
PEKERJAAN KUSEN PINTU + JENDELA
PEKERJAAN ATAP
PEKERJAAN LANGIT-LANGIT
PEKERJAAN KUNCI, KACA & PENGGANTUNG
PEKERJAAN SANITASI AIR
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN PENGECATAN
PEKERJAAN FINISHING

Total Harga
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah ( A )
PPN 10% ( B )
Jumlah Total ( B )
Jumlah Dibulatkan

Rp
Rp
Rp
Rp
Terbilang :

Yogyakarta,

Mei 2013

Perencana

RENCANA ANGGARAN BIAYA (RAB )


Err:509
Err:509
NO.
I
1
2
3
4
5
6
7
8

II
1
2
3
4
5
6

III
1
2
3

IV
1
2
3
4
5
6
7
8

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pembersihan Lahan
Pengukuran dan pemasangan bowplank
Pembuatan Direksi Keet
Pengadaan Air kerja
Pembuatan pagar sementara
Pengadaan skafolding
Dokumentasi
Papan IMB

PEKERJAAN TANAH
Galian pondasi t=90 cm
Galian Pondasin rollag t=80 cm
Urugan pasir bawah pondasi t=10cm
Urugan pasir bawah rollag t=10cm
Urugan pasir bawah lantai t=10cm
Urugan tanah kembali

PEKERJAAN PONDASI
Pas Pondasi Batu kali 1pc:5pp
Pas Pondasi Batu kali rollag
Pas. Rollag batu bata 1pc:3pp

PEKERJAAN BETON
Kolom 15/30
Kolom 15/15
Kolom 15/15 gunungan
Sloof 15/20
Ring Balk 15/15
Pelat dak beton, t=11 cm
Lantai kerja bawah keramik t=5 cm
Kantilever, t=10 cm

VOL
177.000
112.000
16.000
1.000
55.400
1
1
1

92.615
5.581
8.991
0.581
6.150
32.732

42.848
2.325
0.062

0.545
1.755
0.558
2.997
2.248
1.210
3.075
0.739

SAT
m2
m2
m2
ls
m2
ls
ls
ls

m3
m3
m3
m3
m3
m3

m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3

HARGA SAT.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,300.00 Rp.
747,887.50 Rp.
500,000.00 Rp.
128,560.00 Rp.
664,418.75 Rp.
106,960.00 Rp.
750,000.00 Rp.
750,000.00 Rp.

Err:509 Rp.
29,750.00 Rp.
29,750.00 Rp.
119,900.00 Rp.
Err:509 Rp.
29,750.00 Rp.

Err:509 Rp.
461,305.00 Rp.
66,115.00 Rp.

Err:509 Rp.
526,634.00 Rp.
2,952,411.00 Rp.
2,952,411.00 Rp.
5,710,371.00 Rp.
5,710,371.00 Rp.
5,710,371.00 Rp.
2,889,931.00 Rp.

JML HARGA

JML TOTAL

1,115,100.00
83,763,400.00
8,000,000.00
128,560.00
36,808,798.75
106,960.00
750,000.00
750,000.00
Rp.

131,422,818.75

Rp.

Err:509

Rp.

Err:509

Rp.

Err:509

Err:509
166,033.56
267,482.25
69,703.87
Err:509
973,780.57

Err:509
1,072,718.65
4,118.14

Err:509
924,479.66
1,648,773.92
8,848,375.77
12,835,486.42
6,907,978.56
17,559,390.83
2,135,659.01

V
1
2
3
4
5

VI
1
2
3
4

VII
1
2
3
4
5
6
7

VIII
1
2
3
4
5

IX
1
2

PEKERJAAN DINDING & PLESTERAN


Pas. Batu bata 1pc:5pp
Pas. Batu bata 1pc:3pp
Plesteran dinding 1pc:5pp
Plesteran dinding 1pc:3pp
Acian

PEKERJAAN LANTAI & DINDING


Pasang Keramik polos 30 x 30, ex. Asia Tile
Pasang Keramik lantai 20 x 20 (KM/WC)
Pasang Keramik dinding 20 x 25 (KM/WC)
Pasang List Keramik 10 x 20 (KM/WC)

PEKERJAAN KUSEN PINTU + JENDELA


Kusen P1 , 4bh
Daun pintu P1
P2 pintu PVC set kamar mandi
Kusen J1 , 2bh
Daun jendela J1
Kusen J2 , 4bh
Daun jendela J2
Kusen J3 , 2bh
Kusen J4 , 1bh
Daun jendela J4
Kusen J5 , 1bh
Daun jendela J4

PEKERJAAN ATAP
Pasang konstruksi kuda-kuda rangka kayu kamfer bentang 7,
Pasang gording 8/12 kayu kamfer
Pasang usuk 5/7 dan reng 2/3 kayu jati
Pasang Lisplank 3/30 kayu kamfer
Pasang atap genteng kodok/ glasur

PEKERJAAN LANGIT-LANGIT
Pasang rangka kayu jati plafond gypsumboard (60x120), t=9
Pasang plafond gypsumboard (60x120), t=9mm,

222.391
28.211
444.782
56.422
501.204

57.000
2.250
1.020
5.180

0.151
6.921
1.000
0.060
0.573
0.130
1.488
0.086
0.046
0.230
0.125
2.056

0.916
0.177
0.874
20.500
78.900

0.806
57.000

m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m2
unit
m3
m2
m3
m2
m3
m3
m2
m3
m2

m3
m3
m3
m1
m3

m3
m2

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

6,500,000.00 Rp.
6,500,000.00 Rp.
6,500,000.00 Rp.
250,000.00 Rp.
6,500,000.00 Rp.

26,395.00 Rp.
19,303.00 Rp.
54,794.10 Rp.
54,794.10 Rp.

Rp.
13,630.00 Rp.
Rp.
2,203,385.10 Rp.
Rp.
41,998.00 Rp.
Rp.
28,700.00 Rp.
Rp.
0.00 Rp.
Rp.
0.00 Rp.
Rp.
690.00 Rp.
Rp.
76,000.00 Rp.
Rp. Err:509
Rp.
Rp.
0.00 Rp.
Rp.
71,200.00 Rp.
Rp.
70,600.00 Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.

Err:509 Rp.
129,099.00 Rp.
112,492.69 Rp.
112,492.69 Rp.
114,655.00 Rp.

319,825.00 Rp.
984,825.00 Rp.

1,445,541,500.00
183,371,500.00
2,891,083,000.00
14,105,500.00
3,257,826,000.00
Rp.

7,791,927,500.00

Rp.

1,887,670.17

Rp.

Err:509

Rp.

Err:509

1,504,515.00
43,431.75
55,889.98
283,833.44

2,056.93
15,249,187.60
41,998.00
1,727.51
0.00
0.00
1,026.72
6,566.40
Err:509
0.00
8,889.18
145,153.60

Err:509
22,804.05
98,318.62
2,306,100.25
9,046,279.50

257,778.95
56,135,025.00

List plafond gypsum lebar 5-10 cm

70.000

m1

Rp.

2,203,385.10 Rp.

154,236,957.00
Rp.

210,629,760.95

X
1
2
3
4
5
6
7
8

XI
1
2
3
4
5
1
2
3
4
5
6
7
8
9
9
10

XII
1
2
3
4
5
6
7
8

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Pasang kunci tanam pintu 2 slag
Pasang handle pintu
Engsel pintu standar 4"
Engsel jendela standar 3"
Engsel bebas J5
Pasang grendel jendela
Pasang kaca t=5mm
Pasang angkur pintu & jendela

PEKERJAAN SANITASI AIR


Instalasi Air Bersih
Pasang pipa PVC 3/4"
Pasang pipa galvanis 1"
Pasang keni 1"
Pasang Tee 1" ke 3/4"
Pasang penyambung air bersih dari PAM
Instalasi Air Kotor
Pasang pipa PVC 3"
Pasang keni 1"
Pasang Tee 2" ke 3"
Pasang Septictank & Peresapan
Pasang bak kontrol
Pasang Closet jongkok, ex.INA
Floor drain KM/WC
Wastafel
Kran air
Tandon air
Pasang bak mandi fiberglass v=1m 3

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi lampu kabel NYM3 x 2,5mm
Pasang saklar tunggal
Pasang saklar ganda
Pasang Stop kontak
Lampu SL 18 W
Lampu SL 10 W
Pasang panel listrik
Pasang Box sekering

5
5
15
14
8
9
11.8
60

bh
bh
bh
bh
bh
bh
m2
bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

27.400
32.500
8
1
1

m1
m1
bh
bh
bh

Rp.
Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00
0.00
0.00
0.00
0.00

31.500
2
1
1
2
1
1
1
4
1
1

m1
bh
bh
unit
bh
bh
bh
bh
bh
bh
unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

46.250
4
2
5
5
3
1
1

m1
bh
bh
bh
bh
bh
bh
bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rp.

0.00

Rp.

0.00

9
10

Pasang penyambung daya ke PLN


Instalasi titik lampu

1
8

unit
bh

Rp.
Rp.

0.00 Rp.
0.00 Rp.

0.00
0.00
Rp.

0.00

XIII
1
2
3
4
5

PEKERJAAN PENGECATAN
Cat tembok dalam, ex. Mowillex
Cat tembok luar, ex. Catylac
Pengecatan plafond
Pengecatan list plafond
Pengecatan kusen pintu &jendela

9.000
32.600
0.000
0.000
17.157

m2
m2
m2
m1
m2

Rp.
Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00
0.00
0.00
0.00
0.00
Rp.

XIV
1
2
3
4

PEKERJAAN FINISHING
Pembersihan lahan setelah pekerjaan
Landscaping taman
Pasang ornamen batu alam
Pasang paving block

1.000
1
28.703
21.000

m2
unit
m2
m2

Rp.
Rp.
Rp.
Rp.

0.00 Rp.
0.00 Rp.
0.00 Rp.
0.00 Rp.

0.00

0.00
0.00
0.00
0.00

Rp.
JML TOTAL :
Rp.
Dibulatkan:
Rp.
Terbilang :Satu Milyar Lima Ratus Empat Puluh Tiga Juta Rupiah

Yogyakarta,

Mei 2013

Perencana

0.00
Err:509
Err:509

RENCANA ANGGARAN BIAYA (RAB )

NO.
I
1
2
3
4
5
6
7
8

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pembersihan Lahan
Pengukuran dan pemasangan bowplank
Pembuatan Direksi Keet
Pengadaan Air kerja
Pembuatan pagar sementara
Pengadaan skafolding
Dokumentasi
Papan IMB

VOL

SAT
m
m2
m2
ls
m1
ls
ls
ls
2

HARGA SAT.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JML HARGA

JML TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

II
1
2
3
4
5
6

III
1
2
3

IV
1
2
3
4
5
6
7
8

PEKERJAAN TANAH
Galian pondasi t=90 cm
Galian Pondasin rollag t=80 cm
Urugan pasir bawah pondasi t=10cm
Urugan pasir bawah rollag t=10cm
Urugan pasir bawah lantai t=10cm
Urugan tanah kembali

PEKERJAAN PONDASI
Pas Pondasi Batu kali 1pc:5pp
Pas Pondasi Batu kali rollag
Pas. Rollag batu bata 1pc:3pp

PEKERJAAN BETON
Kolom 15/30
Kolom 15/15
Kolom 15/15 gunungan
Sloof 15/20
Ring Balk 15/15
Pelat dak beton, t=11 cm
Lantai kerja bawah keramik t=5 cm
Kantilever, t=10 cm

m3
m3
m3
m3
m3
m3

m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

NO.

0.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00

Rp.

0.00

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00

URAIAN PEKERJAAN

VOL

SAT

HARGA S

V
1
2
3
4
5

PEKERJAAN DINDING & PLESTERAN


Pas. Batu bata 1pc:5pp
Pas. Batu bata 1pc:3pp
Plesteran dinding 1pc:5pp
Plesteran dinding 1pc:3pp
Acian

m2
m2
m2
m2
m2

Rp.
Rp.
Rp.
Rp.
Rp.

VI
1
2
3
4

PEKERJAAN LANTAI & DINDING


Pasang Keramik polos 30 x 30, ex. Asia Tile
Pasang Keramik lantai 20 x 20 (KM/WC)
Pasang Keramik dinding 20 x 25 (KM/WC)
Pasang List Keramik 10 x 20 (KM/WC)

m2
m2
m2
m2

Rp.
Rp.
Rp.
Rp.

VII PEKERJAAN KUSEN PINTU + JENDELA


1 Kusen P1 , 4bh
Daun pintu P1
2 P2 pintu PVC set kamar mandi
3 Kusen J1 , 2bh
Daun jendela J1
4 Kusen J2 , 4bh
Daun jendela J2
5 Kusen J3 , 2bh
6 Kusen J4 , 1bh
Daun jendela J4
7 Kusen J5 , 1bh
Daun jendela J4

m3
m2
unit
m3
m2
m3
m2
m3
m3
m2
m3
m2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VIII
1
2
3
4
5

m3
m3
m2
m1
m2

Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN ATAP
Konstruksi kuda-kuda rangka kayu kamfer
Pasang gording 8/12 kayu kamfer
Pasang usuk 5/7 dan reng 2/3 kayu jati
Pasang Lisplank 3/30 kayu kamfer
Pasang atap genteng kodok/ glasur

IX
1
2
3

PEKERJAAN LANGIT-LANGIT
Pasang rangka plafond kayu jati (60x120)
Pasang plafond gypsumboard t=9mm,
List plafond gypsum lebar 5-10 cm

m3
m2
m1

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

X
1
2
3
4
5
6
7
8

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Pasang kunci tanam pintu 2 slag
Pasang handle pintu
Engsel pintu standar 4"
Engsel jendela standar 3"
Engsel bebas J5
Pasang grendel jendela
Pasang kaca t=5mm
Pasang angkur pintu & jendela

bh
bh
bh
bh
bh
bh
m2
bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN SANITASI AIR


Instalasi Air Bersih
1 Pasang pipa PVC 3/4"
2 Pasang pipa galvanis 1"
3 Pasang keni 1"
4 Pasang Tee 1" ke 3/4"
5 Pasang penyambung air bersih dari PAM
Instalasi Air Kotor
1 Pasang pipa PVC 3"
2 Pasang keni 1"
3 Pasang Tee 2" ke 3"
4 Pasang Septictank & Peresapan
5 Pasang bak kontrol
6 Pasang Closet jongkok, ex.INA
7 Floor drain KM/WC
8 Wastafel
9 Kran air
9 Tandon air
10 Pasang bak mandi fiberglass v=1m3

0.00

0.00

XI

m1
m1
bh
bh
bh

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

m1
bh
bh
unit
bh
bh
bh
bh
bh
bh
unit

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00

XII
1
2
3
4
5
6
7
8
9
10

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi lampu kabel NYM3 x 2,5mm
Pasang saklar tunggal
Pasang saklar ganda
Pasang Stop kontak
Lampu SL 18 W
Lampu SL 10 W
Pasang panel listrik
Pasang Box sekering
Pasang penyambung daya ke PLN
Instalasi titik lampu

m1
bh
bh
bh
bh
bh
bh
bh
unit
bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

XIII
1
2
3
4
5

PEKERJAAN PENGECATAN
Cat tembok dalam, ex. Mowillex
Cat tembok luar, ex. Catylac
Pengecatan plafond
Pengecatan list plafond
Pengecatan kusen pintu &jendela

m2
m2
m2
m1
m2

Rp.
Rp.
Rp.
Rp.
Rp.

XIV
1
2
3
4

PEKERJAAN FINISHING
Pembersihan lahan setelah pekerjaan
Landscaping taman
Pasang ornamen batu alam
Pasang paving block

m2
unit
m2
m2

Rp.
Rp.
Rp.
Rp.

NCANA ANGGARAN BIAYA (RAB )

HARGA SAT.

JML HARGA

JML TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00

Rp.

0.00

Rp.

0.00

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

0.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00

Rp.

0.00

JML TOTAL :

Rp.
Rp.

0.00
0.00

Yogyakarta,

Mei 2013

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Perencana

JADWAL PELAKSANAAN ( TIME SC


Err:509

No.

JENIS PEKERJAAN

VOL

SAT

DURASI

BOBOT

(%)

Bulan 1
1.000

0.002
3.214

0.002

0.002

0.003

0.003

0.003

0.064
0.089

0.064
0.089

0.064
0.089

A
I
1
2
3
4
5
6
7
8

Err:509
PEKERJAAN PERSIAPAN
Pembersihan Lahan
Pembuatan Kantor Sementara dan Gudang
Pengadaan Air Kerja
Pembuatan Pagar Sementara
Pengadaan Skafolding
Pemasangan Bouwplank
Dokumentasi
Pembuatan Papan Nama

500.00
16.00
1.00
90.00
1.00
136.00
1.00
1.00

m2
m2
ls
m'
ls
m'
ls
ls

1
1
20
1
1
1
20
2

0.216
0.796
0.038
3.214
0.042
1.044
0.056
0.056

II
1
2

PEKERJAAN TANAH
Galian Footplat
Galian Pondasi

100.80
173.80

m3
m3

4
4

0.254
0.358

Galian Rolag

0.48

m3

0.001

Urugan pasir bawah pondasi

15.80

0.113

Urugan tanah kembali

91.53

0.140

Urugan pasir bawah lantai

24.70

0.051

Urugan pasir bawah footplat

1.21

0.009

Urugan pasir bawah rollag

0.32

m3

0.204

Urugan tanah rollag

0.67

m3

0.005

III

PEKERJAAN PONDASI

Pemasangan Aanstamping

31.600

m3

0.581

0.291

0.291

Pas Pondasi Batu kali

69.520

2.643

0.881

0.881

3
4
5

Pas. Rolag batu bata


Pas. Bata camp 1 : 5
Pas. Bata camp 1 : 3

0.720
496.531
43.176

m
m2
m2

1
3
3

0.004
2.481
0.230

0.216
0.002

0.796
0.002

0.003
0.028

0.042
1.044
0.003
0.028

0.064
0.089

0.001
0.113

0.009
0.204

Plesteran camp 1 : 5

993.062

m2

2.180

Plesteran camp 1 : 3

86.352

0.206

Acian

1,079.414

1.324

IV

PEKERJAAN BETON

Foot plat 120/120

12.10

m3

2.463

0.616

0.616

Lantai kerja footplat t=10 cm

4.03

m3

0.154

0.077

0.077

Sloof 15/20

1.59

m3

0.399

Sloof 20/25

5.25

1.318

Kolom Pedestel 30/30

5.32

2.516

Kolom30/30

10.08

4.769

Kolom 15/15

2.52

1.192

Balok 20/30

8.04

2.945

Balok 15/20

1.50

0.510

10

Pelat beton lantai 2, t=11 cm

21.89

7.342

11

Pelat dak beton, t=10 cm

5.95

1.996

12

Kantilever, t=10 cm

0.30

0.101

13

Tangga Beton

4.77

1.623

PEKERJAAN DINDING & PLESTERAN

Kusen P1 , 4bh

0.21

m3

0.102

Kusen dan daun pintu P2, 1bh

2.04

3
4

Kusen dan daun pintu P3, 4bh


Kusen P4 PVC, 5bh

0.999

8.04
5.00

m
unit

3
2

3.934
0.094

Kusen J1

0.11

m3

0.055

Kusen J2

0.11

0.055

Kusen dan daun pintu J3, 2 bh

0.42

0.204

Kusen BV

0.09

0.044

VI
1
2
3
4

PEKERJAAN LANTAI & DINDING


Gypsum Board rangka hollow
List Plafond
Pengecatan tembok
Pengecatan plafond

238.00
232.55
1,079.41
238.00

m2
m'
m2
m2

3
2
3
2

0.436
0.158
0.823
0.182

VII
1
2
3
4

PEKERJAAN KUSEN PINTU + JENDELA


Kunci tanam biasa
Kunci tanam pintu WC
Engsel pintu
Kaca P1, 4bh

9.00
5.00
30.00
20.00

bh
bh
bh
m2

1
1
1
1

0.101
0.026
0.031
0.115

Kaca J1

1.75

m2

0.010

Kaca J2

14.10

0.082

Kaca J3

1.42

0.008

Kaca BV

0.63

0.004

14.00
29.00
5.00
7.00
13.00
1.00
43.00

bh
bh
bh
bh
bh
unit
bh

1
1
1
1
1
1
3

0.028
0.034
0.008
0.011
0.020
0.023
0.050

VIII
1
2
3
4
5
6
7

PEKERJAAN ATAP
Lampu TL 2x18 W
Lampu SL 15 W
Saklar tunggal
Saklar ganda
Stop kontak
Box panel
Instalasi titik lampu

IX

PEKERJAAN LANGIT-LANGIT

Pasang Keramik granito 60 x 60

101.00

m2

2.616

Pasang Keramik granito 40 x 40

26.00

m2

0.505

Pasang Keramik lantai 30 x 30

52.00

m2

0.427

Pasang Keramik lantai 30 x 30 (Tangga)

14.04

m2

0.115

Pasang Keramik lantai 20 x 20 (KM/WC dan teras)

36.00

0.301

X
1
2
3
4
5
6
7
8
9
10

PEKERJAAN KUNCI, KACA & PENGGANTUNG


Closet jongkok
Wastafel
Septictank & peresapan
Kran air
Pipa PVC 1/2"
Pipa Galvanis 3/4"
Bak kontrol
Ground tank
Tandon air
Floor drain

5.00
5.00
2.00
9.00
24.70
87.50
1.00
1.00
1.00
5.00

bh
bh
unit
bh
m'
m'
bh
bh
bh
bh

2
1
4
1
2
3
1
4
1
1

0.106
0.368
0.332
0.014
0.023
0.137
0.008
0.075
0.019
0.017

B
Err:509
Err:509 Err:509
1

Pas. Bata camp 1 : 5

462.16

m2

2.309

Pas. Bata camp 1 : 3

40.44

0.216

Plesteran camp 1 : 5

924.31

2.029

Plesteran camp 1 : 3

80.88

0.192

Acian

1,005.19

1.233

Err:509 Err:509
1

Kolom 30/30

9.72

m3

4.599

Kolom 15/15

2.16

1.022

Ring balok 15/20

4.02

1.902

Kantilever, t=10 cm

10.20

3.421

Err:509 Err:509
1

Kusen P1 , 2bh

0.10

m3

0.051

2
3

Kusen dan daun pintu P2, 4bh


Kusen P4 PVC, 5bh

m
unit

2
1

3.934
0.075

Kusen dan daun jendela J3, 9bh

8.04
4.00
1.75

m3

0.853

Kusen J5

0.11

0.056

Kusen J6

0.08

0.041

Kusen J7, 2bh

0.12

0.061

Kusen BV

0.07

0.035

m2
m'

3
2

0.337
0.073

m2

0.767

0.140

4
2
2

3.501
0.070
0.000

Err:509 Err:509
1
2

Gypsum Board rangka hollow


List Plafond

Pengecatan tembok

184.00
107.55
1,005.19

Pengecatan plafond

184.00

356.99
0.12
0.05

m2
m'
m'

Err:509 Err:509
1
2
3

Rangka Atap LT 1 & 2


Nok
Papan Ruiter

Papan Listplank

Atap Genteng

Err:509
1
2
3

Err:509
Kunci tanam biasa
Kunci tanam pintu WC
Engsel pintu

0.66

m'

0.005

356.99

1.588

7.00
12.00
33.00

bh
bh
bh

1
1
1

0.079
0.062
0.034

Kaca J3

6.39

m2

0.037

Kaca J5

2.40

0.014

Kaca J6

7.74

0.045

Kaca J7

3.24

0.019

8
Err:509
1
2
3
4
5
6

Kaca BV
Err:509
Lampu TL 2x18 W
Lampu SL 15 W
Saklar tunggal
Saklar ganda
Stop kontak
Instalasi titik lampu

3.36

m2

0.019

17.00
15.00
6.00
5.00
6.00
32.00

bh
bh
bh
bh
bh
bh

1
1
1
1
1
1

0.035
0.017
0.009
0.008
0.009
0.037

119.00

m2

1.100

Err:509 Err:509
1

Pasang Keramik granito 40 x 40

Pasang Keramik lantai 30 x30

38.00

0.351

Pasang Keramik lantai 20 x 20 (KM/WC)

29.00

0.242

Err:509
1
2
3
4
5
6

Err:509
Closet jongkok
Wastafel
Kran air
Pipa PVC 1/2"
Pipa PVC 3/4"
Floor Drain

4.00
2.00
10.00
6.40
9.00
4.00

bh
bh
bh
m'
m'
bh

1
1
1
2
2
1

0.085
0.147
0.016
0.006
0.014
0.003

Err:509
1
2
3
4
5
6

Err:509
Kuda-kuda Baja
1/2 Kuda-kuda
Jurai
Gording CNP 125.50.20.3,2 mm
Baut 10mm
Baut 12mm

4
4
2
2
3
3

0.734
0.367
0.174
0.979
0.012
0.033

626.22 Kg
313.10 Kg
148.60 Kg
835.21 Kg
160.00 buah
288.00 buah

C
Err:509
Err:509 Err:509
1

Galian Pondasi Pagar

Urugan Pasir bawah pondasi

Urugan tanah kembali

Err:509 Err:509

62.70

m3

0.129

5.70

0.041

20.90

0.149

0.065

0.065
0.041

Pemasangan Aanstamping

11.40

m3

0.210

Pas Pondasi Batu kali

25.08

0.954

Pas. Bata camp 1 : 5

8.55

0.043

Err:509 Err:509
1

kolom 15/15

0.34

m3

0.085

sloof 15/20

1.71

m3

0.809

257.10

m2

0.297

9.00

bh

2.370

2.00
9.00
9.00

can
bh
bh

3
3
3

0.301
0.068
0.135

8.00
16.00

m2
m'

1
1

0.003
0.123

17.60

m3

0.036

0.036
0.011

Err:509 Err:509
1

Pasang paving block

X
1

Err:509
Pengadaan dan Pemasangan Unit AC Sentral
- Type : Air cooled split duct
Kapasitas pendingin : 100.000,00 btu / h
Karakteristik : 380 V, 1 Ph, 50 Hz
- Refrigerant : R - 22
- Dudukan out door
- Ongkos Pasang

D
Err:509
1
2

POS SATPAM
Err:509
Pembersihan Lahan
Pemasangan Bouwplank

Err:509 Err:509
1
Galian Pondasi

0.003
0.123

Urugan pasir bawah pondasi

1.60

0.011

Urugan tanah kembali


Urugan pasir bawah lantai

5.87

0.042

0.80

0.006

3.20

m3

0.059

0.059

7.04
64.00

m
m2

2
1

0.268
0.320

0.134

0.042

Err:509 Err:509
1

Pemasangan Aanstamping

2
3

Pas Pondasi Batu kali


Pas. Bata camp 1 : 5

0.134

Pas. Bata camp 1 : 3

5.60

m2

0.030

Plesteran camp 1 : 5

128.00

0.281

Plesteran camp 1 : 3

11.20

0.027

Acian

139.20

0.171

Err:509 Err:509
1

Sloof 15/20

0.48

m3

0.120

0.060

0.060

Kolom 15/15

0.72

m3

0.341

0.170

0.170

Ring balk15/20

0.96

m3

0.352

Pelat dak beton, t=10 cm

1.25

m3

0.419

0.140

0.140

0.176

Err:509 Err:509
1

Kusen P2, 2bh

4.04

m3

1.977

0.989

0.989

Kusen J4

0.11

0.053

0.026

0.026

8.00
48.00
139.20

m2
m'
m2
m2

1
1
1
1

0.015
0.033
0.106
0.006

3.83
9.65

4.07
13.72

Err:509
1
2
3
4

Err:509
Gypsum Board rangka hollow
List Plafond
Pengecatan tembok
Pengecatan plafond

Err:509
1
2
3

Err:509
Kunci tanam biasa
Engsel pintu
Kaca J4

2.00
6.00
6.00

bh
bh
m2

1
1
1

0.023
0.006
0.035

Err:509
1
2
3
4

Err:509
Lampu SL 15 W
Saklar tunggal
Stop kontak
Instalasi titik lampu

2.00
2.00
2.00
2.00

bh
bh
bh
bh

1
1
1
1

0.002
0.003
0.003
0.002

8.00

m2

0.066

Err:509 Err:509
1

Pasang Keramik lantai 30 x 30

Rencana Kemajuan Pekerjaan PerMinggu (%)


Komulatif Rencana Kemajuan Pekerjaan (%)

100.00

0.249
0.249

2.08
2.33

3.50
5.82

N ( TIME SCHEDULLE )
09
Bulan 2
6

Bulan 3
7

10

11

12

13

BULAN 4
14
15

16

17

BULAN 5
18
19

20

100.000

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.140
0.051

0.005

0.881
0.004
0.827
0.077

0.827
0.077

0.827
0.077

90.000

1.090

1.090

0.103

0.103
0.662

0.616

0.616

0.200

0.200

0.439

0.439

0.439

0.839

0.839

0.839

1.590

1.590

1.590

0.596

0.596
0.982
2.447

0.662

0.982

0.982

0.255

0.255

2.447

2.447

0.665

0.665

0.665

0.050

0.050
0.541

0.034

0.034

0.541

0.541

0.034
0.999
1.311

1.311
0.047

1.311
0.047

0.055
0.028

0.028

0.102

0.102

0.022

0.022

80.000

0.145

0.145
0.079

0.145
0.079
0.274
0.091

0.274
0.091

0.274

0.101
0.026
0.031
0.115
0.010
0.082
0.008
0.004

0.017

0.017

0.028
0.034
0.008
0.011
0.020
0.023
0.017

70.000

0.872

0.872

0.872

0.168

0.168

0.168

0.213

0.213
0.115
0.301

0.053

0.053

0.083
0.014
0.011
0.046

0.083

0.083

0.083

0.019

0.019

0.019

0.019

0.368

0.046
0.008

0.011
0.046

0.019
0.017

0.770

0.770

0.770

0.072

0.072

0.072

1.533

1.533

0.511

0.511

0.634

0.634

0.634

1.711

1.711

1.014

1.014

0.096

0.096

60.000

0.617

0.617

0.025

0.025

1.533

1.967
0.075

1.967

0.427

0.112

0.112
0.037

0.112
0.037

0.256

0.256

0.256

0.047

0.047

0.875

0.875
0.035

0.427
0.028

0.028

0.020

0.020

0.030

0.030

0.017

0.017

0.047
50.000

0.875

0.875

0.035
0.0002

0.0002

0.005
0.397

0.079
0.062
0.034
0.018

0.018

0.007

0.007

0.022

0.022

0.009

0.009

0.397

0.397

0.397

0.010

0.010

0.035
0.017
0.009
0.008
0.009
0.037
40.000
0.367

0.367

0.367

0.176

0.176
0.121

0.085
0.147
0.016
0.003
0.007
0.003

0.121

0.003
0.007

0.184
0.092
0.087
0.490
0.004
0.011

0.184
0.092
0.087
0.490
0.004
0.011

0.184
0.092

0.184
0.092

0.004
0.011
30.000

0.149

0.105

0.105

0.318

0.318

0.318

0.021

0.021

0.405

0.405

0.042

0.042

0.099

0.790

0.790

0.790

0.100
0.023
0.045

0.100
0.023
0.045

0.100
0.023
0.045

0.099

0.099

20.000

0.006

0.320

0.030
0.281
0.027
0.171

0.176
0.140

10.000

0.015
0.033
0.106
0.006

0.023
0.006
0.035

0.002
0.003
0.003
0.002

0.066
0.000
4.50
18.22

6.47
24.69

7.80
32.49

8.09
40.57

8.14
48.72

10.47
59.19

9.70
68.89

9.23
78.12

7.89
86.01

5.50
91.51

3.64
95.15

1.88
97.03

1.33
98.37

0.96
99.33

Semarang, 06 Februa
Perencana

0.67
100.00

MONASHE
NIS. 08 09 760

HARGA SATUAN PEKERJAAN


No
Anal.

Uraian Pekerjaan

Sat.

Harga Satuan (Rp.)

I
I.1
I.2
I.3
I.4
I.5

Analisa biaya konstruksi pekerjaan persiapan (SNI 2012)


1 m' Pagar sementara dari seng gelombang tinggi 2 meter
1 m' Pengukuran dan pemasangan bouwplank
1 m2 Pembuatan kantor sementara dengan lantai plesteran
1 m2 Pembuatan gudang semen dan alat-alat
1 m2 Membersihkan lapangan dan peralatan

m'
m'
m2
m2
m2

II
II.1
II.2
II.3

Analisa biaya konstruksi pekerjaan tanah (SNI 2012)


1 m3 Galian tanah biasa sedalam 1 meter
Mengurug kembali 1 m3 galian
1 m3 Urugan pasir

m3
29,750.00
1/3 x indeks pekerjaan galian
m3
119,900.00

III
III.1

Analisa biaya konstruksi pekerjaan pondasi (SNI 2012)


1 m3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps.

m3

461,305.00

IV
IV.1
IV.2

Analisa biaya konstruksi pekerjaan dinding (SNI 2012)


1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 ps
1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 5 ps

m2
m2

71,084.38
66,115.00

V
V.1
V.2
V.3

Analisa biaya konstruksi pekerjaan plesteran (SNI 2012)


1 m2 Plesteran 1 pc : 3 ps, tebal 15 mm
1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm
1 m2 Memasang Acian

m2
m2
m2

32,499.00
29,781.00
17,529.38

VI
VI.1
VI.2
VI.3
VI.4
VI.5
VI.6
VI.7

Analisa biaya konstruksi pekerjaan kayu (SNI 2012)


1 m3 Kosen Pintu & Jendela kayu klas II
1 m2 Pasang daun pintu panel kayu klas I atau II
1 m3 Pasang Konstruksi kuda-kuda kayu Konvensional kayu I ; II ; III
1 m3 Pasang Konstruksi Gording, kayu klas II
1 m2 Memasang rangka atap genteng kodok/glasur ,kayu klas II
1 m2 Pasang rangka langit-langit (60 x 1.020) cm, kayu klas I (jati)
1 m' Pasang listplank ukuran (3 x 20) cm, kayu klas I atau II

m3
m2
m3
m3
m2
m2
m'

9,318,600.00
500,500.00
8,477,600.00
8,114,240.00
130,540.00
270,364.00
96,090.00

VII
VII.1
VII.2
VII.3
VII.4
VII.5

Analisa biaya konstruksi pekerjaan beton (SNI 2012)


1 m3 membuat sloof beton bertulang (200 kg besi+bekisting)
1 m3 membuat kolom beton bertulang (300 kg besi+bekisting)
1 m3 membuat balok beton bertulang (200 kg besi+bekisting)
1 m3 membuat dinding beton bertulang (150 kg besi+bekisting)
1 m3 membuat beton cor 1 : 2 : 3

m3
m3
m3
m3
m3

2,952,411.00
5,710,371.00
2,889,931.00
4,199,134.00
526,634.00

128,560.00
106,960.00
747,887.50
664,418.75
6,300.00

VIII
Analisa biaya konstruksi pekerjaan penutup atap (SNI 2012)
VIII.1 1 m2 pasang atap genteng kodok / glasur

m2

72,806.00

IX
IX.1
IX.2

Analisa biaya konstruksi pekerjaan Langit-langit (SNI 2012)


1 m2 Langit-langit gypsum board, tebal 9 mm
1 m' list langit-langit profil cornees gypsum lebar 5-10 cm

m2
m'

26,395.00
19,303.00

X
X.1
X.2
X.3
X.4
X.5
X.6
X.7
X.8
X.9
X.10

Analisa biaya konstruksi pekerjaan sanitasi (SNI 2012)


memasang 1 buah kloset jongkok
memasang 1 buah wastafel
memasang 1 m' pipa PVC tipe AW diameter 3/4"
memasang 1 m' pipa PVC tipe AW diameter 3"
memasang 1 buah kran air diameter 3/4" atau 1/2"
Pekerjaan Septictank per Unit
memasang 1 m' pipa galvanis, diameter 1"
memasang 1 buah floor drain
memasang bak fiberglass volume 1m3 air
Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm

bh
bh
m'
m'
bh
unit
m'
bh
bh
bh

319,825.00
984,825.00
13,518.75
38,845.83
13,630.00
2,203,385.10
41,998.00
28,700.00
1,359,300.00
305,385.50

XI
XI.1
XI.2
XI.3
XI.4
XI.5
XI.6
XI.7
XI.8
XI.9

Analisa biaya konstruksi pekerjaan besi dan aluminium (SNI 2012)


1 m1 pasang kabel NYM 2x 2,5 mm
1 unit pasang Box KWH dan Meter
1 unit pasang Box panel dan panel kontrol
1 titik pekerjaan fitting
1 bh pasang saklar tunggal
1 bh pasang saklar ganda
1 bh pasang stop kontak
1 bh pasang lampu SL 18 w
1 bh pasang lampu SL 10 W

m1
unit
unit
ttk
bh
bh
bh
bh
bh

690.00
76,000.00
76,000.00
10,000.00
33,800.00
44,800.00
28,800.00
57,800.00
34,800.00

XII
XII.1
XII.2
XII.3
XII.4
XII.5

Analisa biaya konstruksi pekerjaan kunci dan kaca (SNI 2012)


1 bh pasang kunci tanam biasa
1 bh pasang kunci tanam kamar mandi
1 bh pasang engsel pintu
1 m2 pasang kaca, tebal 5 mm
1 bh pasang grendel

bh
bh
bh
m2
bh

71,200.00
70,600.00
11,550.00
80,462.50
19,450.00

XIII
XIII.1
XIII.2
XIII.3
XIII.4
XIII.5

Analisa biaya konstruksi pekerjaan penutup lantai dan dinding (SNI 2012)
1 m2 pasang lantai keramik 20 x 20 cm
1 m2 pasang lantai keramik 30 x 30 cm
1 m2 Pasang Paving Block t = 8cm K-300
1 m2 pasang dinding keramik 20 x 25 cm
1 m2 pasang dinding keramik 10 x 20 cm

m2
m2
m2
m2
m2

114,655.00
112,492.69
84,275.00
129,099.00
37,147.00

XIV
XIV.1
XIV.2
XIV.3

Analisa biaya konstruksi pekerjaan pengecatan (SNI 2012)


1 m2 pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar 2 lapis cat penutup m2
1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) luar m2
1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) dal m2

20,111.00
30,094.10
54,794.10

HARGA SATUAN BAHAN BANGUNAN


No.
A

C.

Nama Bahan

BAHAN DASAR
1 Batu Belah
2 Kerikil Beton 1/2
3 Batu bata (5x11x22cm)
4 Pasir Urug
5 Pasir Pasang
6 Pasir Beton
7 Tanah Padas
8 Kapur Pasang
9 Portland semen Holcim 40 kg
10 Portland semen Holcim 50 kg
11 Semen Putih 40 kg
12 Semen warna

Sat.

m
m3
bh
m3
m3
m3
m3
m3
kg
kg
kg
kg
3

Harga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

110,000.00
180,000.00
450.00
90,000.00
120,000.00
195,000.00
50,000.00
210,000.00
1,187.50
1,160.00
1,700.00
10,000.00

BAHAN PENUTUP ATAP


1 Sirap
2 Genteng Kodok / Glasur
3 Genteng beton warna standard
4 Kerpus beton warna standard
5 Genteng plentong super besar
6 Nok kerpus plentong super
7 Nok kerpus Kodok
8 Asbes gelombang kecil (240cmx105cmx4mm)
9 Asbes plat (100cmx100cmx3mm)
10 Asbes plat (100cmx100cmx4mm)
11 Seng plat BJLS. 0.28, lebar 55 cm
12 Seng plat BJLS. 0.30, lebar 55 cm
13 Seng Gelombang BJLS. 0.30 pj. 180 cm

lbr
bh
bh
bh
bh
bh
bh
m2
m2
m2
m'
m'
lbr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,500.00
2,500.00
3,000.00
3,750.00
2,800.00
6,750.00
4,200.00
50,000.00
13,500.00
14,500.00
33,000.00
38,000.00
65,000.00

BAHAN KAYU
1 Kayu Kamper (Papan)
2 Kayu Kamper (Balok)
3 Kayu Kruing (Papan)
4 Kayu Kruing (Balok)
5 Kayu Bengkirai (Papan)
6 Kayu Bengkirai (Balok)
7 Kayu Dolken 8x10x400cm
8 Kayu Jati (Papan)
9 Kayu Jati (Balok)
10 Kayu Meranti (Papan)
11 Kayu cetakan

m3
m3
m3
m3
m3
m3
bt
m3
m3
m3
m3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,300,000.00
6,700,000.00
5,300,000.00
5,000,000.00
9,000,000.00
8,700,000.00
18,000.00
21,000,000.00
19,000,000.00
4,700,000.00
1,050,000.00

No.

Nama Bahan

12 Kayu Lanan (Papan)


13 Kayu Lanan (Balok)
BAHAN PENUTUP DINDING / LANTAI
1 Keramik uk. 30 x 30 cm
2 Keramik uk. 20 x 20 cm
3 Keramik uk. 33 x 33 cm
4 Batu tempel hitam
5 Granito uk. 60 x 60 cm
6 Porselen 11 x 11 cm
7 Keramik plint uk. 10 x 20 cm
8 Keramik plint uk. 10 x 10 cm

Sat.

Harga

m3
m3

Rp
Rp

1,950,000.00
1,700,000.00

m2
m2
m2
m2
m2
m2
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,500.00
35,000.00
30,000.00
70,000.00
280,000.00
277.78
5,000.00
4,500.00

BAHAN CETAK
1 Buis beton 20cm - 100cm
2 Buis beton 30cm - 100cm
3 Buis Beton U 20cm - 100cm
4 Buis Beton U 30cm - 100cm
5 Roster/lubang angin uk. 20 x 20 cm
6 Roster/lubang angin uk. 25 x 25 cm
7 Roster/lubang angin uk. 30 x 30 cm

bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
38,000.00
30,000.00
35,000.00
5,500.00
6,250.00
6,300.00

BAHAN BESI
1 Besi beton polos
2 Besi beton ulir
3 Besi siku L 40x40x4
4 Besi siku L 50x50x5
5 Besi siku L 60x60x6
6 Kawat Ikat Beton / Bendrat
7 Kawat kasa
8 Saringan Pasir
9 Besi Strip

kg
kg
btg
btg
btg
kg
m2
m2
kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
12,300.00
130,000.00
205,000.00
299,000.00
12,000.00
12,000.00
15,000.00
13,000.00

BAHAN PIPA
1 Pipa PVC DN 20 (") AW JIS
2 Pipa PVC DN 25 (") AW JIS
3 Pipa PVC DN 32 (1") AW JIS
4 Pipa PVC DN 63 (2") AW JIS
5 Pipa PVC DN 90 (3") AW JIS
6 Pipa PVC DN 110 (4") AW JIS
7 Pipa Medium B Galvanis DN 25 (3/4")
7 Pipa Medium B Galvanis DN 25 (1")

m'
m'
m'
m'
m'
m'
m'
m'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
5,625.00
6,875.00
10,000.00
20,416.67
25,000.00
19,500.00
21,666.67

BAHAN LANGIT - LANGIT


1 Gypsum tebal 9 mm
2 Teakwood uk. 90cmx210cmx3mm
3 Teakwood uk. 120cmx240cmx3mm
4 Tripleks uk. 120cmx240cmx4mm
5 Multipleks uk. 120cmx240cmx9mm
6 Multipleks uk. 120cmx240cmx12mm

N
lbr
lbr
lbr
lbr
lbr
lbr

Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
40,000.00
75,000.00
55,000.00
105,000.00
135,000.00

BAHAN FINISHING
1 KAYU
1 Menie
2 Dempul Plamir
3 Ambril/amplas

kg
kg
kg

Rp
Rp
Rp

12,500.00
11,000.00
3,500.00

4 Cat dasar

kg

Rp

132,000.00

5 Yunior 66 (nippon paint)


6 Deculux
TEMBOK
1 Plamir
2 Catylac
3 Mowillex
BESI
1 Menie

kg
kg

Rp
Rp

42,000.00
45,000.00

kg
kg
kg

Rp
Rp
Rp

10,500.00
90,000.00
185,000.00

kg

Rp

13,500.00

m2
m2

Rp
Rp

65,000.00
55,000.00

BAHAN KACA
1 Kaca polos 5 mm
2 Kaca polos 3 mm

ALAT PENGUNCI DAN PENGGANTUNG


1 Kunci tanam union ( 2 x slag )
2 Kunci tanam kuda ( 2 x slag )
3 Kunci tanam yale ( 2 x slag )
4 Engsel kupu-kupu biasa
5 Nylon kupu-kupu
6 Espagnoled
7 Grendel tanam luar negeri
8 Grendel biasa
9 Kait angin

Q
bh
bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000.00
60,000.00
125,000.00
2,250.00
5,000.00
30,000.00
7,500.00
7,500.00
5,000.00

BAHAN SANITAIR
1 Kloset jongkok
2 Wastavel meja oval
3 Wastavel gantung sudut kecil
4 Tempat sabun gantung
5 Tempat sabun tanam
6 Kran Air
7 Seal tape
8 Floor drain

bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

105,000.00
700,000.00
210,000.00
27,500.00
20,000.00
7,500.00
2,000.00
22,500.00

ALAT PENGIKAT KAYU


1 Paku uk. 1" s/d 4"
2 Tali ijuk
3 Mur baut ( kuda-kuda )
4 Lem kayu

kg
kg
kg
kg

Rp
Rp
Rp
Rp

12,000.00
6,000.00
13,000.00
18,000.00

POMPA AIR
1 Sanyo 100 watt
2 Fuji 250 watt

bh
bh

Rp
Rp

975,000.00
1,450,000.00

PAVING BLOCK
1 Trapez Grass Block abu-abu
2 Kansteen

m2
m'

Rp
Rp

41,000.00
22,500.00

LAIN-LAIN
1 Air
2 Minyak Bekisting & beton
3 Alumunium Foil
4 Paku Sekrup

liter
ltr
m2
doss

Rp
Rp
Rp
Rp

8,000.00
8,000.00
6,500.00
13,500.00

5 Bak cuci stainless steel

bh

Rp

145,000.00

6 Perekat/Lem
7 Kayu Profil
8 Besi profil
9 Sealant
10 Sekrup
11 Profil kaca
12 Kawat las
13 Alumunium Strip
14 List profil cornees gypsum
15 Tepung gypsum
16 Alkasit
17 Bak fiberglass vol 1m3 air

kg
m1
kg
tube
bh
bh
kg
m1
m1
kg
kg
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,000.00
4,200.00
14,250.00
50,000.00
750.00
9,000.00
52,000.00
30,000.00
8,000.00
3,500.00
40,000.00
825,000.00

LISTRIK
1 Kabel Overspaneng NYM 3 x 2,5 mm
2 MCB : 6 A / 5 KA / 1 pole
3 MCB : 16 A / 10 KA / 3 pole
4 Pilot lamp. Fuse
5 Voltmeter Box panel uk. 100 x 100 x 40
6 Arde / Pentanahan
7 NFB 3 phase 63 A
8 NFB 3 phase 20 A
9 .Amperemeter
10 Lampu TL 2 x 18. watt Rm.300 Kisi-kisi
11 Lampu SL 15 watt
12 Stop kontak Arde Outbow putih
13 Sakelar tunggal
14 Sakelar ganda / seri
15 Fiting
16 Lampu Pintu Gerbang ( taman )

m1
bh
bh
bh
bh
ls
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,400.00
1,750,000.00
150,000.00
241,500.00
241,500.00
90,000.00
90,000.00
240,000.00
57,000.00
27,000.00
15,500.00
12,500.00
15,000.00
20,500.00
7,500.00
2,750,000.00

HARGA SATUAN BAHAN BANGUNAN


Err:509
Err:509

No.
A

C.

Nama Bahan

Sat.

Harga

BAHAN DASAR
1 Batu Belah
2 Kerikil Beton 1/2
3 Batu bata (5x11x22cm)
4 Pasir Urug
5 Pasir Pasang
6 Pasir Beton
7 Tanah Padas
8 Kapur Pasang
9 Portland semen Holcim 40 kg
10 Portland semen Holcim 50 kg
11 Semen Putih 40 kg
12 Semen warna

m3
m3
bh
m3
m3
m3
m3
m3
kg
kg
kg
kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

110,000.00
180,000.00
450.00
90,000.00
120,000.00
195,000.00
50,000.00
210,000.00
1,187.50
1,160.00
1,700.00
10,000.00

BAHAN PENUTUP ATAP


1 Sirap
2 Genteng Kodok / Glasur
3 Genteng beton warna standard
4 Kerpus beton warna standard
5 Genteng plentong super besar
6 Nok kerpus plentong super
7 Nok kerpus Kodok
8 Asbes gelombang kecil (240cmx105cmx4mm)
9 Asbes plat (100cmx100cmx3mm)
10 Asbes plat (100cmx100cmx4mm)
11 Seng plat BJLS. 0.28, lebar 55 cm
12 Seng plat BJLS. 0.30, lebar 55 cm
13 Seng Gelombang BJLS. 0.30 pj. 180 cm

lbr
bh
bh
bh
bh
bh
bh
m2
m2
m2
m'
m'
lbr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,500.00
2,500.00
3,000.00
3,750.00
2,800.00
6,750.00
4,200.00
50,000.00
13,500.00
14,500.00
20,000.00
23,000.00
65,000.00

BAHAN KAYU
1 Kayu Kamper (Papan)
2 Kayu Kamper (Balok)
3 Kayu Kruing (Papan)
4 Kayu Kruing (Balok)
5 Kayu Bengkirai (Papan)
6 Kayu Bengkirai (Balok)
7 Kayu Dolken 8x10x400cm
8 Kayu Jati (Papan)
9 Kayu Jati (Balok)
10 Kayu Meranti (Papan)
11 Kayu cetakan

m3
m3
m3
m3
m3
m3
bt
m3
m3
m3
m3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,300,000.00
6,700,000.00
5,300,000.00
5,000,000.00
9,000,000.00
8,700,000.00
18,000.00
21,000,000.00
19,000,000.00
4,700,000.00
1,050,000.00

BAHAN PENUTUP DINDING / LANTAI


1 Keramik uk. 30 x 30 cm
2 Keramik uk. 20 x 20 cm
3 Keramik uk. 33 x 33 cm
4 Batu tempel hitam
5 Granito uk. 60 x 60 cm
6 Porselen 11 x 11 cm
7 Keramik plint uk. 10 x 20 cm
8 Keramik plint uk. 10 x 10 cm

m2
m2
m2
m2
m2
m2
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,500.00
35,000.00
30,000.00
70,000.00
280,000.00
277.78
5,000.00
4,500.00

BAHAN CETAK
1 Buis beton 20cm - 100cm
2 Buis beton 30cm - 100cm
3 Buis Beton U 20cm - 100cm
4 Buis Beton U 30cm - 100cm
5 Roster/lubang angin uk. 20 x 20 cm
6 Roster/lubang angin uk. 25 x 25 cm
7 Roster/lubang angin uk. 30 x 30 cm

bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
38,000.00
30,000.00
35,000.00
5,500.00
6,250.00
6,300.00

BAHAN BESI
1 Besi beton polos
2 Besi beton ulir
3 Besi siku L 40x40x4
4 Besi siku L 50x50x5
5 Besi siku L 60x60x6
6 Kawat Ikat Beton / Bendrat
7 Kawat kasa
8 Saringan Pasir
9 Besi Strip

kg
kg
btg
btg
btg
kg
m2
m2
kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
12,300.00
130,000.00
205,000.00
299,000.00
12,000.00
12,000.00
15,000.00
13,000.00

BAHAN PIPA
1 Pipa PVC DN 20 (") AW JIS
2 Pipa PVC DN 25 (") AW JIS
3 Pipa PVC DN 32 (1") AW JIS
4 Pipa PVC DN 63 (2") AW JIS
5 Pipa PVC DN 90 (3") AW JIS
6 Pipa PVC DN 110 (4") AW JIS
7 Pipa Medium B Galvanis DN 25 (3/4")
7 Pipa Medium B Galvanis DN 25 (1")

m'
m'
m'
m'
m'
m'
m'
m'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
5,625.00
6,875.00
10,000.00
20,416.67
25,000.00
19,500.00
21,666.67

BAHAN LANGIT - LANGIT


1 Gypsum tebal 9 mm
2 Teakwood uk. 90cmx210cmx3mm
3 Teakwood uk. 120cmx240cmx3mm
4 Tripleks uk. 120cmx240cmx4mm
5 Multipleks uk. 120cmx240cmx9mm
6 Multipleks uk. 120cmx240cmx12mm

lbr
lbr
lbr
lbr
lbr
lbr

Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
40,000.00
75,000.00
55,000.00
105,000.00
135,000.00

BAHAN FINISHING
1 KAYU
1 Menie
2 Dempul Plamir
3 Ambril/amplas
4 Cat dasar
5 Yunior 66 (nippon paint)

kg
kg
kg
kg
kg

Rp
Rp
Rp
Rp
Rp

12,500.00
11,000.00
3,500.00
13,200.00
42,000.00

6 Deculux

kg

Rp

45,000.00

TEMBOK
1 Plamir
2 Catylac
3 Mowillex
BESI
1 Menie
J

kg
kg
kg

Rp
Rp
Rp

10,500.00
90,000.00
185,000.00

kg

Rp

13,500.00

BAHAN KACA
1 Kaca polos 5 mm
2 Kaca polos 3 mm

m2
m2

Rp
Rp

65,000.00
55,000.00

ALAT PENGUNCI DAN PENGGANTUNG


1 Kunci tanam union ( 2 x slag )
2 Kunci tanam kuda ( 2 x slag )
3 Kunci tanam yale ( 2 x slag )
4 Engsel kupu-kupu biasa
5 Nylon kupu-kupu
6 Espagnoled
7 Grendel tanam luar negeri
8 Grendel biasa
9 Kait angin

bh
bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
60,000.00
125,000.00
2,250.00
5,000.00
30,000.00
7,500.00
7,500.00
5,000.00

BAHAN SANITAIR
1 Kloset jongkok
2 Wastavel meja oval
3 Wastavel gantung sudut kecil
4 Tempat sabun gantung
5 Tempat sabun tanam
6 Kran Air
7 Seal tape
8 Floor drain

bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

105,000.00
700,000.00
210,000.00
27,500.00
20,000.00
7,500.00
2,000.00
22,500.00

ALAT PENGIKAT KAYU


1 Paku uk. 1" s/d 4"
2 Tali ijuk
3 Mur baut ( kuda-kuda )
4 Lem kayu

kg
kg
kg
kg

Rp
Rp
Rp
Rp

12,000.00
6,000.00
13,000.00
18,000.00

POMPA AIR
1 Sanyo 100 watt
2 Fuji 250 watt

bh
bh

Rp
Rp

975,000.00
1,450,000.00

PAVING BLOCK
1 Trapez Grass Block abu-abu
2 Kansteen

m2
m'

Rp
Rp

41,000.00
22,500.00

LAIN-LAIN
1 Air
2 Minyak Bekisting & beton
3 Alumunium Foil
4 Paku Sekrup

liter
ltr
m2
doss

Rp
Rp
Rp
Rp

8,000.00
8,000.00
6,500.00
13,500.00

5 Bak cuci stainless steel

bh

Rp

145,000.00

6 Perekat/Lem
7 Kayu Profil
8 Besi profil
9 Sealant
10 Sekrup
11 Profil kaca
12 Kawat las
13 Alumunium Strip
14 List profil cornees gypsum
15 Tepung gypsum
16 Alkasit
17 Bak fiberglass vol 1m3 air

kg
m1
kg
tube
bh
bh
kg
m1
m1
kg
kg
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,000.00
4,200.00
14,250.00
50,000.00
750.00
9,000.00
52,000.00
30,000.00
8,000.00
3,500.00
40,000.00
825,000.00

LISTRIK
1 Kabel Overspaneng NYM 3 x 2,5 mm
2 MCB : 6 A / 5 KA / 1 pole
3 MCB : 16 A / 10 KA / 3 pole
4 Pilot lamp. Fuse
5 Voltmeter Box panel uk. 100 x 100 x 40
6 Arde / Pentanahan
7 NFB 3 phase 63 A
8 NFB 3 phase 20 A
9 .Amperemeter
10 Lampu TL 2 x 18. watt Rm.300 Kisi-kisi
11 Lampu SL 15 watt
12 Stop kontak Arde Outbow putih
13 Sakelar tunggal
14 Sakelar ganda / seri
15 Fiting
16 Lampu Pintu Gerbang ( taman )

m1
bh
bh
bh
bh
ls
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,400.00
1,750,000.00
150,000.00
241,500.00
241,500.00
90,000.00
90,000.00
240,000.00
57,000.00
27,000.00
15,500.00
12,500.00
15,000.00
20,500.00
7,500.00
2,750,000.00

m1
Unit
Unit
Unit

Rp
Rp
Rp
Rp

150,000.00
200,000.00
1,150,000.00
14,000.00

Titik

Rp

95,000.00

PENANGKAL PETIR
1 Kawat Penghantar BC 70 mm2 lengkap clamp, bracket
2 Tiang penyangga GIP dia 50 mm2 T 4 mm
3 Bak kontrol ukuran 40 x 40 x 30 cm
4 Obstruction Light 60 watt lengkap accessories
5 Instalasi Obstruction Light lengkap dengan kabel, konduite,
dan accessories

HARGA SATUAN UPAH TENAGA

No

Daftar Pekerja

Sat.

Harga (Rp)

Pekerja

OH

38,000.00

Mandor

OH

50,000.00

Tukang Listrik

OH

50,000.00

Tukang Kayu

OH

50,000.00

Kepala Tukang Kayu

OH

57,000.00

Tukang Batu

OH

50,000.00

Kepala Tukang Batu

OH

57,000.00

Tukang Besi

OH

50,000.00

Kepala Tukang Besi

OH

57,000.00

10

Tukang Cat

OH

50,000.00

11

Kepala Tukang Cat

OH

57,000.00

12

Tukang Plitur

OH

50,000.00

13

Tukang Gali

OH

37,500.00

I.

Analisa biaya konstruksi pekerjaan persiapan (SNI 2012)

Kode
Uraian pekerjaan
Koefisien Sat
I.1
1 m' Pagar sementara dari seng gelombang tinggi 2 meter
I.1.1
Bahan
- Dolken Kayu 8-10/400 cm
1.250 btg
- Seng gelombang BKLS 0.30 pj. 180cm
1.200 Lbr
- Paku
0.060 Kg

I.1.2

I.2
I.2.1

I.2.2

Harga bahan

x
x
x

Rp
Rp
Rp
Jumlah (I)

18,000.00 =
65,000.00 =
12,000.00 =
=

Rp
Rp
Rp
Rp

22,500.00
78,000.00
720.00
101,220.00

50,000.00 =

Rp

10,000.00

Rp
Rp
Rp
Rp
Rp

15,200.00
1,140.00
1,000.00
27,340.00
128,560.00

Tenaga
- Tukang kayu

0.200 Oh

Rp

- Pekerja
- Kepala tukang
- Mandor

0.400 Oh
0.020 Oh
0.020 Oh

x
x
x

Rp
38,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=

Kode
Uraian pekerjaan
I.3.2
Tenaga
- Tukang kayu
- Tukang batu
- Pekerja
- Kepala tukang
- Mandor

I.4
I.4.1

Bahan
- Kayu 5/7 (utk bowplank&pagar smentara)
- Paku
- Kayu papan 3/20 (utk bowplank)

Tenaga
- Tukang kayu
- Pekerja
- Kepala tukang
- Mandor

0.012 M
0.020 Kg
0.007 M3
3

0.100 Oh
0.100 Oh
0.010 Oh
0.005 Oh

x
x
x

x
x
x
x

Rp
5,000,000.00
Rp
12,000.00
Rp
5,300,000.00
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)

50,000.00
38,000.00
57,000.00
50,000.00

1 m2 Pembuatan kantor sementara, dengan lantai plesteran


Bahan
- Dolken Kayu 8-10/400 cm
1.250 btg
- Kayu (utk kntor semntara)
0.180 M3
- Paku
0.850 Kg
- Besi strip
1.100 Kg
- Semen portland
35.000 Kg
- Pasir pasang
0.150 M3
- Pasir beton
0.100 M3
- Batu belah
0.150 M3
- Bata merah 5 x 11 x 22 cm
30.000 Bh
- Seng plat BJLS 0.28
0.250 Lbr

=
=
=
=

Rp
Rp
Rp
Rp

60,000.00
240.00
37,100.00
97,340.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

5,000.00
3,800.00
570.00
250.00
9,620.00

Rp

106,960.00

I.4.2

I.5
I.5.1

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
1,700,000.00
12,000.00
13,000.00
1,187.50
120,000.00
195,000.00
110,000.00
450.00
20,000.00

=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,500.00
306,000.00
10,200.00
14,300.00
41,562.50
18,000.00
19,500.00
16,500.00
13,500.00
5,000.00

2.000
1.000
2.000
0.300
0.050

0.210
0.300
10.500

- Pasir beton (muntilan)

0.030

- Batu pecah 2/3


- Seng gelombang bljs 30

0.050
1.500

Tenaga
- Tukang kayu
- Pekerja
- Kepala tukang
- Mandor

2.000
1.000
0.200
0.050

1 m2 Membersihkan lapangan dan peralatan


Tenaga
- Pekerja
- Mandor

x
x
x
x
x
x
x
x
x
x

Koefisien

1 m2 Pembuatan gudang semen dan alat-alat


Bahan
- Dolken Kayu 8-10/400 cm
1.700
- Kayu (utk kntor semntara)
- Paku
- Semen portland

1 m' Pengukuran dan pemasangan bouwplank

Jumlah (I)+(II)
I.3
I.3.1

Jumlah

0.100
0.050

- Jendela nako
- Kaca polos 5mm
- Kunci tanam biasa
- Engsel
- Plywood 3 mm

2.000 Bh
0.080 M2
0.150 Bh
0.300 bh
0.060 Lbr

x
x
x
x
x

Rp
Rp
Rp
Rp
Rp
Jumlah (I)

10,500.00
55,000.00
45,000.00
2,250.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

21,000.00
4,400.00
6,750.00
675.00
2,400.00
502,287.50

Sat

Harga bahan

Jumlah

Oh
Oh
Oh
Oh
Oh

x
x
x
x
x

Rp
50,000.00
Rp
50,000.00
Rp
38,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

100,000.00
50,000.00
76,000.00
17,100.00
2,500.00
245,600.00
747,887.50

btg
M3
Kg
Kg

x
x
x
x

Rp
Rp
Rp
Rp

=
=
=
=

Rp
Rp
Rp
Rp

30,600.00
357,000.00
3,600.00
12,468.75

M3

Rp

195,000.00 =

Rp

5,850.00

M3
Lbr

x
x

Rp
110,000.00 =
Rp
65,000.00 =
Jumlah (I)
=

Rp
Rp
Rp

5,500.00
97,500.000
512,518.75

Oh
Oh
Oh
Oh

x
x
x
x

Rp
50,000.00
Rp
38,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

100,000.00
38,000.00
11,400.00
2,500.00
151,900.00
664,418.75

Oh
Oh

x
x

Rp
Rp
Jumlah

38,000.00 =
50,000.00 =
=

Rp
Rp
Rp

3,800.00
2,500.00
6,300.00

18,000.00
1,700,000.00
12,000.00
1,187.50

II.

Analisa biaya konstruksi pekerjaan tanah (SNI 2012)

Kode

Uraian pekerjaan

II.1
1 m3 Galian tanah biasa sedalam 1 meter
II.1.1 Tenaga
- Pekerja
- Mandor

II.2

Koefisien

Sat

0.750 Oh
0.025 Oh

Harga bahan

x
x

Rp
Rp
Jumlah

Jumlah

38,000.00 =
50,000.00 =
=

Rp
Rp
Rp

28,500.00
1,250.00
29,750.00

Mengurug kembali 1 m3 galian


Mengurug kembali 1m3 galian dihitung dari 1/3 kali indeks pekerjaan galian

1.200 M3

Rp
Jumlah (I)

II.3.2 Tenaga
- Pekerja
- Mandor

0.300 Oh
0.010 Oh

x
x

Rp
38,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Analisa biaya konstruksi pekerjaan pondasi (SNI 2012)

Kode
III.1
III.1.1
-

Uraian pekerjaan
Koefisien Sat
1 m3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps.
Bahan
Batu belah 15/20
1.2 M3 x
Semen portland
136 Kg x
Pasir pasang
0.544 M3 x

III.1.2
-

Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

1.5 Oh
0.75 Oh
0.075 Oh
0.075 Oh

IV.
Analisa biaya konstruksi pekerjaan dinding (SNI 2012)
Kode
Uraian pekerjaan
Koefisien
IV.1 1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 3 ps
IV.1.1 Bahan

Sat

x
x
x
x

Uraian pekerjaan

90,000.00 =
=

=
=
=
=

Rp
Rp

108,000.00
108,000.00

Rp
Rp
Rp
Rp

11,400.00
500.00
11,900.00
119,900.00

Harga bahan

Rp
Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

- Tukang batu
- Kepala tukang
- Mandor

0.300
0.100
0.010
0.015

V.
Analisa biaya konstruksi pekerjaan plesteran (SNI 2012)
Kode
Uraian pekerjaan
Koefisien
V.1
1 m2 Plesteran 1 pc : 3 ps, tebal 15 mm
V.1.1 Bahan
- Semen portland
7.776
- Pasir pasang
0.023

Jumlah

110000 =
1187.5 =
120000 =
=

Rp
Rp
Rp
Rp

132000
161500
65280
358,780.00

38000 =
50000 =
57000 =
50000 =
=
=

Rp
Rp
Rp
Rp
Rp
Rp

57000
37500
4275
3750
102525
461,305.00

Harga bahan

Koefisien

1 m2 Pasangan bata merah tebal 1/2 bata, 1 pc : 5 ps


IV.2.1 Bahan
- Bata merah 5 x 11 x 22 cm
70.000
- Semen portland
9.680
- Pasir pasang
0.045

IV.2.2 Tenaga
- Pekerja

II.3
1 m3 Urugan pasir
II.3.1 Bahan
- Pasir urug

III.

Kode

Jumlah

V.1.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.300
0.150
0.015
0.015

V.2
1 m2 Plesteran 1 pc : 5 ps, tebal 15 mm
V.2.1 Bahan
- Semen portland
- Pasir pasang

5.184
0.026

V.2.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang

0.300
0.150
0.015

- Bata merah 5 x 11 x 22 cm
- Semen portland
- Pasir pasang (muntilan)

IV.1.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

70.000 Bh
14.370 Kg
0.040 M3

0.300 Oh
0.100 Oh
0.010 Oh
0.015 Oh

x
x
x

x
x
x
x

Rp
450.00 =
Rp
1,187.50 =
Rp
120,000.00 =
Jumlah (I)
=

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

31,500.00
17,064.38
4,800.00
53,364.38

11,400.00
5,000.00
570.00
750.00
17,720.00
71,084.38

- Mandor

0.015

V.3
1 m2 Memasang Acian
V.3.1 Bahan
- Semen portland

3.250

V.3.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.200
0.100
0.010
0.010

Sat

Harga bahan

Jumlah

Bh
Kg
M3

x
x
x

Rp
450.00 =
Rp
1,187.50 =
Rp
120,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp

Oh

Rp

Rp

11,400.00

Oh
Oh
Oh

x
x
x

Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp

5,000.00
570.00
750.00
17,720.00
66,115.00

38,000.00 =
=
=
=
=
=

Rp

31,500.00
11,495.00
5,400.00
48,395.00

teran (SNI 2012)


Sat

Harga bahan

Jumlah

Kg
M3

x
x

Rp
1,187.50 =
Rp
120,000.00 =
Jumlah (I)
=

Rp
Rp
Rp

9,234.00
2,760.00
11,994.00

Oh
Oh
Oh
Oh

x
x
x
x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

11,400.00
7,500.00
855.00
750.00
20,505.00
32,499.00

Kg
M3

x
x

Rp
1,187.50 =
Rp
120,000.00 =
Jumlah (I)
=

Rp
Rp
Rp

6,156.00
3,120.00
9,276.00

Oh
Oh
Oh

x
x
x

Rp
Rp
Rp

Rp
Rp
Rp

11,400.00
7,500.00
855.00

38,000.00 =
50,000.00 =
57,000.00 =

BIGBOSS:

Oh

Rp
50,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

750.00
20,505.00
29,781.00

Kg

Rp
Jumlah (I)

Rp
Rp

3,859.38
3,859.38

Oh
Oh
Oh
Oh

x
x
x
x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp
Rp

7,600.00
5,000.00
570.00
500.00
13,670.00
17,529.38

1,187.50 =
=

=
=
=
=
=
=

VI.

Analisa biaya konstruksi pekerjaan kayu (SNI 2012)

Kode
VI.1
VI.1.1

VI.1.2

Uraian pekerjaan
1 m3 Kosen Pintu & Jendela kayu klas II
Bahan
- Kayu Klas II (Kamfer), Balok
- Paku biasa 2" - 5"
- Lem Kayu

VI.2.2

VI.3
VI.3.1

VI.3.2

Harga bahan

Jumlah

Kode
VI.4.2

1.200 M x
1.250 Kg x
1.000 Kg x
3

Rp
Rp
Rp
Jumlah (I)

6,700,000.00 =
12,000.00 =
18,000.00 =
=

Rp
Rp
Rp
Rp

8,040,000.00
15,000.00
18,000.00
8,073,000.00

38,000.00
50,000.00
57,000.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp

228,000.00
900,000.00
102,600.00
15,000.00
1,245,600.00
9,318,600.00

Uraian pekerjaan
Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

Koefisien Sat
2.400 Oh
7.200 Oh
0.720 Oh
0.120 Oh

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

VI.2
VI.2.1

Koefisien Sat

6.000 Oh
18.000 Oh
1.800 Oh
0.300 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

1 m3 Daun pintu Panel kayu klas I atau II


Bahan
- Kayu kamper, (papan)
- Lem Kayu

0.040 M3 x
0.050 Kg x

Rp
Rp
Jumlah (I)

Tenaga
- Pekerja

1.000 Oh x

- Tukang kayu
- Kepala tukang
- Mandor

3.000 Oh x
0.300 Oh x
0.050 Oh x

7,300,000.00 =
18,000.00 =
=

Rp
Rp
Rp

292,000.00
900.00
292,900.00

Rp

38,000.00 =

Rp

38,000.00

Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

50,000.00 =
57,000.00 =
50,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

150,000.00
17,100.00
2,500.00
207,600.00
500,500.00

1 m3 Pasang Konstruksi kuda-kuda kayu Konvensional kayu I ; II ; III


Bahan
- Kayu kamper, (balok)
1.1000 M3 x Rp
- Besi strip
15.000 Kg x Rp
- Paku
5.600 Kg x Rp
Jumlah (I)
Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

=
=
=
=
=
=

6,700,000.00 =
14,000.00 =
12,000.00 =
=

Rp
Rp
Rp
Rp

7,370,000.00
210,000.00
67,200.00
7,647,200.00

4.000 Oh x
12.000 Oh x
1.200 Oh x

Rp
Rp
Rp

38,000.00 =
50,000.00 =
57,000.00 =

Rp
Rp
Rp

152,000.00
600,000.00
68,400.00

0.200 Oh x

Rp

50,000.00 =

Rp

10,000.00

VI.5
VI.5.1

1 m2 Memasang rangka atap genteng kodok ,kayu klas II


Bahan
- Kayu kamper (balok), Kaso-kaso (5/7)
0.014 M3
- Reng
0.004 M4
- Paku
0.250 Kg

VI.5.2

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

VI.6
VI.6.1

0.100 Oh
0.100 Oh
0.010 Oh
0.005 Oh

1 m2 Pasang rangka langit-langit (60 x 120) cm, kayu klas I (jati)


Bahan
- Kayu jati, (balok)
0.0130 M3
- Paku usuk
0.120 Kg

VI.6.2 Tenaga
Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.170 Oh
0.270 Oh
0.027 Oh
0.009 Oh

VI.7
VI.7.1

1 m' Pasang listplank ukuran (3 x 30) cm, kayu klas I atau II


Bahan

Kayu kamper, (papan)

0.011 M3

Jumlah (II)
Jumlah (I)+(II)
VI.4
VI.4.1

=
=

Rp
Rp

830,400.00
8,477,600.00

- Paku

1 m3 Pasang Konstruksi Gording, kayu klas II


Bahan
- Kayu kamper, (balok)
- Besi strip
- Paku

VI.7.2 Tenaga
- Pekerja

1.1000 M x
15.000 Kg x
3.000 Kg x
3

Rp
Rp
Rp
Jumlah (I)

6,700,000.00 =
14,000.00 =
12,000.00 =
=

Rp
Rp
Rp
Rp

7,370,000.00
210,000.00
36,000.00
7,616,000.00

Tukang kayu
- Kepala tukang
- Mandor

0.0500 Kg

0.100 Oh
0.200 Oh
0.020 Oh
0.005 Oh

Harga bahan
x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

38,000.00
50,000.00
57,000.00
50,000.00

Jumlah
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

91,200.00
360,000.00
41,040.00
6,000.00
498,240.00
8,114,240.00

6,700,000.00 =
6,700,000.00 =
12,000.00 =
=

Rp
Rp
Rp
Rp

93,800.00
24,120.00
3,000.00
120,920.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,800.00
5,000.00
570.00
250.00
9,620.00
130,540.00

19,000,000.00 =
12,000.00 =
=

Rp
Rp
Rp

247,000.00
1,440.00
248,440.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,460.00
13,500.00
1,539.00
425.00
21,924.00
270,364.00

7,300,000.00 =

Rp

80,300.00

kodok ,kayu klas II


x
x
x

Rp
Rp
Rp
Jumlah (I)

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

120) cm, kayu klas I (jati)


x
x

Rp
Rp
Jumlah (I)

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

38,000.00
50,000.00
57,000.00
50,000.00

m, kayu klas I atau II


x

Rp

Rp
Jumlah (I)

12,000.00 =
=

Rp
Rp

600.00
80,900.00

Rp

38,000.00 =

Rp

3,800.00

x
x
x

Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

50,000.00 =
57,000.00 =
50,000.00 =
=
=

Rp
Rp
Rp
Rp
Rp

10,000.00
1,140.00
250.00
15,190.00
96,090.00

VII.
Kode
VII.1
VII.1.1

VII.1.2

VII.2
VII.2.1

Analisa biaya konstruksi pekerjaan beton (SNI 2012)


Uraian pekerjaan

Harga bahan

Jumlah

Kode

1 m3 membuat sloof beton bertulang (200 kg besi+bekisting)


Bahan
- Kayu Klas III (Terentang)
- Paku
- Minyak bekisting
- Besi beton polos (U-24)
- Kawat beton
- Semen portland
- Pasir beton (muntilan)
- Pasir beton

0.2700 M3
2.000 Kg
0.600 Lt
210.000 Kg
3.000 Kg
336.000 Kg
0.540 M3
0.810 M3

x
x
x
x
x
x
x
x

Rp
550,000.00 =
Rp
12,000.00 =
Rp
8,000.00 =
Rp
8,000.00 =
Rp
12,000.00 =
Rp
1,187.50 =
Rp
195,000.00 =
Rp
180,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

148,500.00
24,000.00
4,800.00
1,680,000.00
36,000.00
399,000.00
105,300.00
145,800.00
2,543,400.00

Rp
Rp
Rp

214,700.00
13,750.00
78,000.00

Rp
Rp
Rp
Rp
Rp

70,000.00
18,411.00
14,150.00
409,011.00
2,952,411.00

5.650 Oh x
0.275 Oh x
1.560 Oh x

Rp
Rp
Rp

- Tukang besi
- Kepala tukang
- Mandor

1.400 Oh x
0.323 Oh x
0.283 Oh x

Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

1 m3 membuat kolom beton bertulang (300 kg besi+bekisting)


Bahan
- Kayu Klas III (Terentang)
0.4000 M3 x Rp
- Paku
4.000 Kg x Rp
- Minyak bekisting
2.000 Lt x Rp
- Besi beton polos (U-24)
315.000 Kg x Rp
- Kawat beton
4.500 Kg x Rp
- Semen portland
336.000 Kg x Rp
- Pasir beton
0.540 M3 x Rp

Tenaga
- Pekerja
- Tukang batu
- Tukang kayu

0.810 M3
0.150 M3
3.500 Lbr
20.000 Btg

x
x
x
x

7.050 Oh x
0.275 Oh x
1.650 Oh x

38,000.00 =
50,000.00 =
50,000.00 =
=
=
=
=
=

550,000.00
12,000.00
8,000.00
8,000.00
12,000.00
1,187.50
195,000.00

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

220,000.00
48,000.00
16,000.00
2,520,000.00
54,000.00
399,000.00
105,300.00

Rp
180,000.00
Rp
5,500,000.00
Rp
145,000.00
Rp
18,000.00
Jumlah (I)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

145,800.00
825,000.00
507,500.00
360,000.00
5,200,600.00

38,000.00 =
50,000.00 =
50,000.00 =

Rp
Rp
Rp

267,900.00
13,750.00
82,500.00

Rp
Rp
Rp

Uraian pekerjaan
- Pasir beton

Tenaga
- Pekerja
- Tukang batu
- Tukang kayu

- Pasir beton
- Kayu Klas II Balok
- Plywood 9 mm
- Dolken kayu galam -8-10/4 m

VII.2.2

Koefisien Sat

- Kayu Klas II Balok


- Plywood 9 mm
- Dolken kayu galam -8-10/4 m

VII.3.2

VII.4
VII.4.1

Tenaga
- Pekerja
- Tukang batu
- Tukang kayu
- Tukang besi
- Kepala tukang
- Mandor

0.810 M3

0.140 M3 x
2.800 Lbr x
16.000 Btg x

6.350 Oh
0.275 Oh
1.650 Oh
1.400 Oh
0.333 Oh
0.318 Oh

x
x
x
x
x
x

1 m3 membuat dinding beton bertulang (150 kg besi+bekisting)


Bahan
- Kayu Klas III (Terentang)
0.240 M3 x
- Paku
3.200 Kg x
- Minyak bekisting
1.600 Lt x
- Besi beton polos (U-24)
157.500 Kg x
- Kawat beton
- Semen portland
- Pasir beton
- Batu pecah 2/3
- Kayu Klas II Balok
- Plywood 9 mm
- Dolken kayu galam -8-10/4 m

VII.4.2

Koefisien Sat

Tenaga
- Pekerja
- Tukang batu
- Tukang kayu
- Tukang besi
- Kepala tukang
- Mandor

2.250 Kg
336.000 Kg
0.540 M3
0.810 M3
0.1600 M3
2.800 Lbr
24.000 Btg

x
x
x
x
x
x
x

5.300 Oh
0.275 Oh
1.300 Oh
1.050 Oh
0.262 Oh
0.265 Oh

x
x
x
x
x
x

- Tukang besi
- Kepala tukang
- Mandor

VII.3
VII.3.1

2.100 Oh x
0.403 Oh x
0.353 Oh x

Rp
50,000.00 =
Rp
57,000.00 =
Rp
50,000.00 =
Jumlah (II)
=

Rp
Rp
Rp
Rp

105,000.00
22,971.00
17,650.00
509,771.00

Jumlah (I)+(II)

Rp

5,710,371.00

1 m3 membuat balok beton bertulang (200 kg besi+bekisting)


Bahan
- Kayu Klas III (Terentang)
0.3200 M3 x Rp
- Paku
3.200 Kg x Rp
- Minyak bekisting
1.600 Lt x Rp
- Besi beton polos (U-24)
210.000 Kg x Rp
- Kawat beton
3.000 Kg x Rp
- Semen portland
336.000 Kg x Rp

550,000.00
12,000.00
8,000.00
8,000.00
12,000.00
1,187.50

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

176,000.00
38,400.00
12,800.00
1,680,000.00
36,000.00
399,000.00

- Pasir beton

195,000.00 =

Rp

105,300.00

0.540 M3

Rp

VII.5
VII.5.1

VII.5.2

1 m3 membuat beton cor 1:2:3


Bahan
- Semen portland
- Pasir beton

2.125 Kg x
0.540 M3 x

- Kerikil Beton

0.810 M3

5.3000 Oh
0.275 Oh
0.262 Oh
0.265 Oh

x
x
x
x

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Harga bahan
Rp

Jumlah

180,000.00 =

Rp

145,800.00

Rp
5,500,000.00
Rp
145,000.00
Rp
18,000.00
Jumlah (I)

=
=
=
=

Rp
Rp
Rp
Rp

770,000.00
406,000.00
288,000.00
2,447,500.00

Rp
38,000.00
Rp
50,000.00
Rp
50,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

241,300.00
13,750.00
82,500.00
70,000.00
18,981.00
15,900.00
442,431.00
2,889,931.00

550,000.00
12,000.00
8,000.00
8,000.00

=
=
=
=

Rp
Rp
Rp
Rp

132,000.00
38,400.00
12,800.00
1,260,000.00

Rp
12,000.00
Rp
1,187.50
Rp
195,000.00
Rp
180,000.00
Rp
5,500,000.00
Rp
145,000.00
Rp
18,000.00
Jumlah (I)

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

27,000.00
399,000.00
105,300.00
145,800.00
880,000.00
406,000.00
432,000.00
3,838,300.00

Rp
38,000.00
Rp
50,000.00
Rp
50,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

201,400.00
13,750.00
65,000.00
52,500.00
14,934.00
13,250.00
360,834.00
4,199,134.00

0 kg besi+bekisting)
Rp
Rp
Rp
Rp

Rp
Rp

52,000.00 =
50,000.00 =

Rp
Rp

110,500.00
27,000.00

Rp
180,000.00 =
Jumlah (I)
=

Rp
Rp

145,800.00
283,300.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp
Rp

201,400.00
13,750.00
14,934.00
13,250.00
243,334.00
526,634.00

=
=
=
=
=
=

VIII.
Kode

Analisa biaya konstruksi pekerjaan penutup atap (SNI 2012)


Uraian pekerjaan

Koefisien Sat

VIII.1
1 m2 pasang atap genteng kodok / Glasur
VIII.1.1 Bahan
- Genteng kodok / Glasur

VIII.1.2 Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

IX.

Harga bahan

IX.2
IX.2.1

IX.2.2

Jumlah

Kode
X.2
X.2.1

25.000 Bh x

0.150 Oh
0.075 Oh
0.008 Oh
0.008 Oh

x
x
x
x

Rp
Jumlah (I)

2,500.00 =
=

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp

62,500.00
62,500.00

Rp
Rp
Rp
Rp
Rp
Rp

5,700.00
3,750.00
456.00
400.00
10,306.00
72,806.00

X.2.2

Analisa biaya konstruksi pekerjaan sanitasi (SNI 2012)


Uraian pekerjaan

Koefisien Sat

memasang 1 buah wastafel


Bahan
- Wastafel
- Perlengkapan 30%
- Semen Portland
- Pasir pasang

1 Bh
0.300 6.000 Kg
0.010 M3

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.2 Oh
0.145 Oh
0.150 Oh
0.100 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+

Analisa biaya konstruksi pekerjaan Langit-langit (SNI2012)

Kode
Uraian pekerjaan
Koefisien Sat
IX.1
1 m2 Langit-langit gypsum board, tebal 9 mm
IX.1.1 Bahan
- Gymsum Board (60x120 x 9) mm
0.364 Lbr x
- Paku sekrup
0.110 Kg x
- Tepung gypsum
0.450 Kg x
- Alkasit
0.003 Kg x

IX.1.2

X.

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.100 Oh
0.050 Oh
0.005 Oh
0.005 Oh

x
x
x
x

Harga bahan

Jumlah
X.3
X.3.1

Rp
Rp
Rp
Rp
Jumlah (I)

45,000.00
13,500.00
3,500.00
40,000.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

16,380.00
1,485.00
1,575.00
120.00
19,560.00

3,800.00
2,500.00
285.00
250.00
6,835.00
26,395.00

1 m' list langit-langit profil cornees gypsum lebar 5-10 cm


Bahan
- List profil cornees gypsum
1.100 M1 x Rp
- Tepung gypsum
1.050 Kg x Rp
- Alkasit
0.005 Kg x Rp
Jumlah (I)

8,000.00 =
3,500.00 =
40,000.00 =
=

Rp
Rp
Rp
Rp

8,800.00
3,675.00
212.00
12,475.00

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang

38,000.00 =
50,000.00 =
57,000.00 =

Rp
Rp
Rp

4,275.00
2,000.00
228.00

0.113 Oh x
0.040 Oh x
0.004 Oh x

Rp
Rp
Rp

X.3.2

X.4
X.4.1

X.4.2

memasang 1 m' pipa PVC tipe AW diameter 3/4"


Bahan
- Pipa PVC tipe AW 1/2"
1.2 M' x
- Perlengkapan 35%
0.350 - x

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.036 Oh
0.06 Oh
0.006 Oh
0.002 Oh

x
x
x
x

memasang 1 m' pipa PVC tipe AW diameter 23"


Bahan
- Pipa PVC tipe AW 2"
1.200 M' x
- Perlengkapan 35%
0.350 hrg x

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.054 Oh
0.090 Oh
0.009 Oh
0.003 Oh

x
x
x
x

Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+

Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+

- Mandor

X.1
X.1.1

X.1.2

0.007 Oh x

memasang 1 buah kloset jongkok/porselen


Bahan
- Kloset Jongkok
1.000 Bh x
- Semen Portland
6.000 Kg x
Pasir Pasang
0.010 Kg x
Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.000 Oh
1.500 Oh
1.500 Oh
0.160 Oh

x
x
x
x

Rp
50,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

325.00
6,828.00
19,303.00

Rp
105,000.00 =
Rp
1,187.50 =
Rp
120,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp

105,000.00
7,125.00
1,200.00
113,325.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp
Rp

38,000.00
75,000.00
85,500.00
8,000.00
206,500.00
319,825.00

=
=
=
=
=
=

X.5
X.5.1

X.5.2

memasang 1 buah kran air diameter 3/4" atau 1/2"


Bahan
- Kran air
1.000 Bh x
- Seal tape
0.025 Bh x

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh

x
x
x
x

Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+

X.6
X.6. 1

Pekerjaan Septictank per Unit


Bahan
- Galian Tanah
- Urugan Pasir
- Aanstamping
- Pas. Batu Merah 1 : 2
- Plesteran 1 : 2

- Cor Beton Camp. 1:2:3


- Berat Besi Tulangan
- Pipa + Asesoris
- Handle Bak Kontrol

5.586 m
0.390 m
0.599 m
17.950 m

x
x
x
x

Rp
Rp
Rp
Rp

23,500.00
17,000.00
217,000.00
50,000.00

=
=
=
=

Rp
Rp
Rp
Rp

17.95 m x

Rp

0.572 m x
33.800 m x
1.000 set x
1.000 Buax

Rp
Rp
Rp
Rp

457,000.00
9,000.00
80,000.00
3,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

131,261.60
6,630.00
129,874.50
897,500.00
389,515.00
261,404.00
304,200.00
80,000.00
3,000.00
2,203,385.10

21700 =

Rp

Rp
Rp
Rp
Rp

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,203,385.10

X.6. 2
-

Tenaga
Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.000 Oh
0.000 Oh
0.000 Oh
0.000 Oh

X.7
X.7.1

memasang 1 m' pipa galvanis, diameter 1"


Bahan
- Pipa galvanis dia 3/4"
- Perlengkapan 35%

1.200 M' x
0.350 - x

Rp
Rp
Jumlah (I)

21,666.67 =
21,666.67 =
=

Rp
Rp
Rp

26,000.00
7,583.33
33,583.33

Tenaga
- Pekerja
- Tukang ledeng
- Kepala tukang
- Mandor

0.054 Oh
0.090 Oh
0.009 Oh
0.027 Oh

Rp
Rp
Rp
Rp

38,000.00
50,000.00
57,000.00
50,000.00

2,052.00
4,500.00
513.00
1,350.00
8,415.00
41,998.00

X.7.2

X.8
X.8.1

X.8.2

memasang 1 buah floor drain


Bahan
- Floor drain

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

x
x
x
x

x
x
x
x

1 Bh x

0.01 Oh
0.1 Oh
0.01 Oh
0.005 Oh

x
x
x
x

Jumlah (II)

Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp
Rp

22,500.00 =
=

Rp
Rp

22,500.00
22,500.00

Rp
Rp
Rp
Rp
Rp
Rp

380.00
5,000.00
570.00
250.00
6,200.00
28,700.00

Rp
Jumlah (I)

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=

=
=
=
=
=
=

X.10
Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, ting
X.10. 1 Bahan
- Batu bata
87.000 bh x Rp
- PC
40.000 kg x Rp
- Pasir pasang
0.070 m3 x Rp
- Batu kerikil
0.070 m3 x Rp
- Besi beton

- Pasir beton
X.10. 2 Tenaga
Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.6 kg

Rp

0.060 m3 x

Rp

3.200 Oh
1.015 Oh
0.002 Oh
0.016 Oh

Rp
Rp
Rp
Rp

x
x
x
x

X.9
X.9.1

X.7.2

memasang bak fiberglass volume 1m3 air


Bahan
- Bak fiberglass
- Perlengkapan 12%

1.000 M' x
0.120 - x

Rp
825,000.00 =
Rp
825,000.00 =
Jumlah (I)
=

Rp
Rp
Rp

825,000.00
99,000.00
924,000.00

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

3.000 Oh
4.500 Oh
0.900 Oh
0.900 Oh

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

114,000.00
225,000.00
51,300.00
45,000.00
435,300.00
1,359,300.00

x
x
x
x

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=

Jumlah (II)

Jumlah (I)+(II)

Harga bahan

700,000.00
700,000.00
1,187.50
130,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

700,000.00
210,000.00
7,125.00
1,300.00
918,425.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

45,600.00
7,250.00
8,550.00
5,000.00
66,400.00
984,825.00

5,625.00 =
5,625.00 =
=

Rp
Rp
Rp

6,750.00
1,968.75
8,718.75

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,368.00
3,000.00
342.00
90.00
4,800.00
13,518.75

20,416.67 =
20,416.67 =
=

Rp
Rp
Rp

24,500.00
7,145.83
31,645.83

38,000.00
50,000.00
57,000.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp

2,052.00
4,500.00
513.00
135.00
7,200.00
38,845.83

Jumlah (I)

Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

Jumlah

Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Jumlah (I)

7,500.00 =
2,000.00 =
=

38,000.00
50,000.00
45,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp

7,500.00
50.00
7,550.00

Rp
Rp
Rp
Rp
Rp
Rp

380.00
5,000.00
450.00
250.00
6,080.00
13,630.00

Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
450.00
1,187.50
120,000.00
180,000.00

=
=
=
=

Rp
Rp
Rp
Rp

8000 =

Rp

195,000.00 =
=

Rp
Rp

39,150.00
47,500.00
8,400.00
12,600.00
12,800.00
11,700.00
132,150.00

38,000.00
50,000.00
57,000.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp

121,600.00
50,750.00
85.50
800.00
173,235.50
305,385.50

=
=
=
=
=
=

IX.

Analisa biaya konstruksi pekerjaan Langit-langit (SNI2011)

Kode
Uraian pekerjaan
Koefisien Sat
2
IX.1
1 m Langit-langit gypsum board, tebal 9 mm
IX.1.1 Bahan
- Gymsum Board (60x120 x 9) mm
0.364 Lbr x
- Paku sekrup
0.110 Kg x
- Tepung gypsum
0.450 Kg x
- Alkasit
0.003 Kg x

IX.1.2

IX.2
IX.2.1

IX.2.2

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.100 Oh
0.050 Oh
0.005 Oh
0.005 Oh

x
x
x
x

1 m' list langit-langit profil cornees gypsum lebar 5-10 cm


Bahan
- List profil cornees gypsum
1.100 M1 x
- Tepung gypsum
1.050 Kg x
- Alkasit
0.005 Kg x

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.113 Oh
0.040 Oh
0.004 Oh
0.007 Oh

x
x
x
x

Harga bahan

Rp
Rp
Rp
Rp
Jumlah (I)

Jumlah

45,000.00
13,500.00
3,500.00
40,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

16,380.00
1,485.00
1,575.00
120.00
19,560.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,800.00
2,500.00
285.00
250.00
6,835.00
26,395.00

8,000.00 =
3,500.00 =
40,000.00 =
=

Rp
Rp
Rp
Rp

8,800.00
3,675.00
212.00
12,475.00

Rp
Rp
Rp
Rp
Rp
Rp

4,275.00
2,000.00
228.00
325.00
6,828.00
19,303.00

Rp
Rp
Rp
Jumlah (I)

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

X.

Analisa biaya konstruksi pekerjaan sanitasi (SNI 2012)

Kode
Uraian pekerjaan
X.1
memasang 1 buah kloset jongkok/porselen
X.1.1
Bahan
- Kloset Jongkok
- Semen Portland
- Pasir Pasang

X.1.2

X.2
X.2.1

X.2.2

X.3
X.3.1

X.3.2

Koefisien Sat

1.000 Bh x
6.000 Kg x
0.010 Kg x

Rp
Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.000 Oh
1.500 Oh
1.500 Oh
0.160 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

memasang 1 buah wastafel


Bahan
- Wastafel
- Perlengkapan 30%
- Semen Portland
- Pasir pasang

1.000 Bh
0.300 6.000 Kg
0.010 M3

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.200 Oh
0.145 Oh
0.150 Oh
0.100 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

memasang 1 m' pipa PVC tipe AW diameter 3/4"


Bahan
- Pipa PVC tipe AW 1/2"
1.200 M'
- Perlengkapan 35%
0.350 -

x
x

Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

0.036 Oh
0.060 Oh
0.006 Oh
0.0018 Oh

X.4
X.4.1

X.4.2

memasang 1 m' pipa PVC tipe AW diameter 23"


Bahan
- Pipa PVC tipe AW 2"
- Perlengkapan 35%

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

1.200 M' x
0.350 hrg px

0.054 Oh
0.090 Oh
0.009 Oh
0.0027 Oh

x
x
x
x

Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

X.5
X.5.1

X.5.2

X.6
X.6. 1

X.6. 2

X.7
X.7.1

X.7.2

memasang 1 buah kran air diameter 3/4" atau 1/2"


Bahan
- Kran air
1.000 Bh x
- Seal tape
0.025 Bh x

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Pekerjaan Septictank per Unit


Bahan
- Galian Tanah
- Urugan Pasir
- Aanstamping
- Pas. Batu Merah 1 : 2
- Plesteran 1 : 2
- Cor Beton Camp. 1:2:3
- Berat Besi Tulangan
- Pipa + Asesoris
- Handle Bak Kontrol

0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh

x
x
x
x

5.5856 m x
0.3900 m x
0.5985 m x
17.95 m x
17.95 m x
0.5720 m x
33.80 m x
1.000 set x
1.000Buahx

Rp
Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.000 Oh
0.000 Oh
0.000 Oh
0.000 Oh

x
x
x
x

Rp
Rp
Rp
Rp

memasang 1 m' pipa galvanis, diameter 1"


Bahan
- Pipa galvanis dia 3/4"
- Perlengkapan 35%

1.200 M'
0.350 -

x
x

Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang ledeng
- Kepala tukang
- Mandor

0.054 Oh
0.090 Oh
0.009 Oh
0.027 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

X.8
X.8.1

X.8.2

X.9
X.9.1

X.7.2

memasang 1 buah floor drain


Bahan
- Floor drain

1.000 Bh x

Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

0.010 Oh
0.100 Oh
0.010 Oh
0.005 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

memasang bak fiberglass volume 1m3 air


Bahan
- Bak fiberglass
- Perlengkapan 12%

1.000 M'
0.120 -

x
x

Rp
Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

3.000 Oh
4.500 Oh
0.900 Oh
0.900 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

X.10
Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
X.10. 1 Bahan
- Batu bata
87.0000 bh x Rp
- PC
40.0000 kg x Rp
- Pasir pasang

0.0700 m3

Rp

- Batu kerikil
- Besi beton

0.0700 m3
1.6000 kg

x
x

Rp
Rp

- Pasir beton

0.0600 m3

Rp

3.200 Oh
1.015 Oh
0.002 Oh
0.016 Oh

x
x
x
x

Rp
Rp
Rp
Rp

X.10. 2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

Harga bahan

Jumlah

105,000.00 =
1,187.50 =
120,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp

105,000.00
7,125.00
1,200.00
113,325.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

38,000.00
75,000.00
85,500.00
8,000.00
206,500.00
319,825.00

700,000.00
700,000.00
1,187.50
130,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

700,000.00
210,000.00
7,125.00
1,300.00
918,425.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

45,600.00
7,250.00
8,550.00
5,000.00
66,400.00
984,825.00

5,625.00 =
5,625.00 =
=

Rp
Rp
Rp

6,750.00
1,968.75
8,718.75

Rp
Rp
Rp
Rp
Rp
Rp

1,368.00
3,000.00
342.00
90.00
4,800.00
13,518.75

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Jumlah (I)

20,416.67 =
20,416.67 =
=

Rp
Rp
Rp

24,500.00
7,145.83
31,645.83

38,000.00
50,000.00
57,000.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp

2,052.00
4,500.00
513.00
135.00
7,200.00
38,845.83

Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

7,500.00 =
2,000.00 =
=

Rp
Rp
Rp

7,500.00
50.00
7,550.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

380.00
5,000.00
450.00
250.00
6,080.00
13,630.00

Rp 23,500.00 =
Rp 17,000.00 =
Rp 217,000.00 =
Rp 50,000.00 =
Rp 21,700.00 =
Rp 457,000.00 =
Rp
9,000.00 =
Rp 80,000.00 =
Rp
3,000.00 =
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,261.60
6,630.00
129,874.50
897,500.00
389,515.00
261,404.00
304,200.00
80,000.00
3,000.00
2,203,385.10

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,203,385.10

21,666.67 =
21,666.67 =
=

Rp
Rp
Rp

26,000.00
7,583.33
33,583.33

38,000.00
50,000.00
57,000.00
50,000.00

Rp
Rp
Rp
Rp
Rp
Rp

2,052.00
4,500.00
513.00
1,350.00
8,415.00
41,998.00

Jumlah (I)

38,000.00
50,000.00
45,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

38,000.00
50,000.00
57,000.00
50,000.00

Jumlah (I)

Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

22,500.00 =
=

Rp
Rp

22,500.00
22,500.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

380.00
5,000.00
570.00
250.00
6,200.00
28,700.00

825,000.00 =
825,000.00 =
Jumlah (I)
=

Rp
Rp
Rp

825,000.00
99,000.00
924,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

114,000.00
225,000.00
51,300.00
45,000.00
435,300.00
1,359,300.00

450.00 =
1,187.50 =

Rp
Rp

39,150.00
47,500.00

Rp 120,000.00 =

Rp

8,400.00

Rp 180,000.00 =
Rp
8,000.00 =

Rp
Rp

12,600.00
12,800.00

Rp 195,000.00 =
=

Rp
Rp

11,700.00
132,150.00

Rp
Rp
Rp
Rp
Rp
Rp

121,600.00
50,750.00
85.50
800.00
173,235.50
305,385.50

Jumlah (I)

Jumlah (II)
Jumlah (I)+(II)

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

batu bata ukuran (30 x 30) cm, tinggi 35 cm


Rp
Rp

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

XI.

Analisa biaya konstruksi pekerjaan listrik (SNI 2012)

Kode
XI.1
XI.1.1

XI.2
XI.2.1

XI.3
XI.3.1

XI.4
XI.4.1

XI.5
XI.5.1

XI.5.2

Uraian pekerjaan
1 m1 pasang kabel NYM 2x 2,5 mm
Tenaga
- Tukang listrik
- Pekerja
- Mandor

1 unit pasang Box KWH dan Meter


Tenaga
- Tukang listrik
- Pekerja
- Mandor
- Pasang panel kontrol

Koefisien Sat

Harga bahan

Jumlah

Kode
XI.7
XI.7.1

0.005 Oh x
0.005 Oh x
0.005 Oh x

0.500 Oh
0.750 Oh
0.250 Oh
1.0000 Oh

1 unit pasang Box panel dan panel kontrol


Tenaga
- Tukang listrik
0.500 Oh
- Pekerja
0.750 Oh
- Mandor
0.250 Oh
- Pasang panel kontrol
1.0000 Oh

x
x
x
x

x
x
x
x

Rp
50,000.00
Rp
38,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

250.00
190.00
250.00
690.00
690.00

Rp
50,000.00
Rp
38,000.00
Rp
50,000.00
Rp
10,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

25,000.00
28,500.00
12,500.00
10,000.00
76,000.00
76,000.00

Rp
50,000.00
Rp
38,000.00
Rp
50,000.00
Rp
10,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

25,000.00
28,500.00
12,500.00
10,000.00
76,000.00
76,000.00

1 titik pekerjaan fitting


Bahan
- Titik lampu

1.000 ttk

Rp
10,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

10,000.00
10,000.00
10,000.00

1 bh pasang saklar tunggal


Bahan
- Saklar tunggal

1.000 bh

Rp
Jumlah (I)

15,000.00 =
=

Rp
Rp
Rp

15,000.00
15,000.00
30,000.00

Tenaga
- Pekerja

0.100 Oh x

Rp
38,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

3,800.00
3,800.00
33,800.00

XI.7.2

XI.8
XI.8.1

XI.8.2

XI.9
XI.9.1

XI.9.2

Uraian pekerjaan

Koefisien Sat

1 bh pasang stop kontak


Bahan
- Saklar ganda

1.000 bh x

Tenaga
- Pekerja

0.100 Oh x

1 bh pasang lampu SL 18 w
Bahan
- Lampu SL 18 W

1.000 bh x

Tenaga
- Pekerja

0.100 Oh x

1 bh pasang lampu SL 10 W
Bahan
- Lampu SL 10 W

1.000 bh x

Tenaga
- Pekerja

0.100 Oh x

XI.6
XI.6.1

XI.6.2

1 bh pasang saklar ganda


Bahan
- Saklar ganda

1.000 bh

Tenaga
- Pekerja

0.100 Oh x

Rp
Jumlah (I)

20,500.00 =
=

Rp
Rp
Rp

20,500.00
20,500.00
41,000.00

Rp
38,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

3,800.00
3,800.00
44,800.00

Harga bahan

Rp
Jumlah (I)

Jumlah

12,500.00 =
=

Rp
Rp
Rp

12,500.00
12,500.00
25,000.00

Rp
38,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

3,800.00
3,800.00
28,800.00

Rp
Jumlah (I)

27,000.00 =
=

Rp
Rp
Rp

27,000.00
27,000.00
54,000.00

Rp
38,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

3,800.00
3,800.00
57,800.00

Rp
Jumlah (I)

15,500.00 =
=

Rp
Rp
Rp

15,500.00
15,500.00
31,000.00

Rp
38,000.00 =
Jumlah (II)
=
Jumlah (I)+(II)
=

Rp
Rp
Rp

3,800.00
3,800.00
34,800.00

XII.

Analisa biaya konstruksi pekerjaan kunci dan kaca (SNI 2012)

Kode
Uraian pekerjaan
XII.1
1 bh pasang kunci tanam biasa
XII.1.1 Bahan
- Kunci tanam biasa

XII.1.2

XII.2
XII.2.1

XII.2.2

XII.3
XII.3.1

XII.3.2

XII.4
XII.4.1

Koefisien Sat

Harga bahan

1.000 Bh x

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.010 Oh
0.500 Oh
0.010 Oh
0.005 Oh

1 bh pasang kunci tanam kamar mandi


Bahan
- Kunci tanam kamar mandi

1.000 Bh x

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

1 bh pasang engsel pintu


Bahan
- Engsel pintu

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

1 m2 pasang kaca, tebal 5 mm


Bahan
- Kaca tebal 5mm

Rp
Jumlah (I)

Jumlah

45,000.00 =
=

Rp
Rp

45,000.00
45,000.00

Kode
Uraian pekerjaan
XII.5
1 bh pasang grendel
XII.5.1 Bahan
- Grendel

XII.5.2

0.005 Oh
0.500 Oh
0.005 Oh
0.0025 Oh

x
x
x
x

x
x
x
x

1.000 Bh x

0.015 Oh
0.150 Oh
0.015 Oh
0.0075 Oh

x
x
x
x

1.100 M2 x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

380.00
25,000.00
570.00
250.00
26,200.00
71,200.00

45,000.00 =
=

Rp
Rp

45,000.00
45,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

190.00
25,000.00
285.00
125.00
25,600.00
70,600.00

2,250.00 =
=

Rp
Rp

2,250.00
2,250.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

570.00
7,500.00
855.00
375.00
9,300.00
11,550.00

65,000.00 =
=

Rp
Rp

71,500.00
71,500.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

Koefisien

1.000

0.020
0.200
0.020
0.001

XII.4.2

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.015 Oh
0.150 Oh
0.015 Oh
0.00075 Oh

x
x
x
x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

570.00
7,500.00
855.00
37.50
8,962.50
80,462.50

Sat

Harga bahan

bh x

Rp
Jumlah (I)

Oh
Oh
Oh
Oh

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

x
x
x
x

Jumlah

7,500.00 =
=

=
=
=
=
=
=

Rp
Rp

7,500.00
7,500.00

Rp
Rp
Rp
Rp
Rp
Rp

760.00
10,000.00
1,140.00
50.00
11,950.00
19,450.00

XII.

Analisa biaya konstruksi pekerjaan kunci dan kaca (SNI 2011)

Kode
Uraian pekerjaan
XII.1
1 bh pasang kunci tanam biasa
XII.1.1 Bahan
- Kunci tanam biasa

XII.1.2

XII.2
XII.2.1

XII.2.2

XII.3
XII.3.1

XII.3.2

XII.4
XII.4.1

Koefisien Sat

1.000 Bh x

Rp
Jumlah (I)

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.010 Oh
0.500 Oh
0.010 Oh
0.005 Oh

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

1 bh pasang kunci tanam kamar mandi


Bahan
- Kunci tanam kamar mandi

1.000 Bh x

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

1 bh pasang engsel pintu


Bahan
- Engsel pintu

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

1 m2 pasang kaca, tebal 5 mm


Bahan
- Kaca tebal 5mm

0.005 Oh
0.500 Oh
0.005 Oh
0.0025 Oh

x
x
x
x

x
x
x
x

1.000 Bh x

0.015 Oh
0.150 Oh
0.015 Oh
0.0075 Oh

x
x
x
x

1.100 M2 x

Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

XII.4.2

XII.5
XII.5.1

XII.5.2

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

1 m2 pasang kaca, tebal 5 mm


Bahan
- Kait Angin

Tenaga
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

0.015 Oh
0.150 Oh
0.015 Oh
0.00075 Oh

x
x
x
x

1.000 bh x

0.015 Oh
0.150 Oh
0.015 Oh
0.00075 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

Rp
Jumlah (I)

Rp
Rp
Rp
Rp
Jumlah (II)
Jumlah (I)+(II)

Harga bahan

Jumlah (I)

125,000.00 =
=

Rp
Rp

125,000.00
125,000.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

380.00
25,000.00
570.00
250.00
26,200.00
151,200.00

45,000.00 =
=

Rp
Rp

45,000.00
45,000.00

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

190.00
25,000.00
285.00
125.00
25,600.00
70,600.00

5,000.00 =
=

Rp
Rp

5,000.00
5,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

570.00
7,500.00
855.00
375.00
9,300.00
14,300.00

65,000.00 =
=

Rp
Rp

71,500.00
71,500.00

Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

Jumlah

38,000.00
50,000.00
57,000.00
50,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

570.00
7,500.00
855.00
37.50
8,962.50
80,462.50

5,000.00 =
=

Rp
Rp

5,000.00
5,000.00

Rp
Rp
Rp
Rp
Rp
Rp

570.00
7,500.00
855.00
37.50
8,962.50
13,962.50

Jumlah (II)
Jumlah (I)+(II)

Jumlah (I)

38,000.00
50,000.00
57,000.00
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

XIII.

Analisa biaya konstruksi pekerjaan penutup lantai dan dinding (SNI 2012)

Kode

Uraian pekerjaan

XIII.1
1 m2 pasang lantai keramik 20 x 20 cm
XIII.1.1 Bahan
- Ubin keramik 20 x 20 cm
- Semen portland
- Pasir pasang (muntilan)
- Semen warna

XIII.1.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

XIII.2
1 m2 pasang lantai keramik 30 x 30 cm
XIII.2.1 Bahan
- Ubin keramik 30 x 30 cm
- Semen portland
- Pasir pasang (muntilan)
- Semen warna

XIII.2.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

XIII.3
1 m2 Pasang Paving Block t = 8cm K-300
XIII.3.1 Bahan
- Paving block 8 cm. abu-abu K-300
- Pasir pasang (Muntilan)
- Alat bantu
XIII.3.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang

Koefisien Sat

26.500 Bh
10.400 Kg
0.0450 M3
1.620 Kg

0.700 Oh
0.350 Oh
0.035 Oh
0.035 Oh

Harga bahan

x
x
x
x

x
x
x
x

Jumlah

Rp
1,240.00 =
Rp
1,187.50 =
Rp
120,000.00 =
Rp
10,000.00 =
Jumlah (I)
=

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

32,860.00
12,350.00
5,400.00
16,200.00
66,810.00

26,600.00
17,500.00
1,995.00
1,750.00
47,845.00
114,655.00

11.870 Bh
10.000 Kg
0.0450 M3
1.500 Kg

x
x
x
x

Rp
2,727.27 =
Rp
1,187.50 =
Rp
120,000.00 =
Rp
10,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp
Rp

32,372.69
11,875.00
5,400.00
15,000.00
64,647.69

0.700 Oh
0.350 Oh
0.035 Oh
0.035 Oh

x
x
x
x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

26,600.00
17,500.00
1,995.00
1,750.00
47,845.00
112,492.69

Rp
41,000.00 =
Rp
120,000.00 =
Rp
25,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp

41,000.00
8,640.00
435.00
50,075.00

Rp
Rp
Rp

Rp
Rp
Rp

19,000.00
11,850.00
2,850.00

1.000 M2 x
0.0720 M3 x
0.0174 Unitx

0.500 Oh x
0.237 Oh x
0.050 Oh x

38,000.00 =
50,000.00 =
57,000.00 =

Kode

Uraian pekerjaan

XIII.4.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

KoefisienSat
0.900 Oh
0.450 Oh
0.045 Oh
0.045 Oh

x
x
x
x

XIII.5
1 m2 pasang dinding keramik 10 x 20 cm
XIII.5.1 Bahan
- Ubin keramik 10 x 20 cm
5.300 Bh
- Semen portland
1.140 Kg
- Pasir pasang (muntilan)
0.0030 M3
- Semen warna
0.025 Kg

x
x
x
x

XIII.5.2 Tenaga
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor

x
x
x
x

0.090 Oh
0.090 Oh
0.009 Oh
0.005 Oh

- Mandor

XIII.4
1 m2 pasang dinding keramik 20 x 25 cm
XIII.4.1 Bahan
- Ubin keramik 20 x 20 cm
- Semen portland
- Pasir pasang (muntilan)
- Semen warna

0.010 Oh x

26.500 Bh
9.300 Kg
0.0180 M3
1.940 Kg

x
x
x
x

Rp
50,000.00 =
Jumlah (II)
=
Jumlah
=

Rp
Rp
Rp

500.00
34,200.00
84,275.00

Rp
1,320.00 =
Rp
1,187.50 =
Rp
120,000.00 =
Rp
10,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp
Rp

34,980.00
11,043.75
2,160.00
19,400.00
67,583.75

Harga bahan

Jumlah

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

34,200.00
22,500.00
2,565.00
2,250.00
61,515.00
129,099.00

Rp
5,000.00
Rp
1,187.50
Rp
120,000.00
Rp
10,000.00
Jumlah (I)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

26,500.00
1,353.75
360.00
250.00
28,463.75

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,420.00
4,500.00
513.00
250.00
8,683.00
37,147.00

XIV.

Analisa biaya konstruksi pekerjaan pengecetan (SNI 2012)

Kode

Uraian pekerjaan

Koefisien Sat

Harga bahan

1 m2 pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar,


2 lapis cat penutup
XIV.1.1 Bahan
- Meni kayu
0.200 Kg x Rp
- Plamir kayu
0.150 Kg x Rp
- Cat dasar (cat kayu)
0.170 Kg x Rp
- Cat penutup (cat kayu)
0.260 Kg x Rp
Jumlah (I)

Jumlah

XIV.1

12,500.00
11,000.00
13,200.00
39,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

2,500.00
1,650.00
2,244.00
10,140.00
16,534.00

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,660.00
450.00
342.00
125.00
3,577.00
20,111.00

10,500.00 =
12,500.00 =
90,000.00 =
=

Rp
Rp
Rp
Rp

1,050.00
1,250.00
23,400.00
25,700.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

760.00
3,150.00
359.10
125.00
4,394.10
30,094.10

1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,


2 lapis cat penutup)
XIV.3.1 Bahan
- Plamir tembok
0.100 Kg x Rp
10,500.00 =
- Cat dasar (cat tembok)
0.100 Kg x Rp
12,500.00 =
- Cat penutup (cat tembok), mowillex
0.260 Kg x Rp
185,000.00 =
Jumlah (I)
=

Rp
Rp
Rp
Rp

1,050.00
1,250.00
48,100.00
50,400.00

XIV.3.2 Tenaga
- Pekerja

Rp

760.00

XIV.1.2 Tenaga
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor

0.070 Oh
0.009 Oh
0.0060 Oh
0.0025 Oh

x
x
x
x

XIV.2

1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,


2 lapis cat penutup)
XIV.2.1 Bahan
- Plamir tembok
0.100 Kg x Rp
- Cat dasar (cat tembok)
0.100 Kg x Rp
- Cat penutup (cat tembok)ex, catylac
0.260 Kg x Rp
Jumlah (I)
XIV.2.2 Tenaga
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor

0.020 Oh
0.063 Oh
0.0063 Oh
0.0025 Oh

x
x
x
x

Rp
38,000.00
Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

XIV.3

0.020 Oh x

Rp

38,000.00 =

- Tukang cat
- Kepala tukang
- Mandor

0.063 Oh x
0.0063 Oh x
0.0025 Oh x

Rp
50,000.00
Rp
57,000.00
Rp
50,000.00
Jumlah (II)
Jumlah (I)+(II)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

3,150.00
359.10
125.00
4,394.10
54,794.10

RENCANA ANGGARAN BIAYA (RAB )


Err:509
Err:509
Err:509
NO.

URAIAN PEKERJAAN

JML HARGA

DURASI

BOBOT (%)

LANTAI 1
I

PEKERJAAN PERSIAPAN

Pembersihan Lahan

Rp.

2,875,000.000

1.000

0.198

Pembuatan Kantor Sementara dan Gudang

Rp.

10,579,760.000

1.000

0.634

Pengadaan Air Kerja

Rp.

500,000.000

20.000

0.036

Pembuatan Pagar Sementara

Rp.

42,717,600.000

1.000

3.118

Pengadaan Skafolding

Rp.

558,737.500

1.000

0.034

Pemasangan Bouwplank

Rp.

13,872,680.000

1.000

1.016

Dokumentasi

Rp.

500,000.000

10.000

0.036

Pembuatan Papan Nama

Rp.

500,000.000

2.000

0.036

II

PEKERJAAN TANAH

Galian Footplat

Rp.

3,379,320.000

3.000

0.228

Galian Pondasi

Rp.

4,757,775.000

3.000

0.321

Galian Rolag

Rp.

13,140.000

1.000

0.001

Urugan pasir bawah pondasi

Rp.

1,500,210.000

1.000

0.120

Urugan tanah kembali

Rp.

1,858,126.667

1.000

0.125

Urugan pasir bawah lantai

Rp.

676,162.500

1.000

0.046

Urugan pasir bawah footplat

Rp.

114,851.520

1.000

0.009

Urugan pasir bawah rollag

Rp.

2,716,745.000

1.000

0.183

Urugan tanah rollag

Rp.

63,343.519

1.000

0.005

III

PEKERJAAN PASANGAN

Pemasangan Aanstamping

Rp.

7,728,570.000

2.000

0.534

Pas Pondasi Batu kali

Rp.

35,132,279.600

3.000

2.220

Pas. Rolag batu bata

Rp.

47,818.800

1.000

0.003

Pas. Bata camp 1 : 5

Rp.

32,977,106.365

3.000

1.970

Pas. Bata camp 1 : 3

Rp.

3,058,641.810

3.000

0.184

Plesteran camp 1 : 5

Rp.

28,968,363.337

2.000

1.623

Plesteran camp 1 : 3

Rp.

2,731,572.816

2.000

0.155

Acian

Rp.

17,601,194.538

2.000

1.033

IV

PEKERJAAN BETON

Foot plat 120/120

Rp.

32,735,404.800

4.000

2.010

Lantai kerja footplat t=10 cm

Rp.

2,043,216.000

2.000

0.140

Sloof 15/20

Rp.

5,303,572.200

3.000

0.324

Sloof 20/25

Rp.

17,511,795.000

2.000

1.070

Kolom Pedestel 30/30

Rp.

33,439,126.392

3.000

2.137

Kolom30/30

Rp.

63,391,708.800

3.000

4.050

Kolom 15/15

Rp.

15,847,927.200

2.000

1.013

Balok 20/30

Rp.

39,144,227.400

3.000

2.533

Balok 15/20

Rp.

6,783,870.000

2.000

0.434

10

Pelat beton lantai 2, t=11 cm

Rp.

97,587,809.000

3.000

6.428

11

Pelat dak beton, t=10 cm

Rp.

26,525,695.000

3.000

1.747

12

Kantilever, t=10 cm

Rp.

1,337,430.000

2.000

0.088

13

Tangga Beton

Rp.

21,569,314.665

3.000

1.381

PEKERJAAN KUSEN PINTU + JENDELA

Kusen P1 , 4bh

Rp.

1,183,104.000

2.000

0.084

Kusen dan daun pintu P2, 1bh

Rp.

9,540,232.000

1.000

0.681

Kusen dan daun pintu P3, 4bh

Rp.

37,425,232.000

3.000

2.670

Kusen P4 PVC, 5bh

Rp.

1,250,000.000

2.000

0.089

Kusen J1

Rp.

338,832.000

1.000

0.024

Kusen J2

Rp.

833,040.000

2.000

0.059

Kusen J3

Rp.

396,864.000

2.000

0.028

Kusen BV

Rp.

86,112.000

2.000

0.006

VI

PEKERJAAN PLAFOND & CAT

Gypsum Board rangka hollow

Rp.

5,800,536.000

3.000

0.493

List Plafond

Rp.

2,101,089.250

2.000

0.158

Pengecatan tembok

Rp.

10,943,638.84

3.000

0.736

Pengecatan plafond

Rp.

2,412,963.000

2.000

0.162

VII

PEKERJAAN KUNCI, KACA & PENGGANTUNG

Kunci tanam biasa

Rp.

1,346,175.000

1.000

0.095

Kunci tanam pintu WC

Rp.

345,187.500

1.000

0.024

Engsel pintu

Rp.

409,875.000

1.000

0.036

Kaca P1, 4bh

Rp.

1,286,187.000

1.000

0.092

Kaca P2,1bh

Rp.

19,139.688

1.000

0.001

Kaca P3,4bh

Rp.

76,982.250

1.000

0.005

Kaca J1

Rp.

115,473.375

1.000

0.008

Kaca J2

Rp.

1,085,449.725

1.000

0.077

Kaca J3

Rp.

114,838.125

1.000

0.008

10

Kaca BV

Rp.

321,546.750

1.000

0.023

VIII

PEKERJAAN INSTALASI LISTRIK

Lampu TL 2x 18W RM DECO

Rp.

189,000.000

1.000

0.013

Lampu Down light PLC E 15W

Rp.

170,500.000

1.000

0.012

Saklar tunggal

Rp.

102,500.000

1.000

0.007

Saklar ganda

Rp.

164,000.000

1.000

0.012

Stop kontak

Rp.

246,000.000

1.000

0.018

Box panel

Rp.

300,000.000

1.000

0.021

Instalasi titik lampu

Rp.

387,500.000

3.000

0.028

IX

PEKERJAAN LANTAI

Pasang Keramik granito 60 x 60

Rp.

34,774,300.000

3.000

2.463

Pasang Keramik granito 40 x 40

Rp.

6,710,860.000

3.000

0.474

Pasang Keramik lantai 30 x 30

Rp.

5,670,480.135

2.000

0.398

Pasang Keramik lantai 30 x 30 (Tangga)

Rp.

1,531,029.636

1.000

0.108

Pasang Keramik lantai 20 x 20 (KM/WC dan teras)

Rp.

3,998,340.000

1.000

0.278

PEKERJAAN SANITASI

Closet jongkok

Rp.

1,405,750.000

1.000

0.370

Wastafel

Rp.

4,894,325.000

1.000

0.371

Septictank & peresapan

Rp.

4,406,770.200

4.000

0.314

Kran air

Rp.

187,020.000

1.000

0.013

Pipa PVC 1/2"

Rp.

301,611.700

2.000

0.021

Pipa Galvanis 3/4"

Rp.

1,818,250.000

2.000

0.127

Bak kontrol

Rp.

100,000.000

1.000

0.007

Ground tank

Rp.

1,000,000.000

4.000

0.071

Tandon air

Rp.

250,000.000

1.000

0.018

10

Floor drain

Rp.

225,000.000

1.000

0.016

JML TOTAL :

NO.

URAIAN PEKERJAAN

JML HARGA

LANTAI 2
I

PEKERJAAN PASANGAN

Pas. Bata camp 1 : 5

Rp.

30,694,024.325

3.000

1.834

Pas. Bata camp 1 : 3

Rp.

61,986.094

3.000

0.004

Plesteran camp 1 : 5

Rp.

26,962,815.933

2.000

1.510

Plesteran camp 1 : 3

Rp.

55,357.750

2.000

0.003

Acian

Rp.

15,100,565.875

2.000

0.886

II

PEKERJAAN BETON

Kolom 30/30

Rp.

61,127,719.200

3.000

3.906

Kolom 15/15

Rp.

13,583,937.600

2.000

0.868

Ring balok 15/20

Rp.

25,281,217.200

2.000

1.615

Kantilever, t=10 cm

Rp.

45,472,620.000

2.000

2.995

III

PEKERJAAN KUSEN PINTU + JENDELA

Kusen P1 , 2bh

Rp.

591,552.000

2.000

0.042

Kusen dan daun pintu P2, 4bh

Rp.

37,425,232.000

2.000

2.670

Kusen P4 PVC, 5bh

Rp.

1,000,000.000

1.000

0.071

Kusen dan daun jendela J3, 9bh

Rp.

1,785,888.000

2.000

0.127

Kusen J5

Rp.

291,564.000

2.000

0.021

Kusen J6

Rp.

89,856,000.000

2.000

6.411

Kusen BV

Rp.

21,840,000.000

2.000

1.558

IV

PEKERJAAN PLAFOND & CAT

Gypsum Board rangka hollow

Rp.

4,484,448.000

3.000

0.381

List Plafond

Rp.

971,714.250

2.000

0.073

Pengecatan tembok

Rp.

9,388,859.310

3.000

0.632

Pengecatan plafond

Rp.

1,865,484.000

3.000

0.126

PEKERJAAN ATAP

Rangka Atap LT 1 & 2

Rp.

28,220,083.535

4.000

4.840

Gording

Rp.

8,697,000.000

2.000

0.621

Nok

Rp.

5,336,628.000

2.000

0.344

Papan Ruiter

Rp.

816,172.500

2.000

0.155

Papan Listplank 3/30

Rp.

4,180,743.750

1.000

0.793

Atap Genteng

Rp.

12,801,822.390

4.000

0.645

VI

PEKERJAAN KUNCI, KACA & PENGGANTUNG

Kunci tanam biasa

Rp.

1,047,025.000

1.000

0.074

Kunci tanam pintu WC

Rp.

828,450.000

1.000

0.057

Engsel pintu

Rp.

450,862.500

1.000

0.040

Kaca J3

Rp.

516,771.563

2.000

0.037

Kaca J5

Rp.

138,568.050

2.000

0.010

Kaca J6

Rp.

1,385,680.500

2.000

0.099

Kaca BV

Rp.

258,660.360

2.000

0.018

VII

PEKERJAAN INSTALASI LISTRIK

Lampu TL 2x18W RM DECO

Rp.

121,500.000

1.000

0.009

Lampu Down light PLC 15W

Rp.

93,000.000

1.000

0.007

Saklar ganda

Rp.

164,000.000

1.000

0.012

Stop kontak

Rp.

246,000.000

1.000

0.018

Instalasi titik lampu

Rp.

232,500.000

1.000

0.017

VIII

PEKERJAAN LANTAI

Pasang Keramik granito 40 x 40

Rp.

30,715,090.000

3.000

2.170

Pasang Keramik lantai 30 x30

Rp.

9,808,180.000

2.000

0.693

Pasang Keramik lantai 20 x 20 (KM/WC)

Rp.

3,220,885.000

2.000

0.224

IX

PEKERJAAN SANITASI

Closet jongkok

Rp.

1,124,600.000

1.000

0.296

Wastafel

Rp.

1,957,730.000

1.000

0.148

Kran air

Rp.

207,800.000

1.000

0.015

Pipa PVC 1/2"

Rp.

78,150.400

2.000

0.005

Pipa PVC 3/4"

Rp.

187,020.000

2.000

0.013

Floor Drain

Rp.

38,100.000

1.000

0.009

PEKERJAAN RANGKA BAJA

Kuda-kuda Baja

Rp.

30,126,238.800

3.000

2.150

1/2 Kuda-kuda

Rp.

16,423,428.000

3.000

1.172

Jurai

Rp.

23,812,412.400

2.000

1.699

Gording CNP 125.50.20.3,2 mm

Rp.

10,193,588.580

2.000

0.727

Trackstang

Rp.

471,822.960

1.000

0.034

Kres Angin

Rp.

646,808.820

2.000

0.046

Kupingan

Rp.

72,612.120

2.000

0.005

Kawat Las, OKSIGEN, Menie & Pengencer

Rp.

8,174,628.840

2.000

0.583

10

Spankruff 1/2''

Rp.

80,000.000

1.000

0.006

11

Baut 10mm

Rp.

160,000.000

3.000

0.011

12

Baut 12mm

Rp.

432,000.000

3.000

0.031

JML TOTAL :

NO.

URAIAN PEKERJAAN

JML HARGA

INFRASTRUKTUR
I

PEKERJAAN TANAH

Galian Pondasi Pagar

Rp.

1,716,412.500

2.000

0.116

Urugan Pasir bawah pondasi

Rp.

541215.00

1.000

0.043

Urugan tanah kembali

Rp.

1,984,455.000

1.00

0.159

II

PEKERJAAN PASANGAN

Pemasangan Aanstamping

Rp.

2,788,155.000

2.000

0.192

Pas Pondasi Batu kali

Rp.

12,674,303.400

3.000

0.801

Pas. Bata camp 1 : 5

Rp.

567,848.250

2.000

0.034

III

PEKERJAAN BETON

kolom 15/15

Rp.

1,125,758.250

2.000

0.069

sloof 15/20

Rp.

10,753,950.600

2.000

0.687

IV

PEKERJAAN LANTAI

Pasang paving block

Rp.

22,178,474.400

3.000

1.491

V
1

PEKERJAAN INSTALASI AC
Pengadaan dan Pemasangan Unit AC Sentral
Rp.

2,450,000.00

2.00

0.175

- Refrigerant : R - 22

Rp.

1,500,000.00

2.00

0.107

- Dudukan out door

Rp.

210,000.00

2.00

0.015

- Ongkos Pasang

Rp.

300,000.00

2.00

0.021

- Type : Air cooled split duct


Kapasitas pendingin : 100.000,00 btu / h
Karakteristik : 380 V, 1 Ph, 50 Hz

JML TOTAL :

NO.

URAIAN PEKERJAAN

JML HARGA

POS SATPAM
I

PEKERJAAN PERSIAPAN

Pembersihan Lahan

Rp.

100,000.00

1.000

0.007

Pemasangan Bouwplank

Rp.

816,040.000

1.00

0.060

II

PEKERJAAN TANAH

Galian Pondasi

Rp.

240,900.000

1.000

0.016

Urugan pasir bawah pondasi

Rp.

1,500,210.000

1.000

0.120

Urugan tanah kembali

Rp.

278,520.00

1.000

0.022

Urugan pasir bawah lantai

Rp.

75,960.000

1.00

0.006

III

PEKERJAAN PASANGAN

Pemasangan Aanstamping

Rp.

391,320.000

1.000

0.027

Pas Pondasi Batu kali

Rp.

1,778,849.600

2.000

0.112

Pas. Bata camp 1 : 5

Rp.

2,125,280.000

1.000

0.127

Pas. Bata camp 1 : 3

Rp.

198,355.500

1.000

0.012

Plesteran camp 1 : 5

Rp.

1,866,928.000

1.000

0.105

Plesteran camp 1 : 3

Rp.

177,144.800

1.000

0.010

Acian

Rp.

1,134,915.000

1.000

0.067

IV

PEKERJAAN BETON

Sloof 15/20

Rp.

800,539.200

2.000

0.049

Kolom 15/15

Rp.

2,263,989.600

2.000

0.145

Ring balk15/20

Rp.

39,144,227.400

2.000

2.533

Pelat dak beton, t=10 cm

Rp.

3,343,575.000

3.000

0.220

PEKERJAAN KUSEN PINTU + JENDELA

Kusen dan daun pintu P2, 1bh

Rp.

9,540,232.000

2.000

0.681

Kusen J4

Rp.

350,064.000

2.000

0.025

VI

PEKERJAAN PLAFOND & CAT

Gypsum Board rangka hollow

Rp.

97,488.000

1.000

0.008

List Plafond

Rp.

216,840.00

1.000

0.016

Pengecatan tembok

Rp.

705,639.600

1.000

0.047

Pengecatan plafond

Rp.

40,554.000

1.000

0.003

VII

PEKERJAAN KUNCI, KACA & PENGGANTUNG

Kunci tanam biasa

Rp.

149,575.000

1.000

0.011

Engsel pintu

Rp.

40,987.500

1.000

0.004

Kaca P2,1bh

Rp.

19,139.688

1.000

0.001

Kaca J4

Rp.

229,676.250

1.000

0.016

VIII

PEKERJAAN INSTALASI LISTRIK

Lampu Down light PLC 15W

Rp.

15,500.000

1.000

0.001

Saklar tunggal

Rp.

20,500.000

1.000

0.001

Stop kontak

Rp.

20,500.000

1.000

0.001

Instalasi titik lampu

Rp.

15,500.000

1.000

0.001

IX

PEKERJAAN LANTAI

Pasang Keramik lantai 20 x 20

Rp.

436,190.780

1.000

0.031

68,135,140.92
1,511,284,233.44
PROSENTASE PER MINGGU