1.material Inspection Request (MIR)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AI & ASSOCIATES LTD

Materials Inspection Request


Date ..
Name Of the Contractor:
Package Name :

Package No :

MIR No :

Description of Materials:
Location : Building /Area :

Level

Zone :
Location

A.B.C Grids

1.2.3Grids.

Following Observations have been performed by Vendors Site engineer/Project engineer :SL. No.

2
3
4

5
6
7

System Description

Yes/NO/
NA

Checked by Engineers
Name

Signature

Remarks, If any

The attachment of Proforma


Invoice( PI) copy /Materials
delivery chalan/ Packing List.
Materials is as per project
requirement and as per the
approved specification.
The Materials are free from
damage/defect
The Materials are as per the
approved Origin and
Manufacturers .
Testing equipment(like disital gauss
meeter,Meger etc). is arranged for
materials testing
The supply materials is as per the
approved sample
The manufacturer submittals is
available along with materials
Submitted By Vendor

Checked By MEP Con

Verified By PMC Approved by SHDL

Name
Signature
Date
Comments if any by Consultant:PMC-RBVH-MEP-GEN-03/13