Piping Estimate & Summary Form
Piping Estimate & Summary Form
Piping Estimate & Summary Form
Supervision
Preliminary Design
Detailed Design
Acitivity
Code
250
PEL
Work Assignment,
Planning, Status Report
Meetings w/
Department, Project &
Client, Emp.. Perform.
Reviews, Technical
Direction, P&ID
Reviews
Specifications,
Standards, Develop
CCC, Vendor Data SQ
CK
Specifications,
Standards, Plot Plan
Developm't, Vendor
Data SQ CK, Heat
Tracing Criteria, Field
Trips
Transpositions, Vessel
Orientations, Model
Index, Drawing Index,
Layout Studies,
C
Model Reviews
SP Item Activities,
Model Reviews,
2D CADD, 3D CADD,
Manual Drawings,
Revise Exist.
Dwgs.,Model Reviews,
Construction Work
Packages (CWP)
Line List
Manual Isometrics,
CADD Isometrics,
Piping Plans, Piping
Sections, Isometric
Index, Tie-In Index,
Tie-In List, Tie-In Isos.,
Heat Tracing
Isometrics, Heat
Tracing Index, Demo
Dwg's,
Final MTO, PO
Supplements, Shortage
Reports, Overage
Reports,
Deliverables
Services
CADD Coordinator
Page 1
Specifications,
Standards, Define Pipe
Stress Analysis Criteria,
Pre-Eng. Pipe Supports
Vendor Data SQ CK
ob Description)
ob Description)
Description)
b Description)
Job Description)
Page 2
PIPING ENGINEERING AND DESIGN __ SUMMARY OF HOME OFFICE LABOR AND COST ESTIMATE & FINAL REPORT
PROJECT NAME:
PROJECT MANAGER:
CLIENT:
PREPARED BY (LPE):
LOCATION:
APPROVED BY:
PROJECT NO.:
PLANT TYPE:
REV.:
(EPC, EPCM, etc.)
PIPING ENGINEERING
OPER. No.
GROUP
DATE:
DISCIPLINE ESTIMATE
ESTIMATED
LABOR HOURS
% OF TOTAL
ESTIMATED
COMPUTER
EXPENSES $
APPV'D BUDGET
ESTIMATED
TRAVEL &
LODGING
EXPENSES $
BUDGET
LABOR
HOURS
% OF
TOTAL
ACTUAL
LABOR
HOURS
#VALUE!
#VALUE!
252
PIPING DESIGN
#VALUE!
#VALUE!
253
#VALUE!
#VALUE!
254
#VALUE!
#VALUE!
#VALUE!
$0.00
$0.00
FINAL REPORT
251
CONTRACT TYPE :
% OF TOTAL
250
#VALUE!
#VALUE!
ALL
#VALUE!
100 %
100 %
100 %
HRS/ISO=
#VALUE!
HRS/ISO=
#VALUE!
HRS/ISO =
#VALUE!
REMARKS:
PIPING ENGINEERING & DESIGN HOME OFFICE LABOR, EXPENSE ESTIMATE DETAIL
PROJECT NO.
PLEASE NOTE
251. . . . P I P I N G M A T E R I A L E N G I N E E R I N G
SPECIFICATIONS
SPEC NO.
QUANTITY
ESTIMATE
HOURS
DEFAULT
LABOR HRS
20
20
20
ISULATING,PAINTING,COATING,LINING
20
WELDING / NDE
20
LABOR HRS
0.5
#VALUE!
SUPERVISION
252--PIPING MATERIAL ENGINEERING TOTALS - HRS
TOTAL LABOR
HRS
10%=
#VALUE!
AJUSTMENT
#VALUE!
#VALUE!
0
252 . . . . P I P I N G D E S I G N
ESTIMATE
ACTIVITY
DRAWINGS/DOCUMENTS
SCALE
( DWG. SIZE= A - B - C - D - E )
(OPTIONAL)
SIZE
(OPTIONAL)
NUMBER
HOURS
OF
PER
DEFAULT
ITEMS
ITEM
HRS
LABOR HRS
100
40
120
100
20
141
3D MODELING - EQUIPMENT
40
4.25
15
8.25
40
20
20
EXTRACT ISOMETRICS - 3D
VARIOUS
VARIOUS
N/A
TOTAL LABOR
HRS
SPECIFICATIONS
SPEC NO.
QUANTITY
HRS. PER.
DEFAULT
HRS
10
SHOP FABRICATION
10
FIELD FABRICATION
10
TIE INS
10
10
HEAT TRACING
10
0
0
QUANTITY
HRS. PER.
DEFAULT
HRS
DAYS / HOURS
TIE IN LIST
CAD COORDINATOR
WEEKS / HOURS
40
ISOMETRIC
COUNT
SUPERVISION
251 - PIPING DESIGN TOTALS - DWGS, SPECS, LABOR HOURS
10%=
#VALUE!
AJUSTMENT=
#VALUE!
#VALUE!
0
253 . . . . P I P I N G M A T E R I A L C O N T R O L
ESTIMATE
ACTIVITIES
QUANTITY
HRS. PER.
DEFAULT
HRS
0.5
PER ISO
PER ISO
0.5
PER RFQ/PO,
ETC
80
0
0
SUPERVISION
253 - PIPING MATERIAL CONTROLS TOTAL - LABOR HRS
TOTAL LABOR
HRS
10%=
#VALUE!
AJUSTMENT=
#VALUE!
#VALUE!
0
254. . . . P I P E S T R E S S E N G I N E E R I N G
SPECIFICATIONS
SPEC NO.
ESTIMATE
QUANTITY
HOURS
DEFAULT
LABOR HRS
ANALYSIS
20
20
10
OTHER
20
0
0
TOTAL LABOR
HRS
QUANTITY
HOURS
DEFAULT
LABOR HRS
10
SUPERVISION
254 - PIPE STRESS ENGINEERING TOTAL -LABOR HRS
10%=
#VALUE!
AJUSTMENT=
#VALUE!
#VALUE!
TECH. TOTAL
#VALUE!
0
250 . . . . L E A D P I P I N G E N G I N E E R
DEFAULT
LABOR HRS
DAYS
EACH
20
PEOPLE
40
DAYS
DAYS
DAYS
WEEKS
40
ACTIVITIES
B
TECHNICAL AIDE
ESTIMATE
NUMBER
PEOPLE
WEEKS x 40
HRS
Q.A. AUDIT
ACTIVITIES
PEOPLE
WEEKS x 40
HRS
"X" = Activity that is required but will be handled under a different budget.
10%=
#VALUE!
HOURS
TOTAL LABOR
HRS
#VALUE!
AJUSTMENT=
FLWB
#VALUE!
#VALUE!
AIL
NOTES:
#VALUE!
NOTES:
#VALUE!
NOTES:
#VALUE!
NOTES:
#VALUE!
NOTES:
#VALUE!
100
FINAL
QUANTITY
LABOR HRS
TOTAL
LABOR HRS
0
LABOR HRS
ACTUAL.
LINE No. =
0
FINAL
SIZE
SCALE
NUMBER
AVG. HOURS
OF
OF
PER
LABOR
DRAWINGS
DRAWINGS
DRAWING
HRS
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
TOTAL
LABOR HRS
QUANTITY
HRS
QUANTITY
HRS
0
FINAL
QUANTITY
LABOR HRS
TOTAL
LABOR HRS
0
FINAL
QUANTITY
HRS
TOTAL
LABOR HRS
0
HRS
0
0
FINAL
LABOR HRS
TOTAL
LABOR HRS
0
0
100