Piping Fabrication Procedure For Water Treatment Package

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

CONSORTIUM OF :

PIPING FABRICATION PROCEDURE


FOR WATER TREATMENT PACKAGE
Document No :

Rev No.

PO No :

UBL3&4-0-W1-IP-AA0-016-TCI-064

UBL3&4-E-5-W1-PO-WS5-064-R

(PT. TRACON INDUSTRI)

PROJECT

0
Rev

ULUBELU UNIT 3&4 GEOTHERMAL POWER


PROJECT

EMPLOYER :

PT PERTAMINA GEOTHERMAL ENERGY (PGE)

LOCATION :

ULUBELU, LAMPUNG

Issued for Review


Description

28/Sep/2015

PA

AR

NW

Date

Prepared

Checked

Approved

Consortium of Sumitomo Corporation and PT REKAYASA INDUSTRI

PIPING FABRICATION PROCEDURE


FOR WATER TREATMENT PACKAGE
Document No :

Rev No.

PO No :

UBL3&4-0-W1-IP-AA0-016-TCI-064

UBL3&4-E-5-W1-PO-WS5-064-R

(PT. TRACON INDUSTRI)

REVISION HISTORICAL SHEET


Revision

Date

28/Sep/2015

Description
Issued for Review

Page 2 of 8
Consortium of Sumitomo Corporation and PT. REKAYASA INDUSTRI

You might also like