Professional Documents
Culture Documents
Depth/Formation Notes MW Fit/Lot: Conductor
Depth/Formation Notes MW Fit/Lot: Conductor
Depth/Formation Notes MW Fit/Lot: Conductor
API: 42-177-33179
PERMIT: 766778
GL: 325'
KB+GL: 348.5'
SL X: 2555507.7 Y:661069.6
BHL X:2561611.2 Y:658430.5
SL SURVEY: ROBERT KELLY A-307
BHL SURVEY: DAVID C. TUMLINSON A-73
RRC: District 1
OBJ ZONE: EAGLEFORD
Depth/Formation
Notes
MW
Conductor:
16" set at 100'
2300'TVD
3150' TVD
Surface:
10 45.50# HCK-55 BTC 2300-3150 TVD' (Burst 3580 psi, Collapse 3130 psi)
Drift 9.794"
Midway:
5758' TVD
9.6 ppg
WBM
9.6 ppg
WBM
Intermediate Cement:
Top of tail @ 6500' MD Top of Lead @ 5500' MD (30% excess)
TBD based on contingency
Navarro:
6443' TVD
Pecan Gap:
7883' TVD
Production Cement:
Top of tail at 7500' MD. Top of Lead at 5500' MD (15% excess)
TBD based on contingency
Intermediate:
7 5/8 29.70# HCP 110 0-8930' MD, 8630' TVD (Burst 9470 psi, Collapse 7150 psi)
Drift: 6 BTC or LTC depending on availaiblity.
PBHL:
6- Lateral to 14,716' MD -9020' TVD 14,716' MD, 9020' TVD
6283' VS
Eagleford Target:
10+ ppg
OBM
PRODUCTION - 5 20# HCP 110 Tenaris XP BTC 0-8796' MD, 8620' TVD
5 x 4 x-over at approximately 60 degrees inc. 5 short joint at ~ 8000' MD for completions tie in.
4 13.5# MV95/HCP110 Tenaris XP BTC 8796'- 14,716' MD (Burst 12410 psi, Collapse 10680 psi)
Drift: 3.92
JPC 12/9/13
FIT/LOT