Power Interface Unit
Unmatched Advantages:
High upgradeability = Future proof investment
Most advanced field team = Best after-sales
service
2500 field engineers spread across all
circles
Easy serviceability & repairs
Highest MTBF of 70,000 hours in the industry
temperature.
Description
Standard Specification
Capacity
Range of 5 to 50 KVA
Mechanical
CNC Fabricated rack, using CRC Sheet duly powder coated, floor size 600x400 mm & height 1800 mm.
1.6 mm thick CRC sheet. Split type modular design.
IP Protection
IP 21
Safety
MTBF
All material & workmanship will be of professional quality to ensure MTBF requirement. The MTBF of the PIU
is more than 70000 hrs.
Compliance
Micro Controller
Time
Event Logs
For PC interface to adjust the critical data and unload the alarms, This Port will be used for configuration
of PFCs.
Energy
Data Transfer
Will be able to read the energy from Meter via 485 port
Will be able to measure the DG energy (Cumulative KWH & Hrs)
Will be able to measure the EB energy (Cumulative KWH & Hrs)
Will be able to store data of DC energy meter fetched from power plants of cell-sites of the network.
PIU will be equipped with suitable GPRS modem / GPRS DTU and able to process the data.
It will be able to connect via RS485 port to DC power plants for energy meter reading or with any
other specific equipment.
All above reading will be extendable to NOC / TOC through GPRS Modem.
Local storage of DC Energy will be available if meter goes faulty.
Controller will be able to store energy data / performance data and alarms / events for last 500 events.
Description
Standard Specification
Type
Power Rating
47-53 Hz
>97%
400 V/micro-sec
Response Time
<10 ms
Protections:
Voltage protection at
incoming power input
Voltage protection at
MODULE
Insulation
<10 NF
Input/Output isolation
6KV
Winding
In-rush Current
Temperature
(-5 to 55 deg)
Humidity
RH 95% (max.)
Smoke Detector:
Blackout delay
DG cooling time
5 minutes
DG start attempts
DG Lock time
After three very short mains restoration 10-10-20 minutes, DG will run for
2hrs (settable) continuously.
Load Distribution
6A
DG set measurements
Mains measurements
Battery measurements
LED Indications:
Delays:
DG on load
Standard setting
Dual DG Logic
(Optional)
After set time of 5 mins ( settable ) the PIU will sense the
load and if it finds the load to
be 80% ( settable ) of the lower
DG capacity it will start the
lower DG and switch off the
bigger DG
ACME Tele Power Limited, Plot No 2, Sector 34, EHTP, Gurgaon - 122001, Haryana, India
Phone : +91-124-4817000, +91-124-4817777, Fax: +91-124-4817111
Email: info@acme.in, Website: www.acmetelepower.com