New Candidates Observation Sheets
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Observations
Hazards and consequences
Control measures
Timescale
Close gates
Arrange site security
Immediate
1 Week
Ongoing monitoring
Every week
Immediate
See item..
Immediate
Immediate
Ongoing
1 week
1 week
Management Issues
NATIONAL CERTIFICATE
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Control measures
Timescale
Documentation
9. No test certificates for the digger,
dumper and telehandler were available
on site, however I was informed they
are kept in headquarters.
1 week
Ongoing
Good practice
Good practice
Welfare
13. Toilet facilities were by way of a
single chemical toilet, there was no hot
running water available on site. (CDM)
1 week
1 week
Commendable
Commendable
Commendable
Immediate
NATIONAL CERTIFICATE
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Control measures
Timescale
Scaffolds
19. Some guard rails were missing and
some toe boards were missing. (see
picture 2, 3) (WAH Regs)
Immediate
Immediate
Immediate
Immediate
Immediate
Scaffold
should
be
inspected
immediately. Provide additional scaffold
box to provide additional support to skip,
with hoarding around base to keep public
out. Ensure skip has netting
Immediate
1 week
Ladders
Immediate
NATIONAL CERTIFICATE
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Control measures
Timescale
Immediate
Immediate
Immediate
Immediate
1 month
Roof Work
Excavations
29. No barriers around drainage
excavation. (CDM) (see picture 35,36)
Plant and Equipment
30. No maintenance records were
available for any plant. (PUWER)
Power and Hand Tools
31. Low voltage equipment was in use
throughout the site
Commendable
1 month
Immediate
Immediate
1 week
NATIONAL CERTIFICATE
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Control measures
Timescale
Hazardous Substances
36. COSHH assessments had been
done and available in Site Office. All
hazardous materials were stored
separately. (COSHH Regs)
Commendable
Manual Handling
37. Risk of back, hand and arm injury
doing drainage, setting manhole rings
and cover slabs. (see picture 35,36)
(Manual Handling Regs)
Immediate
Commendable
1 week
Immediate
NATIONAL CERTIFICATE
IN CONSTRUCTION HEALTH
AND SAFETY
Candidates observation
sheet
Control measures
Immediate and longer-term actions
Timescale