Fire Risk Assessment-Rev 001
Fire Risk Assessment-Rev 001
4/1
Location : Khalifa City ZONE 4/1
Dated:
24-02-2015
Document #
RA/F/02/15
RISK ASSESMENT FOR:
FIRE SH&E RISK ASSESSMENT
S/N
RISK
Risk Rating
CONTROL MEASURES
Residual Risk
Responsibl
HAZARD
e person
01
Increased risk
of fire starting
Increased risk
of fire starting
02
Loss/Damage
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
16
16
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
Storekeeper
Administration
officer.
Page | 1 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE
4/1
Location : Khalifa City ZONE 4/1
Dated:
24-02-2015
Document #
RA/F/02/15
RISK ASSESMENT FOR:
FIRE SH&E RISK ASSESSMENT
S/N
RISK
Risk Rating
CONTROL MEASURES
Residual Risk
Responsibl
HAZARD
e person
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
Delayed
evacuation
16
Electrical
Engineer/Admi
nistration
officer/EHSE.
04
Personal
Injury/Delay in
evacuation
16
Administrati
on Officer
05
Confusion and
delayed in
evacuation
20
Office
Engineer
/EHSE
06
Arson
Injury/Loss to
16
Administrati
Page | 2 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE
4/1
Location : Khalifa City ZONE 4/1
Dated:
24-02-2015
Document #
RA/F/02/15
RISK ASSESMENT FOR:
FIRE SH&E RISK ASSESSMENT
S/N
RISK
Risk Rating
CONTROL MEASURES
Residual Risk
Responsibl
HAZARD
e person
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
property
07
Failure to
mitigate small
fires resulting
to further loss
20
08
Injury/Loss of
property
16
09
Spread of Fire
Injury/Loss of
property
16
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
on Officer
PM/HSE
Electrical
Engineer
Administrati
on Officer
Page | 3 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE
4/1
Location : Khalifa City ZONE 4/1
Dated:
24-02-2015
Document #
RA/F/02/15
RISK ASSESMENT FOR:
FIRE SH&E RISK ASSESSMENT
S/N
RISK
Risk Rating
CONTROL MEASURES
Residual Risk
Responsibl
HAZARD
e person
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
Proba Sev
bility erit
(P)
y
(S)
Ratin
g (P)
x (S)
Severity
RISK MATRIX
5
4
3
0
0
0
5
4
3
10
8
6
15
12
9
20
16
12
25
20
15
Probability
Rating 0 = Zero to very low
Rating 1 = Very unlikely
10
Rating 2 = Unlikely
Rating 3 = Likely
Probability
Acceptable
Severity
Rating 0 =
Rating 0 =
illness
Rating 1 =
illness
Rating 2 =
illness
Rating 3 =
illness
Rating 4 =
injury
Further
review
No injury or illness
First aid injury or
Minor injury or
Lost Time injury or
Major injury or
Risk
=Probabil
ity
X
severit
y
Fatality / Disability
Unaccepta
ble
Prepared by:
Date:
Reviewed by:
Approved by:
EHS Engineer
Project Manager:
Page | 4 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE
4/1
Location : Khalifa City ZONE 4/1
Dated:
24-02-2015
Document #
RA/F/02/15
RISK ASSESMENT FOR:
FIRE SH&E RISK ASSESSMENT
S/N
RISK
Risk Rating
CONTROL MEASURES
Residual Risk
Responsibl
HAZARD
e person
Proba Sev
bility erit
(P)
y
(S)
Consultant Approval:
Date:
Ratin
g (P)
x (S)
Proba Sev
bility erit
(P)
y
(S)
Approval:
YES
Ratin
g (P)
x (S)
Resident Engineer:
NO
Page | 5 of 4