Bill of Quantities: Kalipayan Drainage System 217.00
Bill of Quantities: Kalipayan Drainage System 217.00
Bill of Quantities: Kalipayan Drainage System 217.00
PROJECT
Drainage
LOCATION
Kalipayan
TYPES OF STRUCTURE :
Drainage System
FLOOR AREA
217.00
ITEM
NO.
I.
II.
III.
DESCRIPTION
ln m
UNIT
QTY
Unit price
Amount
GENERAL REQUIREMENTS
1
Mobilization / Demobilization
lot
1.00
Temporary Facilities
lot
1.00
Safety Requirements
lot
1.00
lot
1.00
lot
1.00
lot
1.00
Construction Billboard
lot
1.00
Excavation
Gravel Bedding
MASONRY WORKS
A.
1.00
lot
lot
1.00
cu.m.
88.00
cum
20.00
lot
###
1.00
sq m
Material Cost
CHB 4"
Pcs
Cement
bags
70.00
Sand ,washed
cu.m
4.00
Gravel 3/4"
cu.m
8.00
3,300.00
Labor Cost
PLASTERING WORKS
A.
###
sq m
Material Cost
Cement
bags
70.00
Sand ,washed
cu.m
4.00
Labor Cost
CONCRETE WORKS
A.
35.00 cu m
Material Cost
Cement
bags
350.00
Sand ,washed
cu.m
17.00
Gravel 3/4"
cu.m
35.00
Labor Cost
LS
1.00
Equipment Rental
1-Concrete Mixer
days
15.00
Page No. 1
ITEM
NO.
DESCRIPTION
1-Concrete Vibrator
UNIT
days
QTY
Unit price
Amount
15.00
LS
1.00
REINFORCING STEEL
A.
kgs.
3,925.00
Deformed bar
kgs.
3,925.00
Tie Wire
kgs.
40.00
days
8.00
1-Concrete Vibrator
days
8.00
Lot
1.00
coco lumber
Lot
300.00
CWN Assorted
kg.
20.00
Material Cost
Labor Cost
Equipment Rental
FORMWORKS
A.
Material Cost
Labor Cost
Page No. 2