Agenda:

Feed water area, CCW module and Steam line interface with HRSG.
LP Steam line interface from bottom. Drain concept from HRSG to be
reviewed. As per HRSG the drain from LP will go to condenser flash box which
is not acceptable.
Bypass station to be updated to fit as per MD0 of bypass valves.
Thickness of ST foundation from SAID required. Presently the main steam
lines are clash with ST internal piping. Plan B is to move the ST and ST top
level platform by UP 1-1.5 m.
Blow down tank module.
Access ways and escape route are modeled in PDMS.
Fuel oil and Fuel gas module. Proposal as per Fredy AEBISCHER.
Fuel Oil NOx is clashing with Plant area. GT to be done.
Need MD0 for equipment to generate modules.
PID for Sampling, MCW, CCW and Fuel oil are not available from process.
As per todays PID status Piping are in PDMS model except for the following :
o 22 No of drains per BDT to be routed. Space reservation is available.
o Where interfaces are not clear is marked in PID.
o FW lines interfaces are not clear with HRSG.
o For HP and HRH Exit DSH should be placed in the scope of HRSG.
o Concept for Container piping needs to be done.