NOTES:

FOR ABUTMENT STONE MASONRY:

ABUTMENT "B"
END OF BRIDGE
BACK OF BACKWALL
K. 1465 + 076.00

1. THE BED FOR STONE MASONRY SHALL BE EXCAVATED TO THE REQUIRED DEPTHS AND
PROPERLY COMPACTED, TRIMMED, AND SHAPED.
2. THE STONE MASONRY SHALL BE FOUNDED IN A TOE TRENCH DUG BELOW THE DEPTH OF
SCOUR AS SHOWN ON PLANS OR AS ORDERED BY THE ENGINEER. THE TOE TRENCH
SHALL BE FILLED WITH STONE OF THE SAME CLASS AS THAT SPECIFIED FOR THE STONE
MASONRY.
3. STONES SHALL BE PLACED BY HAND OR INDIVIDUALLY BY MACHINES. THEY SHALL BE
LAID WITH CLOSE, BROKEN JOINTS, AND SHALL BE FIRMLY BEDDED INTO THE SLOPE
AND AGAINST THE ADJOINING STONES. EACH STONE SHALL BE LAID WITH EACH
ADJACENT STONE. THE STONE MASONRY SHALL BE THOROUGHLY RAMMED INTO PLACE
AS CONSTRUCTION PROGRESSES AND FINISHED SURFACE SHALL PRESENT AN EVEN,
TIGHT SURFACE, INTERSTICES BETWEEN STONES SHALL BE FILLED WITH SMALL BROKEN
FRAGMENTS FIRMLY RAMMED INTO PLACE.

TO BUKIDNON
FGL / Top of Bridge, Elevation = 97.895 m.
Top of Girder, Elevation = 97.598 m.

4. SPACES BETWEEN THE STONES SHALL THEN BE FILLED WITH CEMENT MORTAR AS
SPECIFIED IN SUBSECTION 506 2.2, MORTAR (DPWH STANDARD SPECS.) SUFFICIENT
MORTAR SHALL BE USED TO COMPLETELY FILL ALL VOIDS, EXCEPT THAT THE FACE
SURFACE OF THE STONES SHALL BE LEFT EXPOSED.

Bottom of Girder, Elevation =95.896 m.


1.0 x 1.0 x 2.0 m
GABIONS

M.E.F.L. = 95.013 m.
STONE MASONRY
SIDE DRAIN
(SEE DETAILS)
1700 Width x 300 Thk.

1000

Berm,
Elevation = 93.396 m.

3000

RUBBLE
CONCRETE
(s = 1:1)

FOR RUBBLE CONCRETE:

1
1

30

RUBBLE
CONCRETE
(s = 1:1)

STONE MASONRY
SIDE DRAIN
(SEE DETAILS)

RM

Berm,
Elevation = 90.396 m.

A. ALL CONCRETE SHOULD BE CLASS "B" (1 : 2.5 : 5) MIX.


B. EMBEDDED BOULDERS FOR THE FACING SHOULD NOT BE LESS THAN THIRTY (30mm.)
APART AND SHALL BE AT LEAST THIRTY (30mm.) BELOW THE OUTSIDE SURFACE OF THE
CONCRETE

1000
3000

BE

RM

BE

RUBBLE
CONCRETE
(s = 1:1)

30

EMBANKMENT
Bottom of Footing,

300

varies

Berm,
Elevation = 87.396 m. 300
1

C. ONE - MAN BOULDER (200 - 300 mm. IN DIA.) SHALL BE USED FOR THE FACING AND SHALL
BE CAREFULLY HAND-LAID AND EMBEDDED IN CONCRETE.

Elevation = 88.046 m.

LEAN CONCRETE
1000

FOR GABIONS:

Bottom of Side Drain, Elevation = 86.046 m.

1000

1. BODY WIRE DIAMETER


2. SELVEDGE WIRE DIAMETER
3. TENSILE STRENGTH
4. WEIGHT OF ZINC COATING
5. ELONGATION: 200mm GAGE-LENGTH
6. TYING & CONNECTING WIRE DIAMETER
7. ROCK FILL
8. DENSITY OF FILLED GABIONS
9. WIRE MESH
10. WIRE SHOULD BE DOUBLE TWISTED

Bottom of Toe,
Elevation = 85.019 m.

ABUTMENT "B"
END OF BRIDGE
BACK OF BACKWALL
K. 1465 + 076.00

1000 600
HP 14x117
H-PILES
F allow = 750 kN

TO BUKIDNON

2 ABUT. "B" SECTION

EDGE OF WINGWALL

300

: 2.7mm (MIN)
: 3.40mm (MIN)
: 413.70 - 586.10 MPa
: 244 g/sq. m. (MIN) OF COATED WIRE)
: 12% (MIN)
: 2.20mm (MIN)
: 1,400 kg/cu. m. (MIN)
: 8x10cm

FOR MATTRESSES:
1. BODY WIRE DIAMETER
2. SELVEDGE WIRE DIAMETER
3. TENSILE STRENGTH
4. WEIGHT OF ZINC COATING
5. ELONGATION: 200mm GAGE-LENGTH
6. TYING & CONNECTING WIRE DIAMETER

1:100

SCALE

: 2.7mm (MIN)
: 3.40mm (MIN)
: 413.70 - 586.10 MPa
: 244 g/sq. m. (MIN) OF COATED WIRE)
: 12% (MIN)
: 2.20mm (MIN)

3a
STONE MASONRY

RM
BE

300

1700

1000

1.0 x 1.0 x 2.0 m


GABIONS

VARIES

EXISTING
GROUND
LEVEL

EXISTING
GROUND

STONE MASONRY
SIDE DRAIN
(SEE DETAILS)
1700 Width x 300 Thk.

1.00

300

3b

RUBBLE
CONCRETE
(s = 1:1)

END OF WINGWALL

100

RUBBLE
CONCRETE
(s = 1:1)

H = Varies

H = Varies

RM

BE

RUBBLE
CONCRETE
(s = 1:1)

1000

ROADWAY WIDTH = 7320

5. GROUT SHALL BE PLACED FROM BOTTOM TO TOP OF THE SURFACE SWEPT WITH A STIFF
BROOM. AFTER GROUTING IS COMPLETED, THE SURFACE SHALL BE CURED AS
SPECIFIED IN ITEM 405, STRUCTURAL CONCRETE FOR A PERIOD OF AT LEAST THREE
DAYS.

RUBBLE CONCRETE, 300mm THK.

3b

SECTION
1:16

SCALE

500
1700

1 ABUT. "B" PLAN


SCALE

3a

ABUT. "B" SIDE DRAIN ELEV.


SCALE

SECTION
SCALE

1:30

1:30

1:100

ABUTMENT "B" SLOPE PROTECTION & SIDE DRAIN

PROJECT / LOCATION :

SHEET CONTENTS :

SURVEYED :

DRAWN & DESIGNED :

CHECKED :

SUBMITTED :

RECOMMENDING APPROVAL :

APPROVED :

SET NO. :

SHEET NO. :

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION X
OFFICE OF THE DISTRICT ENGINEER
BUKIDNON THIRD DISTRICT ENGINEERING OFFICE
DICKLUM, MANOLO FORTICH, BUKIDNON

CONSTRUCTION OF NEW LIBONA PCPS BRIDGE ALONG


JCT. SH - MANOLO FORTICH - LIBONA - INDAHAG ROAD
(COMPLETION)
LIBONA, BUKIDNON

CRISANTO P. BAGARES, JR.


ENGINEER II

ABUTMENT SLOPE PROTECTION AND SIDEDRAIN

HADJE F. SALARES
INSTRUMENT MAN

NOEL G. ALUAG

RYAN CAESAR B. FERNANDEZ

ENGINEER II

ENGINEER II

RENIE S. DIGAMON
CHIEF, PLANNING AND DESIGN SECTION

REYNALDO Z. SAGUN
ASSISTANT DISTRICT ENGINEER

DENISE MARIA M. AYAG


DISTRICT ENGINEER

PDS
A-1
2015

14
02 22