ITP Easdf 001

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

H : Hold Point

INSPECTION AND TEST PLAN

~egend

Item
No.

Package No. : Electrical

ITP-E-001

PAGE

2 OF 2

: Witness Point

R : Review

Construction

ITP NO.

Component System : Conduit


Hold/Witness Point

Inspection & Test Items

Code/Drawing

Verifying of Material

Subcon.

Doosan
QC

CEP

Inspection
Report

EIR-001

Support Installation

EIR-001

Conduit Installation

EIR-001

[Cirebon Coal Fired Power Plant]

WORK PROCEDURE

CONDUIT

- Approved Drawing

- Standard Drawing
- Cable Schedule
- Approved Drawing

- Standard Drawing

Subcontractor QC

CIREBON COAL FIRED POWER PLANT