PLUMBING
25mmm nominal bore class B galvanised mild steel pipe to B.S 1387 with
screwed sockets joints in the running length fixed with metal clips, plugged and
screwed to brickwork, concrete or stonework at 1.20m
DESCRIPTION :
UNIT :
TYPE :
DATA
Material
25mm nominal pipe-Class B
Socket
Metal clips
=
=
=
RM52.00 /6m
RM1.50 /no
RM0.50 /no
Labour
Skilled labour
General labour
=
=
RM78.00 /day
RM55.00 /day
CALCULATION
RM
RM
RM
A. MATERIAL COST
i) Pipe 25mm diameter
ii) Jointing
= 1 socket/6m x
/no
6.00m
1.20m
= 6 nos /6m x
= 5 + 1 = 6nos
/no
Add :
5 %wastage
6m
B. LABOUR COST
i) Labour cost for jointing and fixing
1 general labour x
8 hrs
1 Plumber x
8 hrs
notes QSD231/syhidi/2011