Professional Documents
Culture Documents
Bhs Hospital
Bhs Hospital
DISCUSSION
Ronnie Rivany
Health & Hospital Economist
PROSPEK
Alternatif
Lokasi
Tanah
Bangunan Harga
Status
Depok
2570 m2
3600 m2
Jual ?
Depok
20.000 m2
J.O
Jagakarsa
8000 m2
6000 m2
Jual
J.O
BSD
GORO
Pasar Minggu
RS Pondok
Cabe
4000 m2
Wisma Atlit
600 m2
1200 m2
90 - 180
Jual
Jual/
J.O
2300 m2
Jual/JO
BOT
MEDICA BSD
HOSPITAL
costing analysis 2006 - 2007
TAMPAK
existing
(1)
TAMPAK
existing
(1)
KONSEP DASAR
Ronnie Rivany
Health & Hospital Economist
PEMILIK
TIM MANAJEMEN
PROYEK
STUDI
KELAYAKAN
AMDAL
MASTER
PLAN
PERENCANA /
Detail Eng.Design
Bussiness
Plan
KONSTRUKSI
UKL / UPL
INSTALASI
ALAT MEDIS
MANAJEMEN
KONSTRUKSI
OPERASIONAL
RS
ALAT
NON MEDIS
KONSULTAN
MANAJEMEN RS
TIM
MANAJEMEN RS
FEASIBILITY STUDY
ANALYSIS OF EXTERNAL ASPECT
DEMOGRAPHICS
GEOGRAPHICS
COMPETITORetc
No of beds, no of specialists
Total amount in $, Budgeting
Break Even Point ????
Feasible or not ??????
10
Expenses Cummulatif
15
20
saldo
25
Saldo Cummulatif
30
JENIS LAYANAN
LAYANAN PENUNJANG
PATIENT FLOW
ZONING
BIRD EYE VIEW
MODEL ON SCALE 1:100
A POLIKLINIK (3LT)
B UGD
C CAF
D RADIOLOGI, FARMASI, LAB, INSTALASI
PENUNJANG DIAGNOSTIK, BANK DARAH
E REKAM MEDIS
F ADMINISTRASI
G BEDAH SENTRAL
H R KEBIDANAN DAN KANDUNGAN
I HEMODIALISA, CSSD, REHAB MEDIK, ANESTESI,
PATOLOGI
( 2LT)
J ICCU
C
B A
K ICU
(2 LT)
3
3
V JENAZAH
W TPS
X MESJID
Y GSG
Z KANTIN
1 PERPUSTAKAAN
2 KELAS ( 2 LT )
3 RUMAH DOKTER
4 ASRAMA ( 3 LT )
2 1
2
2
H
K
L
M
T S
R Q
U
V
J
N
E
D
F
O P
O
MATERIAL SPECIFICATION
PREPARATION ON BIDDING
ADMINISTRATION
TAMPAK MUKA
INTERIOR LORONG
AMDAL STUDY
WATER & WASTE TREATMENT
ANALYSIS
ENVIRONMENT ANALYSIS
HIDROGRAPHY & LITHOGRAPHY
STRUCTURE ANALYSIS
SOCIO-CULTURE ANALYSIS
BUILDING CONSTRUCTION
OUT PATIENS
POLYCLINIC
EMERGENCY
ONEDAY CARE/SURGERY
FARMACYS
BACK OFFICE/ADMINISTRATION
LAN/PAPERLESS INFORMATION SYSTEM
IN PATIENT
SUPPORTING SERVICES
MRI
CAT-SCANN
3D-COLOR USG
SPORT/RECREATION FACILITIES
HOSPITAL MALL
FLOURISH SHOPS
BOOKSTORE
DRUGSTORE
RESTO / CAFE
SPA
DUTY FREE SHOPS
MANAGEMENT CONSTRUCTION
PROGRAM PROJECT DEVELOPMENT
QUANTITY & QUALITY ASSURANCE
BUILDING CONSTRUCTION
EVALUATION
EQUIPMENT INSTALATION
EVALUATION
PROGRAM / BUILDING
CONSTRUCTION MONITORING
PROGRESS REPORT
EQUIPMENT INSTALLATION
EQUIPMENT
MEDICAL
NON MEDICAL
HOSPITAL MANAGEMENT
STRATEGIC MANAGEMENT
JOB DESC ANALYSIS
SISTEM OPERATING PROCEDURE
MANPOWER RECRUITMENT
MANPOWER TRAINING
LOGISTIC MANAGEMENT
HUMAN RESOURCES MANAGEMENT
MANAGEMENT INFORMATION SYSTEM
NURSING MANAGEMENT
FINANCING MANAGEMENT
PRICING
CAPITATION SYSTEM
PUBLIC-PRIVATE MIX
SOFT OPENING
TRIAL AND ERROR
MONITORING
CONTROLLING
EVALUATION
CORRECTING
Costing Analysis
Data Up-date 2006/7
Activities Pathway
Unit cost assessment of each activities
Total Cost
Suggest best policy options according to the result
Skenario Kerjasama
Alternatif 1 :
Alternatif 2 :
Alternatif 3
Mengambil alih sisa kebutuhan
dana sebesar Rp 160 m dengan
cara konversi terhadap proporsi
saham
Unit cost
BIAYA
Up-date
FS, MP, AMDAL
Paket
Rp
1.250.000.000
Up-date Detail
Engineering Design +
Interior Design
Paket
Rp
1.750.000.000
Up-date Konstruksi /
finishing
60 % x 21.500 m2 @ 4 jt
Rp 51,600.000.000
Mekanikal+Elektrikal
20% x 21.500 m2 @ 4 jt
Rp
Current assets
Tanah + Bangunan
17.200.000.000
Rp 40..000.000.000 (?)
Manajemen Konstruksi
Paket
Rp
Paket
Rp 51.600.000.000
750.000.000
Tim Konsultan
Hospital Management
28 bln @ Rp 250 jt
Rp
7.000.000.000
Soft opening.
12 bln @ Rp 250 jt
Rp
3.000.000.000
Operasional RS /
Modal kerja 5 thn
5 x 12 bln @ Rp 400 jt
Rp
24.000.000.000
TOTA L
TOTAL BIAYA
Rp 198.150.000.000
Rp200 m ( + dlll)
Unit cost
BIAYA
Paket
(1 % Total projek )
Rp
1.156.100.000
Up-date Detail
Engineering Design +
Interior Design
Paket
(1,5% up-date
konstruksi)
Rp
450.000.000
Up-date Konstruksi /
finishing
70 % x 5000 m2 @ 6 jt
Rp 21.000.000.000
Mekanikal+Elektrikal
30% x 5000 m2 @ 6 jt
Rp
Current assets
Tanah + Bangunan
9,000.000.000
Rp 14.000.000.000 (?)
Manajemen Konstruksi
Paket Perbandingan
1:3 konstruksi
Rp
360.000.000
Rp 88.000.000.000(***)
Tim Konsultan
Hospital Management
28 bln @ Rp 100 jt
Rp
2.800.000.000
Soft opening.
12 bln @ Rp 250 jt
Rp
3.000.000.000
Operasional RS /
Modal kerja 5 thn
5 x 12 bln @ Rp 300 jt
Rp 18.000.000.000
TOTA L
TOTAL BIAYA
Rp 137.766.000.000
Rp138 m ( + dlll)
3 BLN
4 BLN
12 BLN
450 JT
Up-date Konstruksi /
finishing
21 M
Mekanikal+Elektrikal
9 M
14 M
Manajemen Konstruksi
360 JT
88 M
Tim Konsultan
Hospital Management
2,8 M
Soft opening.
3 M
Operasional RS /
Modal kerja 5 thn
TOTA L
60 BLN
1,15 M
Current assets
Tanah + Bangunan
12 BLN
18 M
15,15 M
450 JT
118,360 M
5,8 M
18 M
THINGS TO DO
1. TIM MANAJEMEN PROYEK
a) INVESTOR
b) EXPERTISE / TIM
KONSULTAN
c) SARANA - PRASARANA
2. LOI - NEGOSIASI - MOU
3. AKTE NOTARIS
4. POA
5. Action
Manajemen Proyek RS
INVESTOR
???????
TIM
KONSULTAN
MEDIATOR