Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

0-0660-00-0000

TRANSMITTAL
SHEET

PROJECT NAME

NO:

MONAS

TS/EII/MONASPROJECT/I/002

PT. ENCONA INTI INDUSTRI

PROJECT NO

BPH MIGAS Building, Ground Floor


Jalan. Kapten P. Tendean Kav 28, Jakarta 12710
Ph. 021-527 6711-12, Facs. 021-527 6713
To : Bpk Agung. S
Dept Quality Assurance Quality Control JIND

Date: April, 8th 2014

From: M. Ridho Fathan


QC EII
ITEMS:
( )

LETTER

( ) SPECIFICATIONS

( x ) RFI REPORT

( )

MINUTES OF MEETING

( ) CALCULATION SHEET

( ) MEMORANDUM

( )

DRAWINGS

( ) BILL OF QUANTITY

( ) PROPOSAL

Dear Sir,
Attached RFI Admin Building Area Report to be proposed and submited

RFI Admin Building Area


Administation Building, Padestal As A-D
Administation Building, Pilecap As B/1-2, As C/1-2
Administation Building, Pilecap As D/1-5, As E/1-5
Administation Building, Pilecap As B-C/3-5
Administation Building, Pilecap As A/1-5

Thanks for your Attention


Regards,
M. Ridho. F
FROM
SIGNATURE

M. Ridho Fathan

RECEIVED BY
SIGNATURE

You might also like