WELL HISTORY

ZAMRUD (N1-E1-62) # 03
DATA MEKANIS
Koordinat
Cluster
Type
RT/GL
TD
PBTD
Casing

:
:
:
:
:
:
:

RIWAYAT SUMUR
Di bor
Rig

: 18 26 Februari 1976
: Rig # 56

N : 118,753.58 M E : 490,476.93 M
43 / 30.16
4377
3420
Surf. 611

Prod. 3464

18 Febr. 1976
Moved in from Buatan Strat #1. Rigged up. Drilled Rat & Mouse hole. Spudded in @ 00:00 hrs, 18 Febr. 1976.
Drilled 13-3/4" surface hole to 618'. POH. W.O Helicopter to haul cement from S.A. RIH, circulated, POH. Rigged and
ran 18 jts. 10-3/4" 40.5# J-55 R-2 ST&C Casing. F.S @ 611'. Used 3 centralizers . Circulated and cemented w/500 sxs.
"G + 2% CaCl2 in last 100 sxs. Full circulation, no cement to surface. WOC. N/U BOPE.
19 Febr. 1976
Tested BR w/800 psi, OK. RIH, tested PR w/800 psi and Hydril w/500 psi, OK. Drilled out plug, cement, shoe and 95/8" hole to 2287'. POH. Repaired swivel. P/U bit #3. RIH. Drilled ahead 2287' - 2657'.
20 Febr. 1976
Drilled 2657' - 3462'. Trip for bit #4. Drilled 3462' - 3665'.
21 Febr. 1976
Drilled 3665' - 4162'. Trip for bit #5. Reamed 4100' - 4162'. Drilled 4162' - 4221 Circulated, POH to log.
22 Febr. 1976
Logging: IES 4231' - 611'; R/D Schlumberger . RIH to shoe. W.O. drill pipe. Drilled ahead 4221' - 4366'. Circulated,
POH to log.
23 Febr. 1976
Logging: IES 4366' - 4200' (Schl. TD @ 4377'), FDC-GR 1900', CST #1 Shot 30, Rec. 28; CST #2 Shot 7, Rec. 7,
HDT 4377 - 611'. Picked up 10 jts 3-1/2 tubing, RIH w/OE to 3644' . Circulated and equalized 60 sxs. "G". Average
slurry weight 118 pcf . Pulled to 290' and circulated. Laid down 3-1/2 tubing. RIH to 3452 cemented out to 3492'.
24 Febr. 1976
Circulated, conditioned mud, POH and laid down pipe. Rigged and ran 105 jts. 7" 23# J-55 R-2 ST&C casing. GS @
3464', FC @ 3421' Used 10 centralizers and 84 scratchers. Pumped 20 BW + 20 gals. CW-7 prior to cementing.
Cemented w/200 sxs."G Average slurry weight 114 - 117 psi. Displaced w/135 BW and bumped plug w/1400 psi. Float
held OK. Full circulation and rotated pipe freely. N/U BOPE, tested BR w/1000 psi, OK. Spooled sand line. Schl. ran
GR-CCL 3400' - 3200'. Had tool failed. P.U packer, RIH, tested PR & tydril w/800 psi, OK.
25 Febr. 1976
RIH w/packer and set @ 3246'. Tested packer, OK. Swabbed to 1500' Perforated 3315' - 3327' (12') w/4 unijets per foot
thru tubing perforators. Swabbing. Recovered 100 bbls of formation fluid. Salinity: 400 ppm NaCl. Fluid level 500' and
swab depth 1000'. Reversed hole w/mud. POH. Ran junk basket to 3320'. Set Model K Bridge Plug @ 3312'. RIH,
set packer @ 3215'. Tested w/800 psi, OK. Swabbed to 1500', checked fluid level 30 minutes.
26 Febr. 1976
Schlumberger perforated interval: 3286' - 3298' (12') w/4 unijets per foot thru tubing perforators. Had strong blow. Fluid
to surface in 25 minutes. Flowing well. 85 BPH, 99 % oil, 1% BS&W. 38% API @ 60 API. Reversed out. Released
packer, POH. RIH w/OE tubing to 3021 and equalized 40 sxs "G". Estimated TOC @ 2748'. POH to 2649, reversed out,
laid down excess. Landed 78 jts. 3-1/2" tubing @ 2468. N/D BOPE and installed Well Head.

/var/www/apps/conversion/tmp/scratch_5/300795378.docx

-1-

Released Rig @ 24:00 hrs, 26 February 1976.