Progress Curve 12-28, 15.00hrs
Progress Curve 12-28, 15.00hrs
(ANABEEB)
SA RT, DHT REACTORS CATALYST CHANGE OUT JOB, DEC 2013
Daily Progress Report - Cut off time: 28/12/2013 15:00hrs
Plant
RT J88
28-Dec-13
Start
Finish
Start
Finish
Planned
Actual
Variance
06/Dec/13 02:00
30/Dec/13 02:00
06/Dec/13 15:00
28/Dec/13 15:00
92.91
100.00
7.09
100.00
10.0
100
93.00
100.00
Daily Planned
9.0
8.0
89.31
79.00
85.91
75.59
Cum. Actual
78.89
66.36
75.49
68.39
57.38
53.83
50.09
5.0
70
71.84
61.53
6.0
80
82.41
72.10
69.20
7.0
90
92.91
82.58
Cum.Planned
Daily %age
96.50
87.00
Daily Actual
65.15
60
61.22
57.32
50
53.83
49.83
45.99
36.00
39.81
4.0
3.0
45.83
41.87
39.73
40
41.83
35.73
30.50
Cumm. %age
30
30.13
22.48
2.0
20
22.48
15.60
15.34
1.0
2.20
0.0
10
4.508.7010.17
6.81
2.20
6-Dec
7-Dec
8-Dec
9-Dec
10-Dec
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
22-Dec
23-Dec
24-Dec
25-Dec
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
Daily Planned
2.20
4.61
3.36
5.17
7.14
7.65
5.60
4.00
2.10
4.00
4.00
4.00
3.49
3.90
3.93
3.24
3.45
3.65
3.40
3.52
3.50
3.40
3.60
3.59
3.50
Daily Actual
2.20
2.30
4.20
6.90
6.88
8.02
5.50
3.81
2.06
4.12
4.10
3.74
3.55
4.15
4.83
2.84
2.90
3.49
3.41
3.58
4.42
6.00
7.00
Cum.Planned
2.20
6.81
10.17
15.34
22.48
30.13
35.73
39.73
41.83
45.83
49.83
53.83
57.32
61.22
65.15
68.39
71.84
75.49
78.89
82.41
85.91
89.31
92.91
96.50
100.00
Cum. Actual
2.20
4.50
8.70
15.60
22.48
30.50
36.00
39.81
41.87
45.99
50.09
53.83
57.38
61.53
66.36
69.20
72.10
75.59
79.00
82.58
87.00
93.00
100.00
Date
Areas of Concern, if any:
Both Reactors top elbow bolts are unable to remove by torque/tension, C-0101 Bolts removed by Cutting on 12/7/13 at 22:00hrs and C-0201 Bolts are removal by cutting
completed on 12/08/13 at 09:30hrs.
C-0201 - Catalyst was stuck-up because of solid form. It took 03hrs (13:30 to 16:30) for loosening; C-0101: One side catalyst stuck-up and cleared within 2hrs (13:30hrs to
15:30hrs) on 09/12/2013. Reactors Top & Bottom beds catalyst unloading, Thermocouple replacement and Catalyst Loading completed
C-0101 & C-0201: Reactors Box-up, deblinding and torquing completed 100%.
27/Dec/13
Manpower at site:
Cumm. Manpowr
Total Manpower
DAY
NIGHT
108
91
199
DAY
NIGHT
30480
22692
2388
53172
Anabeeb site
SA RT Dec TA 2013
12/28/2013
Prepared By:
Mohammed Haneefa
Reviewed By:
Mohammed Feroze
Project Planner
Project In-charge