ELECTRICAL WORKSHOP
(CMELR 110)
S1.No
LIST OF EXPERIMENTS
Page No.
Godown wiring
Staircase wiring
11
Hospital wiring
13
15
17
10
20
11
22
GODOWN WIRING
AIM
To prepare an estimate and wire up the circuit to control two lamps from two
switches such that one lamp is ON at a time.
TOOLS REQUIRED
Draw the layout diagram in wooden board provided for wiring. 20cm PVC
wiring pipe is clamped with saddle as per diagram. Junction box is used to connect
the pipes. Wires are drawn through pipes and connections are done as per connection
diagram. Fix the lamp holder. Check switching operation after connecting to ac
supply.
RESULT
2
SWITCHIG OPERATION
LAYOUT
20
20
20
20
20
S1
OFF
ON
ON
OFF
LI
DARK
BRIGHT
DARK
DARK
S2
C-1
C-1
C-2
C-2
20
CONNECTION DIAGRAM
L2
Si
S2
L2
DARK
DARK
BRIGHT
DARK
AIM
To prepare a wiring such that one lamp is controlled by one switch with one
independent plug point and to prepare estimate for the same.
TOOLS REQUIRED
Draw the layout diagram in wooden board . PVC channels are fixed in
respective positions. Tees are used to connect these channels. Wires are drawn
through the channel and connections are done as per connection diagram. Fix the
lamp holder. Channels are closed and tees are fixed at junctions. Verify switching
operation after connecting to ac supply.
RESULT
A wiring is set up such that one lamp is controlled by one switch with one
independent plug point and an estimation is prepared for the same.
QUESTION
Draw a neat diagram of a standard wire guage and explain how it is used to
measure the size of a wire?
LAYOUT
LI)
20
2 CI
20
PD
Si
CONNECTION DIAGRAM
230V 50Hz IN
2.---1C/><T
E
S1
To prepare an estimation and wire up a circuit for mercury vapour lamp and CFL.
TOOLS REQUIRED
Draw the layout diagram in wooden board. Casing and caping is fixed on the
board. Wires are drawn through it and connections are done as per connection
diagram. Circuit is verified by connecting to an ac supply.
RESULT
NI
- Main Electrode
A - Auxiliary Electrode
230V 50Hz
LAYOUT
Choke
20
20
20
230V 50Hz
p
(9
LAYOUT
20
20
230V 50Hz
20
C...S
Ca)
S1
LAYOUT
20
20
20
20
SWITCHING OPERATION
Si
S2
Ll
L2
4110
20
C-2
C-2
DIM
DIM
C-1
C-1
BRIGHT BRIGHT
20
C-1
C-2
BRIGHT
DARK
C-2
C-1
DARK
DARK
CONNECTION DIAGRAM
S1
S2
STAIRCASE WIRING
AIM
A wiring is setup to connect two switches in order to control one lamp so that
it can be controlled by each one independently. Also prepared the estimation for the
same.
QUESTION
10
LAYOUT
SWITCHING OPERATION
Si
S2
C-1
C-1
BRIGHT
C-2
C-2
BRIGHT
C-1
C-2
DARK
C-2
C-1
DARK
CONNECTION DIAGRAM
2 3 0 V 5 0Hz
Si
S2
11
Set up a wiring of fluorescent lamp with electronic and magnetic choke and to
prepare an estimation for the same.
TOOLS REQUIRED
Connections are done as per circuit diagram 1. Supply is given and circuit
diagram is tested. Then second diagram is set up and checked by connecting to ac
supply.
RESULT
Wiring of fluorescent lamp with electronic and magnetic choke is done and an
estimation is prepared for the same.
QUESTION
12
23 OV SOHz
230V 50Hz
13
HOSPITAL WIRING
AIM
To prepare an estimate and wire up the circuit to control two lamps with two
switches (one way switch and two way switch) so as to get both dim, both bright and
only one bright.
TOOLS REQUIRED
Screwdriver, cutting plier, line tester, hammer, pocker.
PROCEDURE
Draw layout diagram in wooden board provided. 20cm PVC wiring pipe is
clamped with saddle as per diagram. Junction box is used to connect these pipes.
Wires are drawn through the pipes and connections are done as per connection
diagram. Fix the lamp holders. Close the junction box. Verify the switching operation
after connecting to ac supply.
RESULT
A circuit is wired up to control two lamps with two switches so as to get both
dim,both bright and only one bright and an estimation is prepared for the same.
QUESTION
Compare AC and DC systems of supply.
14
14
SWITCHING OPERATION
LAYOUT
L i
20 0
2
20
L-2)
20
2D
20
C:D
Si
S2
C-1
ON
BRIGHT BRIGHT
C-2
ON
BRIGHT
DARK
C-1
OFF
DARK
DARK
C-2
OFF
DIM
DIM
Ll
L2
CONNECTION DIAGRAM
L
1 f b 230v 50 Hz
S2
15
Draw layout diagram in wooden board provided. 20cm PVC wiring pipe is
clamped with saddle as per diagram. Junction box and elbows are used to connect
these pipes. Wires are drawn through the pipes and connections are done as per
connection diagram. fix the lamp holder. Close the junction box and distribution
box . Verify the switching operation after connecting to ac supply.
RESULT
PN
17
19.
18
EARTH MEGGAR
AIM
To measure the resistance of earth using earth meggar.
APPARATUS
Earth meggar, three aluminium rods, connecting wires, hammer.
PROCEDURE
Terminals C1 and P1 are shorted and is connected to earth electrode.10m is
measured from the earth electrode and a rod is driven there. It is connected to C2.
Another rod 2.5m from earth electrode is driven and connected to P2. Reading is
taken. Then second rod is shifted to 5m from earth electrode and connected to P2.
Reading is taken. The procedure is repeated for 7.5m from earth electrode. Average
of these three readings gives the earth resistance.
RESULT
Earth resistance =
QUESTION
Why switches and fuses are provided in phase line?
19
INSULATION MEGGAR
Insulation
Megger
EARTH MEGGAR
Earth
Megger
Earth
Electrode
20
Soldering iron, lead, desoldering pump, leg strip, printed circuit board, wire,
IC, cutting plier.
PROCEDURE
The given electronic components are identified. For soldering of copper wire
the steps are given below
First clean the leg strip. The insulation from the end of copper wire is removed and
clean it. Then apply soldering paste to end of wire. When soldering iron is heated
place the copper wire into the hole of the leg strip. Solder it to leg strip using
soldering lead.
To solder the pins of IC base to the PCB the same procedure is used. Insert an IC to
the IC base and truth table is verified using IC tester.
Then desoldering is done using desoldering pump. For desoldering first heat the
soldering iron and melt the soldering paste with the desoldering pump. Remove
connection and clean leg strip.
RESULT
The given electronic components are identified and the soldering has been
practiced and prepared the estimation for the same. Soldered an IC base and wires in
a PCB. Inserted logic gate in the IC base and it's function is verified using IC tester.
QUESTIONS
21
NAND
IC
TRUTH TABLE
14 1 13 EL2 111
Fa
e I
7 4 CI
3'
.5
1A 1_D 1Y ZA ED EY QTID
AND
IC
TRUTH TABLE
nIcc. 4A 4B 41.- 3 A. 3 B
9I8
7408
5
1A 1E 1V 2A 2 B 2 Ir GIN
22
To prepare an estimate and to setup a half wave and full wave rectifier
with and without capacitor filter.
TOOLS REQUIRED
Testing of half wave and full wave rectifier with and without capacitor
filter is done.
QUESTION
Explain the working of half wave and full wave rectifier with and
without filter.
23
CONNECTION DIAGRAM
1
--) C-
230V 50Hz
-:
-5
c_____________(-\_
L 0
6
-41
1N4007
To CRO
T
1000pF