LIQUID PENETRANT INSPECTION REPORT
Report no.
& Date
Customer
PO No.
Work Order No
DU No/QTY
Job Description
Name of part
HMM/LPI-FJ/005,
BHEL (GADARWARA)
7100121321/26.11.2014
U8/1805-HT-141-1-36-355
061
:
Quantum of Test
Drawing No/Rev
FB355-161
FILLET JOINT
:
100%
2-36-355-44886/00
Material Specification :
IS 2062-E250 B
Stage of test
After Welding
Ambient temperature
Cleaner
:
(CHECKMATE)
DPT Cleaner
Penetrant
:
(CHECKMATE)
DPT Penetrant
Developer
(CHECKMATE)
Dye
Visible
Penetrate
Solvent Removable
Dwell Time
10 Minutes
Development Time
15 Minutes
Procedure Ref
Acceptance Standard :
Findings
No Signification Defects
Result
Acceptable
Date of test
24.11.2015