HMM INFRA

LTD.
LIQUID PENETRANT INSPECTION REPORT
Report no.

& Date

Customer

PO No.

Work Order No

DU No/QTY

Job Description
Name of part

HMM/LPI-FJ/005,

BHEL (GADARWARA)
7100121321/26.11.2014
U8/1805-HT-141-1-36-355
061
:

Quantum of Test
Drawing No/Rev

FB355-161
FILLET JOINT
:

100%
2-36-355-44886/00

Material Specification :

IS 2062-E250 B

Stage of test

After Welding

Temperature of the part

Ambient temperature

Cleaner

:
(CHECKMATE)

DPT Cleaner

Penetrant

:
(CHECKMATE)

FC-711/2 EXP DATE JUL 2016

DPT Penetrant

Developer
(CHECKMATE)

Dye

Visible

Penetrate

Solvent Removable

DPT Developer FC-811/2- EXP DATE JUN 2016

Dwell Time

10 Minutes

Development Time

15 Minutes

Procedure Ref

FC-911/2 EXP DATE JUL 2016

BHE: NDT: PB: PT01 (LATEST) (MQP Clause: 2.1)

Acceptance Standard :

BHE: NDT: PB: PT01 (LATEST)

Findings

No Signification Defects

Result

Acceptable

Date of test

OPERATORS NAME & LEVEL

24.11.2015

AIA Inspection Engineer