I. Scope of Works 125,000: 10. Layout of Concrete Flooring
I. Scope of Works 125,000: 10. Layout of Concrete Flooring
I. Scope of Works 125,000: 10. Layout of Concrete Flooring
Scope of Works
1. Mobilization - 10,000
2. Working Permits
3. Welding Works - 40,000
4. Masonry Works - 40,000
5. Electrical/Houskeeping - 30,000
6. Preparation/layout of working areas
7. Layout of Concrete Pillar
8. Fabrication of steel trusses
9. Painting of steel trusses
125,000
11.
12.
13.
14.
15.
II. Materials
114,700
1. Sand - 80bags - 4,000
2. Cement - 40bags - 10,000
3. Gravel - 120bags - 8,000
4. Steel Round Bar - 12mm -45 pcs 10mm - 30pcs - 15,000
5. Angle Bar - 2"x2" - 20pcs - 1 1/2"x1 1/2" - 40 pcs - 35,000
6. Explosion Proof Ligting Fixtures - 2pcs - 20,000
7. Electrical Wires, Conduits & Switches - 2,500
8. Redoxide paint - 3,600
9. Color Roof - 2,500
10. Latex Paint - 3,600
11. Lumber & Plywood - 10,000
III. Miscelleneous
1. Service vehicle - 10,000
2. Consumbales - 10,000
3. Lodgings - 20,000
4. Tools/PPE/Equipment - 15,000
Work duration - 10 days
Manpower - Welder -2
- Mason - 4
- Steelman - 2
- Electrican - 1
- Helper - 2
Total
Vat
Grand Total
55,000
294,700
35,364
330,064
Total Manpower - 11