Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A

RAILING

16950

4300

1420
1000

1
SIDE WALL EL:1419.300

HFL EL:1417.920

19700
1420

300

8500

OGEE EL:1414.300

PLUM CONCRETE WITH 40% BOULDERS


DEEP OVER FLOW EL:1414.000

HFL EL:1413.430

NSL

2430
EL:1410.800

10000

1000

1000
1

2800

RCC G20
STILLING BASIN EL:1409.000

3535

LEAN CON. 75mm THICK

1000

750

2000
EL:1409.500

1000

CUT-OFF WALL
LEAN CONCRETE 2

10000
1000
D/S STONE APRON OR BOULDERS (GROUTED)
PCC 1:3:6

2
1

LEAN CON. 75mm THICK

18870

10580

1410

SLOPE 0.1 %
1

300

1700

500

R.C.C G35

R20
00

1405

2800
15
00

1000

1000

CON.JNT

PLUM
CONCRETE
WITH 40%
BOULDERS

DETAIL "5"

SHEAR KEYS @ 2000mm


(TRANSVERSE)

1000

2
1

1415

SIDE WALL EL:1414.000

3000

U/S STONE APRON OR BOULDERS


(DRY)

1410

SIDE WALL EL:1415.000

300

RAILING

1415

40950

500

1405

1500
SEE DETAIL "6"

31450
GROUT IN 2 ROWS SEALED WITH BED ROCK
1401

1401

B
C-01-02

SECTION G-G

SCALE 1:250

R222

R96
OGEE EL:1414.300

1160

200

300

50

80

500

675

16

R8

80

770

45

10

500

750

2000

RCC G20

EL:1409.500

RCC G20

1500

2
2125

39

GROUT IN 2 ROWS SEALED WITH BED ROCK

60

1
1

CUT-OFF WALL

DETAIL "5"

DETAIL "G-G"

2
150

500

SCALE 1:100

50
3000

135

2800

1000

500
1170

SLOPE -0.1 %

1000

1700

PLUM CONCRETE WITH


40% BOULDERS

2800

CON.JNT

U/S STONE APRON


OR BOULDERS (DRY)

R.C.C G35

157

800

7780

300

15

00

R20

00

1000

1000

200

200

00

0
70

EL:1410.800

60

48

10

PCC 1:3:6

300

SHEAR KEYS @ 2000mm


(TRANSVERSE)

50

SHEAR KEYS @ 2000mm


(TRANSVERSE)

700

50

200

1000

72

2430

2710

3500

30

1
150

1000

500

SCALE 1:50

D/S STONE APPRON OR BOULDERS

1500
LEAN CON. 75mm THICK

2800

DETAIL "6"

LEAN CON. 75mm THICK

SCALE 1:100

ISSUED FOR CONSTRUCTION


CLIENT:
GOVERNMENT OF KHYBER PAKHTUNKHWA

CONTRACTOR:
GRC JOINT VENTURE

DESIGN
SUB-CONTRACTOR:

84-NUSRAT ROAD HASAN ARCADE ,MULTAN CANTT,


MULTAN, PAKISTAN
PH: 92 614512263 Fax: 92 61 4545190
EMAIL: Info@grc.com.pk, grcjabori@gmail.com

BAK CONSULTING ENGINEERS

PAKHTUNKHWA ENERGY DEVELOPMENT


ORGANIZATION (PEDO)
FILE REFERNCE: D:\PROJECT\P1010-JABORI HPP DETAILED DESIGN\E-DRAWINGS\LEVEL -II DRAWINGS\E-DRAWINGS\C-WEIR\P1010-C-01-02 TO 10.DWG

2-D SAHIBZADA ABDUL QAYUM ROAD,


UNIVERSITY TOWN, PESHAWAR, PAKISTAN
PH: 92 91 5853670 & 74 Fax: 92 91 5840807
EMAIL: bakpk@brain.net.pk, bakjabori@gmail.com

REV
C01
P06
P05
P04
P03
P02
P01

DESCRIPTION
ISSUED FOR CONSTRUCTION
REVISED AS LEVEL-II DRAWINGS
ISSUED AS LEVEL-II DRAWINGS
REVISED LEVEL-I DRAWINGS
REVISED LEVEL-I DRAWINGS
REVISED LEVEL-I DRAWINGS
ISSUED AS LEVEL-I DRAWINGS

DATE
23.12.15
14.12.15
06.11.15
13.08.15
22.06.15
09.04.15
07.02.15

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS ARE IN METERS
UNLESS SPECIFIED OTHERWISE.

PROJECT:
DESIGN, PROCUREMENT AND CONSTRUCTION OF 10.2 MW DESIGNED
JABORI HYDROPOWER PROJECT (DISTRICT MANSEHRA). CHECKED (BAK)
CHECKED (GRC)
TITLE:
DRAWN

WEIR
WEIR LONG SECTION & DETAILS

APPROVED

M.BILAL
NAQIB MARWAT
ARSALAN HAIDER
M.SHOAIB ILAHI
AZIZ UL HAKEEM

DRAWING NO.

P1010-C-01-06

SCALE
AS SHOWN
DATE
FEB. 2015
REV

C01