110V Battery Sizing

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 21

OF

110V Battery and Battery Charger Sizing


Calculations

REVISIONS
BY:

DRAWN
Shabeer.A

DATE: 10/08/2008

CHECKED
BY:

K. Kandiah

DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:

DRAWING TITLE
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED

REINFORCEMENT OF Al Leith 33/13.8kV S/S

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

1 of 13

110V Battery & Battery charger Sizing Calculations


JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D


DESCRIPTION

110V Battery & Battery charger Sizing Calculations Submitted for approval
###
###

BY
DATE
NO.

DESIGN CALCULATION

1-

110V Battery Bank Sizing Calculations

2-

110V Battery Charger Sizing Calculations

3
10

NO.
###

DATE
###

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

Page

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

2 of 13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

TABLE OF CONTENTS

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this


document deals with sizing 110V battery bank to cater for new as well as relocated equipment
in substation building. 110V DC system shall consist of 1 No. battery bank and charger.
2 - CALCULATIONS
The calculations for sizing the battery are based on IEEE-1115

2-1

CELL SIZING CALCULATIONS :

The station DC auxillary power supply parameters for DC Control System are as follows.
Battery Type

Ni-Cad

Nominal DC system Voltage

110 V

Minimum allowable system voltage percentage

0.9

End cell voltage

1.1

Minimum Allowable DC system Voltage

99

Minimum Allowable DC system Voltage


End cell voltage

( Ncell )

99/1.1

90

Cells

NO.
###

DATE
###

Number of cells Required ( Ncell )

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

3 of 13

110V Battery & Battery charger Sizing Calculations


JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

1- SCOPE

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

A. 110V BATTERY BANK SIZING CALCULATIONS

LOAD CALCULATION :

TABLE-1

Sl.No.

Description

Qty

Unit Load
(Watt)

Total Load
(Watt)

1
1
1
1
1
1

75.2
24.4
29.8
61.2
77.3
133.3

75.2
24.4
29.8
61.2
77.3
133.3

Continuous Loads
1
2
3
4
5
6

33kV feeder Panel (+ARH05 )


33kV Bus Coupler feeder Panel (+ARH07 )
33kV Bus bar Protection Panel ( +ARHBB02 )
33kV Transformer Protection Panel ( +ARH06 )
33kV Transformer AVC Panel ( +AVC3)
33kV Transducer Panel

TOTAL
TOTAL CONTINUOUS CURRENT

401.2/110

401W
3.65A

NO.
###

DATE
###

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

Continuous load of 401.2 W ( 3.65A ) for Duration of 8 hours is considered.


Load details are given in Table - 1

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

4 of 13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

2.2

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

Unit Loads for Trip Coils have been given table-2


a) Worst Critical case of assessing the momentary Loading :
i ) Worst Critical case assessing the momentary loading has been assessed which
involves simultaneous tripping of 5 Nos. of 33kV CBs on 33kV bus fault and
8 Nos. of 13.8kV CBs on 13.8kV bus fault

2.4

Load of 5 x 2 No. Trip Coils

5 x 2 x 50

500

Load of 8 x 2 No. Trip Coils

8 x 2 x 50

800

Total Trip Coils

1300

Nominal DC system Voltage

110

Total Tripping Current

11.82

RESTORATION LOADS
Momentary Loading for restoration is considered as the load for closing 2 no. 33kV CB,
1 Nos. of 13.8kV CBs, tripping of 1 No. of 13.8kV CB ( if the fault persists ) and 1 No. of
Spring Charging motor running. Load details are given in table 2
i)
ii)
iii)
iv)

DATE
###
DRAWN
BY:\ Shabeer.A

Sl.No
a)

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
DATE:

ENG'G DEPT
BY:
DATE:

=
=
=
=

2 x 50
1 x 50
1 x 50
1 x 380

=
=
=
=

100
50
50
380

W
W
W
W

Total

580

Total Restoration Current

5.27

MOMENTARY LOADS

DATE: 10/08/2008

BY:

Load of 2 33kV closing CB


Load of 1 13.8kV closing CBs
Load of 1 13.8kV Tripping CB
Load of one operating motor
running

Table - 2

NO.
###
REVISIONS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

TRIPPING LOADS

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

2.3

b)

Description
33kV Switchgear ( assumed)
Circuit Breakers
Trip Coil-1
Trip Coil-2
Closing Coil
13.8kV Switchgear
Circuit Breakers
Drive Mechanism
Trip Coil-1
Trip Coil-2
Closing Coil

Qty

Unit Load
(Watt )

Total Load
(Watt )

1
1
1

50
50
50

50
50
50

1
1
1
1

380
50
50
50

380
50
50
50

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

5 of 13

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

EMERGENCY LOAD
Emergency Lighting load for 1.5 hours is considered as 360W ( 2.88A ) maximum number
of 9 incandascent lamps of 40W each are switched on at any given time by the maintenance
personnel who reach the substation within 1.5 hours of power failure

LOAD SUMMARY :
The respective loads are listed below. Duty cycle is given in Annex-1

Continuous Load

8 hours

3.647 A

Momentary Tripping Load

1 min.

11.82 A

Momentary Restoration Load

1 min.

5.273 A

Emergency Lighting Load

1.5 Hours

2.88

BATTERY SIZING WORKSHEET :


Given in Annexure II and III.

BATTERY CURVE/ DATA :


Manufactures Data are given in Annexure IV.

CALCULATION OF REQUUIRED SIZE :


Maximum uncorrected size

107.85 Ah

Temperature Correction

Design Margin

1.15

Aging Factor

1.25

Required Capacity

Uncorrected Size x Design Margin x Aging factor


x Temperature Correction Factor

Required Capacity

107.84948 x 1.15 x 1.25 x 1.2

Required Capacity

1.20

(Refer IEEE-1106, Table A.1)


(at minimum Temp = -5C)

NO.
###

DATE
###

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

2.5

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:

186.04 Ah

DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

6 of 13

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

Required Battery Ah capacity

Nearest available size

186.0 Ah
208

Ah

The Total Ampere - hour capacity may be used to determine the intial cell size,
the total capacity = 186.0 Ah and the choosen battery is SBM208
Rated Capcity = 208 Ah

NO.
###

DATE
###

BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

7 - CONCLUSION

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

7 of 13

110V Battery & Battery charger Sizing Calculations


JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

Continuous Load + momentary Tripping

15.47 A

A2

Continuous Load

3.647 A

A3

Continuous + Emergency

6.527 A

A4

Continuous

3.647 A

A5

Continuous + Restoration

8.92 A

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D


DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

NO.
###

DATE
###

BY

A1

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

8 of 13

110V Battery & Battery charger Sizing Calculations


JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

AMPERE

A1= 15.5A

5.27 A

A5=8.92A

2.88A
A2=A4=3.65A

NO.
###

DATE
###

A3=6.53A

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT

M1

M2

M3

M4

M5

BY:
DATE:

ENG'G DEPT

90

180

479

480

MINUTES

BY:
DATE:

CERTIFIED

Al-Leith 33/13.8kV Substation Load duty cycle profile for


110V DC Battery Sizing Calculation

BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

9 of 13

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D


BY

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

ANNEXURE -

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D


DESCRIPTION

1 - SCOPE :
To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this
document deals with sizing 110V battery charger to cater for new as well as relocated equipment
in existing SWGR building. DC system shall have one battery float / boost charger.

2 - CALCULATIONS :
The ampere hour rating of a battery charger is determined by equation which is as per
Technical specification
A

(1.25 X L)+ (BIF X AHR) ) / 0.83


RT

Where :
A

required charger rating in amperes

Maximum Required DC load in amperes


( Continuous load is considered )

3.6

BIF

Battery inefficiency factor

1.1

AHR

Ampere hour removed during discharge


(Maximum discharger is considered)

208

RT

Recharge time in hours

16

###

DATE

BY

110V Battery & Battery charger Sizing Calculations Submitted for approval

B. 110V BATTERY CHARGER SIZING CALCULATIONS

Subsitituting the above values in Equ - 1


=

[ (1.25 x 3.2 ) + (1.1 x 200) ] / 0.83

###

NO.

AR

###

REVISIONS
DRAWN

AR

22.72

BY: Shabeer.A
DATE: 10/08/2008

Next higher size available

50A

CHECKED
BY: K. Kandiah
DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

The battery Charger Current Size

50A

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

10 of 13

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D

ANNEXURE -II

DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

CALCULATION OF CAPACITY RATING FACTOR.( KT )


REFERENCE

IEEE Std. 1115-2000

Minimum Cell Voltage

1.1 V

Cell Mfg.

SAFT

KT

Rated Ampere hour capacity (Ay std. Time Rate at 25 C


to Std % end of discharge)
Ampere that will be supplied for T minute at 25 C
to given end of discharge voltage

The Kt factor for time t is calculated in the table by interpolation using the formula
(Kt2 - Kt1) x ( t2 - t )
= Kt2

Kt

( t2 - t1 )

End voltage discharge voltage of cell

1.1

Rated Ampere hour capacity

208 Ah

NO.
###

DATE
###

BY

Calculation of KT Factor :

REVISIONS
DRAWN
BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah

Sl.No

T minute

Total Ampere

KT Factor

354

0.588

90

93.9

2.215

180

60.6

3.432

479

25.65

8.109

480

25.60

8.125

DATE: 10/08/2008

OPRG DEPT
BY:
DATE:

ENG'G DEPT
BY:
DATE:

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S


110V Battery & Battery charger Sizing Calculations

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

11 of 13

THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

change in
period Load (A)
load (A)

Duration of
operation
(min)

time to end of
section (min)

KT factor

Require section size


(Ah)
+ve value

-ve value

Section - 1 first period only


1

A1 =
15.50

A1-0= 15.50

M1 = 1.0

T = M1 =

1.0

0.5880

9.11

Total

9.11

Section - 2 first two periods only


1
2

A1 =
15.50
A2 =
3.65

A1-0= 15.50

M1 = 1.0

A2-A1=
-11.85

M2 = 89.0

T =M1+M2 = 90
T = M2 =

89.0

2.2150

34.33

2.1970

-26.03

Total

8.30

Section - 3 first three periods only


1
2
3

A1 =
15.50
A2 =
3.65
A3 =
6.53

A1-0= 15.50
A2-A1=
-11.85
A3-A2=
2.88

T = M1+M2+M3 =
180.0
T = M2+M3 =
M2 = 89.0
179.0
T = M3
M3 = 90.0
90.0
M1 = 1.0

3.4320

53.20

3.4190
2.2150

-40.52
6.38

Total

BY

1
2

DATE
###

NO.
###

A1 =
15.50
A2 =
3.65
A3 =
6.53
A4 =
3.65

Section - 4 first four periods only


T=
A1-0= 15.50 M1=
1.0 M1+M2+M3+M4 =
8.1080
479.0
A2-A1=
T = M2+M3+M4 =
M2 = 89.0
8.0920
-11.85
478.0
A3-A2=
T = M3+M4=
M3 = 90.0
6.6070
2.88
389.0
A4-A3=
T =M3
M4 = 299
5.1090
-2.88
299.0
Total

19.06

125.67
-95.89
19.03
-14.71
34.10

Section - 5 first five periods only

REVISIONS
DRAWN

BY: Shabeer.A
DATE: 10/08/2008

CHECKED
BY: K. Kandiah

DATE: 10/08/2008

OPRG DEPT

BY:
DATE:

ENG'G DEPT

A1 =
15.50
A2 =
3.65
A3 =
6.53
A4 =
3.65
A5 =
8.92

A1-0= 15.50
A2-A1=
-11.85
A3-A2=
2.88
A4-A3=
-2.88
A5-A4=
5.27

T=
M1+M2+M3+M4 =
480.0000
T=
M2 = 89.0 M2+M3+M4+M5 =
479.0
T = M3+M4+M5=
M3 = 90.0
390
T = M4+M5
M4 = 299
300
T = t4
M5 = 1.0
1.0000
M1 = 1.0

8.1250
8.1080
6.6240

0.5880

SECTION - 1 to 5 (TOTAL)

DATE:

-96.08
19.08

5.1230

Total

BY:

125.94

-14.75
3.10
37.28
107.85

CERTIFIED
BY:
DATE:
THIS DRAWING IS
NOT TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

DRAWING TITLE

REINFORCEMENT OF Al Leith 33/13.8kV S/S

DRAWING NO.

SHEET NO.

REV NO.

AG/ALS/E-342

12 of 13

110V Battery & Battery charger Sizing Calculations


JEDDAH

SAUDI ARABIA

JOB ORDER NO

20641055/00

DWG CONT SHT

AG/ALS/G-001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CHK'D APPVD CERT'D


DESCRIPTION
110V Battery & Battery charger Sizing Calculations Submitted for approval

ANNEXURE-III

13 of 13

13 of 13

You might also like