Aqc Boiler I/L and O/L damper closed at 2:30pm due to low temperature Vacuum dropped -0.85kg/cm2 to o.oo kg/cm2 at 2:32pm
DATE:21-08-2015
Hogger charging started at-8:57am
Vacuum dropped -0.85kg/cm2 to 0.00kg/cm2 at 4:45 due to bypass damper of Aqc has been opened due to pressurise the boiler due to leakage found Gasket of safety valve of Hp header at 4:40 pm Turbine desync at 4:50 pm Vacuum dropped -0.72kg/cm2 to 0.00kg/cm2 at 4:53 pm Hogger line taken at 11:32pm Ejector taken at 2:15am Hogger cut it at 2:20am vacuum maintained normally -0.850kg/cm2 upto 4:20am again Hogger taken at 4:35am DATE:22-08-2015
Ejector taken in a line 8:35am again Vacuum drop so hogger
taken in a line .Vacuum goes to -0.85 to -0.77 and after hogger taken in a line -0.86
Due to low kiln temperature
DATE:23-08-2015
Hogger taken into line due to vacuum drop at 1:45 pm and
again hogger cut at 2:30pm DATE:30-08-2015
Ejector service engineer come,so checking that ejector that
line hogger taken
DATE:3-09-2015
Vacuum dropped o.81kg/cm2 to -0.63kg/cm2 at 9:35pm due to
CST manual doar air leekage and that time turbine tripped due to problem manually DATE:12-09-2015
Vacuum hold at -0.61kg/cm2 C Shift-Vacuum hold at
-0.65kg/cm2 DATE:13-09-2015
Vacuum maximum reached upto -0.50kg/cm2 at 2:10pm
DATE:15-09-2015
Vacuum maximum reached upto -0.65kg/cm2
DATE:16-09-2015
Vacuum maintained -0.68kg/cm2 and when ejector taken in line
it goes to -0.72kg/cm2 and after rolling goes to -0.62kg/cm2 DATE:17-09-2015
Vacuum maintained -0.71kg/cm2 and when ejector taken in line
vacuum goes to -0.731kg/cm2 DATE:20-09-2015
Hogger MOV OPEN AT 3:49 PM VACUUM INCREASE UPTO
-0.72Kg/cm2 and than dropped DATE:21-09-2015
Vacuum goes upto -0.64kg/cm2
DATE:21-09-2015
In august and September when plant running normally and
vacuum dropes we have open ejector inter condenser U-loop isolation valve for sometime and than vaccum again rise and maintained If still problems comes hogger has been taken in line