Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref.

kV=33)
.5

10

30

50

100

300

500

1K

3K

5K

1K

10K
1K

500

500

300

300

H17-RP - G
OC1
33kV B/S
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.44
3x = 2.77 s, 5x = 1.88 s, 8x = 1.45 s

100

H08-RP - G
OC1

50

120MVA I/C
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.47
3x = 2.96 s, 5x = 2.01 s, 8x = 1.55 s

30

Seconds

10

100

50

30

10

.5

.5

.3

.3

H03-RP - G
OC1
33kV O/G-SWGR-A
ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.3
3x = 1.89 s, 5x = 1.28 s, 8x = 0.989 s

.1

.05

.03

T201-MV-SBEF - G
OC1

.1

120MVA MV SBEF
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 36 (1 - 100 xCT Sec)
Time Dial = 0.46
3x = 2.9 s, 5x = 1.97 s, 8x = 1.52 s

.05

.03

.01
.5

10

30

50

100

300

500

1K

Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref. kV=33)


N7733-ZAKHER
Project:
Location:
Contract:
Engineer:
Filename:

220/33/11kV Zakher Grid


Zakher Area of Al Ain
N7733
JM
C:\ETAP 1250\N7733\N7733.OTI

3K

5K

ETAP Star 12.5.0C

CASE:2.2 EF
Date:
SN:
Rev:
Fault:
Circuit:

.01
10K

21-01-2016
LARSENTRN2
Base
Ground
120MVAMVSBEF,33kVI/C,BS,OG