Proposed 1-Storey SMCI Dorm.

LOCATION: Daro, Dgte city


SUMMARY
AREA (m2)
Footing
Column
Tie Beam
Roof Beam
Slab

CR Fixtures

Ceiling

Tiles

16 mm
bar(pcs)

9
6
5

44
105

12 mm
bar(pcs)

10 mm Cement(b Sand(m^3
bar (pcs)
ags)
)

Gravel
(m^3)

78

81
54
41

9
6
5

104
77

4.5
3
2.5

CHB(pcs)

(4"x6")
GF

Wall footing
Wall (net)
Truss
TOTAL

Volume
(m3)

154

G-melina
(bf)

5748
14
5

24

248
(2"x 4")
39

149

water closet

lavatory

Shower
4

Metal Furring
(pcs)

C-Channel
(pcs)

Hardielite
(pcs)

61

20

28

Floor

Cr Wall

191@rooms
/ 124@cr

918

102

Wall
angle
26

246
147
191
765

113
38
363
690

7
2.5
29
48.5

14
5
3329
39

3329

3900
9648

SUMMARY:

ITEM
16 mm
bar(pcs)
12 mm
bar(pcs)
10 mm bar
(pcs)
Cement(bags)
Sand(m^3)
Gravel (m^3)
CHB(pcs)
G-melina (bf)
lavatory
shower
Water closet
Metal furring
C-channel
Hardie-lite
wall angle
Tiles (room's
floor)
Tiles (CR's
floor)
Tiles (CR's
wall)
insulation
foam
corrugated GI
roof

Price/unit

Total
price

102

160

16320

765

108

82620

690
48.5
39
3329
9648
2
4
4
61
20
28
26

230
500
450
8
30

158700
24250
17550
26632
289440

108
125
366
40

6588
2500
10248
1040

191

150

28650

Unit
149

124
918

Notes:
1. Roof Area
126 m^2
2.Wood works
Roof beam: 4"x6"
Truss:
2"x4"
3.TILES
Rooms: 0.6x0.6 m
CR: 0.3x0.3 m
4.ITEMS NOT INCLUDED IN THE ESTIMATE

Plumbing
Paints
Electrical
Tiles adhesives (cement and etc)
Def. bars for ceiling stiffener
Double decks
Form works (Nails, plywoods, scaffolds)