PEKERJAAN
1 TANAH
GALIAN PONDASI FOOTPLAT
1.4
15
10
3.5
2
7
3
4
4
1
1
1
1
1
1
1
1
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
4
5
1
11
0.8
0.5
0.5
0.5
0.3
0.3
0.3
0.3
0.1
15
10
3.5
2
7
3
4
4
1
1
1
1
1
1
1
1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
BT BATA
4
5
1
11
0.8
0.5
0.5
0.5
0.1
0.1
0.1
0.1
LANTAI
15
3
3
4
10
4
5
1
0.1
0.1
0.1
0.1
114.66
13.77
57.39
20
3
10
5
0.5
0.5
PASIR URUG
FOOTPLAT
BATU KALI
URUGAN KEMBALI
URUGAN PENINGGIAN
P
2 PONDASI
PONDASI BATU KALI
15
15
10
3.5
2
7
3
4
4
0.46
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
ANSTAMPENG
15
10
3.5
2
7
3
4
4
1
1
1
1
1
1
1
1
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
PONDASI BATA
4
5
1
11
0.8
0.3
0.3
0.3
0.6
0.5
0.5
0.5
P
3 DINDING
BATU BATA
PLESTERAN
15
10
3.5
2
7
3
4
4
1
1
1
1
1
1
1
1
4
4
4
4
4
4
4
4
15
7
3.5
4
3
5
4
4
1
1
1
1
1
1
1
1
4
4
4
4
4
4
4
4
ACIAN
P
4 BETON
SLOOF 20/40
10
14
0.4
0.4
0.2
0.2
SLOOF 15/20
3.5
5
4
2
5
0.15
0.15
0.15
0.15
0.15
0.2
0.2
0.2
0.2
0.2
BALOK 20/40
10
13
8
7
6
1.5
0.4
0.4
0.4
0.4
0.4
0.4
0.2
0.2
0.2
0.2
0.2
0.2
BALOK 20/30
2
10
5
4
3
10
0.3
0.3
0.3
0.3
0.3
0.3
0.2
0.2
0.2
0.2
0.2
0.2
BALOK 15/20
2
3.5
3
2
0.3
0.3
0.3
0.3
0.2
0.2
0.2
0.2
13
11.5
4
10
8.5
32
9
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.2
0.2
0.2
0.2
0.2
0.2
0.2
BALOK 15/25
0.15
0.25
KOLOM 20/20
0.2
0.2
KOLOM 15/20
0.15
0.2
KOLOM 15/15
0.15
0.15
KOLOM 15/45
FOOTPLAT
PLAT 15CM
TANGGA
PLAT 10 CM
TALANG
PLAT 5 CM
RABAT
4
9
0.15
0.15
0.15
0.15
0.15
0.15
0.2
97.25
3
3
2
2
2
1
0.2
1.2
1
1.5
3.65
0.15
0.15
0.15
0.15
0.15
0.15
3
2.4
1.35
2.85
2
0.5
13
8
1
1
1
1
2.5
5
1
1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.05
0.05
P
5 KUSEN&PINTU
KUSEN ALLUMUNIUM
PINTU
JENDELA
2.24
2.24
2.24
2.24
2.54
0.8
1.3
0.7
1.22
2.8
2.2
2.2
2.2
2.2
2.2
1.78
5.34
14
5.84
0.76
0.6
2.54
5.36
3.81
2.24
0
0
0
0
0
2.2
2.2
2.5
0.8
1.3
2.8
0.03
0.03
0.03
2.2
0.7
0.03
35.2
0.7
0.03
1.56
1.75
1.7
1
1.34
0.45
0.87
2.4
0.5
0.47
1
1
1
1
1
1.82
0.44
2.2
1.22
KACA BENING 1 CM
0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
1
1
1
1
1
1
1
1
1
1
HOLLO 4/4
2.65
2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85
0.8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
HOLLO 2/4
2.65
2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7 PLAFON
13
2
1
7
P
8 ATAP
GALVALUM
GENTENG
LT2
20/20
1
1
1
1
13
3.5
3
10
5
2
1
1
1
6.17
6.17
3.5
3.5
13
10
5
3
1.84
2
1
3.5
P
9 LANTAI
60/60
LT1
10
4
1
2
11
2
1
0.3
0.2
11
2
1
10
4
2
2
2
10
4
2
1
1
1
1
1
1
1
1
1.5
BALKON
4.5
5.5
DINDING 20/40
1.5
2
1.5
2
3
3
2.2
2.2
1
1
1
1
0.78
2.28
JUMLAH
TOTAL
ALL
25
35
3
1
2
1
2
3
1
1
36
8
5.6
1.6
11.2
7.2
3.2
3.2
SAT.
35 M3
76 M3
1
1
2
1
0.96
0.75
0.3
1.65
3.66 M3
25
2.5
3
1
2
1
2
3
1
1
4.5
1
0.7
0.2
1.4
0.9
0.4
0.4
9.5
0.32
0.25
0.1
1.1
1.77
12.8
1.2
1.5
0.4
15.9
1
1
2
2
1
1
1
1
1
1
29.67 M3
43.5 M3
100
7.5
49 M3
JUMLAH
TOTAL
2
1
1
2
1
2
3
1
1
ALL
SAT.
9.66
4.41
2.94
2.058
0.588
4.116
2.646
1.176
1.176
28.77 M3
3
1
2
1
2
3
1
1
9
2
1.4
0.4
2.8
1.8
0.8
0.8
1
1
2
1
1.92
0.75
0.3
1.65
19 M3
4.62
JUMLAH
TOTAL
ALL
3
1
2
1
2
3
1
1
180
40
28
8
56
36
16
16
2
1
1
1
4
2
2
1
120
28
14
16
48
40
32
16
SAT.
642.3718 m2
1236.236
1236.236
JUMLAH
TOTAL
6
4
ALL
4.8
4.48
9.28
0.21
0.15
0.12
0.12
0.3
0.9
4
2.08
0.64
0.56
0.48
0.24
8
0.72
0.6
0.9
0.48
0.36
0.6
3.66
0.12
0.42
0.18
0.12
0.84
0.78
0.345
0.12
0.6
0.255
0.96
0.27
3.33
0.7875
15
2.4
10
1.2
21
1.89
2
1
1
2
2
5
2
1
1
1
2
6
1
3
2
2
1
1
2
1
1
2
1
1
2
1
1
1
SAT.
32
2
6
2.88
0.405
5.175
0.54
25
1
1
1
1
1
2
14.5875
0.09
0.54
0.3
0.45
2.19
18.1575
2
2
2
1
1
1
2
1
0.6
0.48
0.27
0.285
0.5
0.25
2.6
0.8
5.785
0.08
0.75
60.135
JUMLAH
TOTAL
ALL
SAT.
9
2
5
2
1
47.16
11.48
25.7
11.32
7.54
95.66
16.128
5.824
7.84
5.4656
7.112
95.66 35.2576
5
1
1
1
1
23.8
7.88
19.36
9.65
3
63.69
5.34
2.2606
4.69
4.08
16.3706
63.69
51.6282
9
2
1
0.4752
7.06
5.33
12.8652
5
14.65
12.8652
14.65
6.6528
6.6528
9
6
1
2
4
6.318
9.135
4.08
1
2.5192
23.0522
23.0522
3.2032
3.2032
5.368
5.368
1
1
1
1
1
2
1
1
1
1
0.448
0.84
0.9128
2.52
1.652
3.64
1.484
1.26
0.6944
1.596
15.0472
15.0472
2.65
2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
6.5
2.65
2.25
1.24
2.85
13.6
49.46
49.46
1
1
1
1
1
1
1
1
1
2
1
1
1
1
17
5.3
2
2
2
2
2
2
2
2
2
2
2
2
2
JUMLAH
4.5
2.48
5.7
1.6
3
3.26
9
5.9
6.5
5.3
4.5
2.48
5.7
65.22
TOTAL
1
1
1
1
65.22
ALL
SAT.
130
8
1
14
123
JUMLAH
TOTAL
1
1
1
ALL
SAT.
130
17.5
6
153.5
2
1
2
4
91.5628
61.7
17.5
45.5
216.2628
JUMLAH
TOTAL
1
1
2
40
40
1
1
2
ALL
110
8
4
24
16
110
8
4
284
244.25
15
SAT.
24.75
4
4
2
2
18
24
6.6
8.8
57.4
8.892
48.508
PEKERJAAN PERSIAPAN
1 M Pengukuran dan pemasangan bowplank (Eff. 2x)
A. Bahan
Kayu 5/7
0.010
M3
Paku 2" - 5"
0.020
Kg
Kayu Papan 2/20
0.005
M3
B.
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.100
0.100
0.010
0.005
OH
OH
OH
OH
x
x
x
x
x
x
x
OH
OH
x
x
Jumlah Harga Per Satuan Pekerjaan
B.
PEKERJAAN TANAH
1 M3 Galian tanah biasa sedalam 1 meter
A. Tenaga Kerja
Pekerja
0.7500
Mandor
0.0250
OH
OH
x
x
Jumlah Harga Per Satuan Pekerjaan
Tenaga Kerja
1.2000
M3
Pekerja
Mandor
0.3000
0.0100
OH
OH
x
x
Tenaga Kerja
Pekerja
Mandor
0.2500
0.0250
OH
OH
x
x
PEKERJAAN PONDASI
1 M3 Memasang pondasi batu kali, campuran 1 PC : 4 PP
A. Bahan
Batu Kali
1.2000
M3
Portland Cement
163.0000
Kg
Pasir Pasang
0.5200
M3
B.
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.5000
0.7500
0.0750
0.0750
OH
OH
OH
OH
x
x
x
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.2000
0.4300
0.7800
0.3900
0.0390
0.0390
M3
M3
x
x
OH
OH
OH
OH
x
x
x
x
PEKERJAAN DINDING
1 M2 Memasang dinding batu bata tebal 1/2 bata, camp. spesi 1 PC : 6 PP
A. Bahan
Bata Merah
x
70.0000 Bh
Portland Cement
x
0.1660 Kg
Pasir Pasang
x
0.0430 M3
B.
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3500
0.1200
0.0100
0.0150
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3200
0.1000
0.0100
0.0150
OH
OH
OH
OH
x
x
x
x
PEKERJAAN PLESTERAN
1 M2 Membuat plesteran 1 PC : 4 PP, tebal 15 mm
A. Bahan
Portland Cement
6.2400
Pasir Pasang
0.0240
B.
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.3000
0.1500
0.0150
0.0150
Kg
M3
x
x
OH
OH
OH
OH
x
x
x
x
PEKERJAAN KUSEN
1 M1 Memasang Kusen Allumunium 4'
A. Bahan
B.
Aluminium
Sekrup fixer
Sealant
1.1000
2.0000
0.0600
M'
bh
tube
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0430
0.0430
0.0043
0.0021
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
3.0000
0.3000
0.0500
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
0.8000
2.4000
0.2400
OH
OH
OH
x
x
x
Mandor
0.0400
OH
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.2000
0.3000
0.0300
0.0100
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.2000
0.0200
0.0050
M1
Kg
x
x
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.0500
0.0050
0.0030
M'
Kg
x
x
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.650
0.275
0.028
0.083
OH
OH
OH
OH
x
x
x
x
1400.000 Kg/m3
1350.000 Kg/m3
0.200
Pasir Beton
Kerikil (maks. 30 mm)
Air
B.
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
893.000
1027.000
200.000
Kg
Kg
Ltr
x
x
x
1.200
0.200
0.020
0.060
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor
10.500
0.150
Kg
Kg
x
x
0.070
0.070
0.007
0.004
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.520
0.260
0.026
0.026
M3
Kg
Ltr
x
x
x
OH
OH
OH
OH
x
x
x
x
A.
B.
Bahan
Portland Cement
3.2500
Kg
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2000
0.1000
0.0100
0.0100
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
0.1200
0.0600
lbr
kg
x
x
OH
OH
x
x
Kepala Tukang
Mandor
0.0060
0.0060
OH
OH
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.0500
0.0050
0.0025
lbr
kg
x
x
OH
OH
OH
OH
x
x
x
x
PEKERJAAN LANGIT-LANGIT
PLL. 05 - SNI 2839:2008
1 M2 Memasang plafond tripleks uk. (120 x 240) cm, tebal 3 mm
A. Bahan
Tripleks
0.3750
Lbr
x
Paku
0.0300
Kg
x
B.
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
x
x
x
x
PEKERJAAN SANITASI
03. SANITASI SNI
1 Bh Memasang kloset jongkok
A. Bahan
Kloset Jongkok
Bata Merah 5 x 12 x 22 c
Portland Cement (PC)
Pasir Pasang
1.0000
7.0000
6.0000
0.0100
bh
bh
kg
m
x
x
x
x
B.
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.0000
1.5000
0.3000
0.1100
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0360
0.0600
0.0060
0.0018
M
%
x
x
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0810
0.1350
0.0135
0.0041
M
%
x
x
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
1.0000
0.0250
bh
bh
x
x
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.0000
bh
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
x
x
x
x
m'
bh
bh
m'
x
x
x
x
B.
Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor
0.2100
0.4000
0.0100
0.0500
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
bh
0.0100
0.5000
0.0100
0.0050
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
bh
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
0.0100
bh
OH
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.0100
0.0005
OH
OH
OH
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
bh
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.0000
bh
0.0200
0.2000
0.0200
0.0010
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.1000
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
x
x
x
x
PEKERJAAN PENGECATAN
03. CAT SNI
1 M2 Mengecat bidang kayu baru (1 lps cat dsr, 2 lps cat penutup)
A. Bahan
Cat Meni
0.2000
kg
x
Plamir
0.1500
kg
x
Cat Dasar
0.1700
kg
x
Cat Penutup
0.2600
kg
x
B.
Tenaga Kerja
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.0090
0.0060
0.0025
OH
OH
OH
OH
x
x
x
x
Tenaga Kerja
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0200
0.0630
0.0063
0.0025
OH
OH
OH
OH
x
x
x
x
PEKERJAAN ELEKTRIKAL
0.1 PIL SNI
1 M Pasang kabel NYM 3 x 1.5 mm
A. Bahan
B.
1.000
Tenaga Kerja
Tukang
Mandor
0.005
0.005
OH
OH
x
x
B.
1.000
Tenaga Kerja
Tukang
Mandor
0.005
0.005
OH
OH
x
x
A SATUAN PEKERJAAN
Rp
Rp
Rp
Jumlah A
4,000,000.00
17,500.00
2,800,000.00
=
=
=
Rp
Rp
Rp
Rp
40,000.00
350.00
14,000.00
54,350.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,500.00
9,000.00
1,000.00
600.00
17,100.00
71,450.00
71,450.00
Rp
65,000.00 =
Rp
120,000.00 =
Jumlah (A)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
6,500.00
6,000.00
12,500.00
12,500.00
Rp
65,000.00 =
Rp
120,000.00 =
Jumlah A
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
48,750.00
3,000.00
51,750.00
51,750.00
Rp
17,250.00
Rp
Rp
120,000.00
120,000.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
100,000.00
Rp
65,000.00 =
Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
19,500.00
1,200.00
20,700.00
140,700.00
140,700.00
Rp
Rp
90,000.00
90,000.00
Rp
65,000.00 =
Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
16,250.00
3,000.00
19,250.00
109,250.00
109,250.00
=
=
=
Rp
Rp
Rp
Rp
150,000.00
198,860.00
78,000.00
426,860.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
97,500.00
67,500.00
7,500.00
9,000.00
181,500.00
608,360.00
608,360.00
Rp
Jumlah A
Rp
Rp
Rp
Jumlah A
75,000.00
125,000.00
1,220.00
150,000.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
125,000.00
100,000.00
=
=
Rp
Rp
Rp
150,000.00
43,000.00
193,000.00
Rp
Rp
Rp
Rp
Jumlah B
Jumlah (A + B)
65,000.00
90,000.00
100,000.00
120,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
50,700.00
35,100.00
3,900.00
4,680.00
94,380.00
287,380.00
Rp
287,380.00
=
=
=
Rp
Rp
Rp
Rp
35,000.00
202.52
6,450.00
41,652.52
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
22,750.00
10,800.00
1,000.00
1,800.00
36,350.00
78,002.52
78,002.52
=
=
=
Rp
Rp
Rp
Rp
35,000.00
462.38
5,700.00
41,162.38
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
20,800.00
9,000.00
1,000.00
1,800.00
32,600.00
73,762.38
73,762.38
1,220.00
150,000.00
=
=
Rp
Rp
Rp
7,612.80
3,600.00
11,212.80
65,000.00
90,000.00
100,000.00
120,000.00
=
=
=
=
Rp
Rp
Rp
Rp
19,500.00
13,500.00
1,500.00
1,800.00
mp. spesi 1 PC : 6 PP
Rp
Rp
Rp
Jumlah A
500.00
1,220.00
150,000.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
mp. spesi 1 PC : 2 PP
Rp
Rp
Rp
Jumlah A
500.00
1,220.00
150,000.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
Rp
Rp
Rp
Rp
0.3790
0.0380
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Jumlah A
Rp
Rp
Rp
36,300.00
47,512.80
47,512.80
Rp
Rp
Rp
Rp
s
Rp
Rp
Rp
Rp
Rp
Rp
Rp
82,500.00
1,000.00
420.00
83,920.00
2,795.00
3,870.00
430.00
252.00
7,347.00
91,267.00
91,267.00
=
=
Rp
Rp
Rp
700,000.00
13,750.00
713,750.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
270,000.00
30,000.00
6,000.00
371,000.00
1,084,750.00
1,084,750.00
17,500,000.00
27,500.00
=
=
Rp
Rp
Rp
420,000.00
8,250.00
428,250.00
65,000.00
90,000.00
100,000.00
=
=
=
Rp
Rp
Rp
52,000.00
216,000.00
24,000.00
75,000.00
500.00
7,000.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
17,500,000.00
27,500.00
Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
=
=
=
=
=
=
=
a, kayu kelas II
Rp
Rp
Jumlah A
Rp
Rp
Rp
Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
4,800.00
296,800.00
725,050.00
725,050.00
=
=
Rp
Rp
Rp
60,310.00
5,750.00
66,060.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
13,000.00
21,000.00
2,400.00
850.00
37,250.00
103,310.00
103,310.00
=
=
Rp
Rp
Rp
45,900.00
1,750.00
47,650.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,500.00
14,000.00
1,600.00
425.00
22,525.00
70,175.00
70,170.00
60,000.00
23,000.00
=
=
Rp
Rp
Rp
22,500.00
690.00
23,190.00
65,000.00
70,000.00
80,000.00
85,000.00
=
=
=
=
Rp
Rp
Rp
Rp
6,500.00
7,000.00
800.00
425.00
yu kelas II
Rp
Rp
Jumlah A
3,700,000.00
23,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
45,000.00
35,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
tebal 3 mm
Rp
Rp
Jumlah A
Rp
Rp
Rp
Rp
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
15,000.00
22,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
14,725.00
37,915.00
37,910.00
=
=
Rp
Rp
Rp
15,750.00
220.00
15,970.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,250.00
3,500.00
400.00
255.00
7,405.00
23,375.00
23,370.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
407,100.00
82,800.00
104,948.15
21,500.00
616,348.15
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
107,250.00
19,250.00
2,240.00
7,055.00
135,795.00
752,143.15
752,140.00
Rp
339,250.00
1,475.00
100.00
103.70
100.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
1,475.00
Rp
Rp
Rp
Jumlah A
100.00
103.70
100.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
13,300.00
19,300.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Jumlah A
3,000,000.00
23,000.00
3,500.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
=
=
=
Rp
Rp
Rp
Rp
89,300.00
106,503.70
20,000.00
555,053.70
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
78,000.00
14,000.00
1,600.00
5,100.00
98,700.00
653,753.70
653,750.00
=
=
Rp
Rp
Rp
139,650.00
2,895.00
142,545.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,550.00
4,900.00
560.00
340.00
10,350.00
152,895.00
152,890.00
15,289.00
=
=
=
Rp
Rp
Rp
Rp
135,000.00
6,900.00
350.00
142,250.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
33,800.00
18,200.00
2,080.00
2,210.00
56,290.00
198,540.00
198,540.00
Rp
Jumlah A
1,475.00
Rp
Rp
4,793.75
4,793.75
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
13,000.00
7,000.00
800.00
850.00
21,650.00
26,443.75
26,440.00
Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
752,140.00
2,278,061.00
1,323,600.00
4,353,801.00
4,353,800.00
kg besi polos)
Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
752,140.00
2,935,488.00
1,527,230.77
5,214,858.77
5,214,850.00
besi polos)
Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
752,140.00
2,599,130.00
1,323,600.00
4,674,870.00
4,674,870.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
Rp
Rp
68,000.00
23,000.00
=
=
Rp
Rp
Rp
47,600.00
460.00
48,060.00
65,000.00
70,000.00
=
=
Rp
Rp
7,800.00
4,200.00
Rp
80,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
25,000.00
23,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
480.00
510.00
12,990.00
61,050.00
61,050.00
=
=
Rp
Rp
Rp
28,750.00
805.00
29,555.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,250.00
3,500.00
400.00
212.50
7,362.50
36,917.50
36,910.00
=
=
Rp
Rp
Rp
22,500.00
690.00
23,190.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,500.00
7,000.00
800.00
425.00
14,725.00
37,915.00
37,910.00
=
=
=
=
Rp
Rp
Rp
Rp
120,000.00
4,550.00
8,850.00
1,450.00
tebal 3 mm
Rp
Rp
Jumlah A
60,000.00
23,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
120,000.00
650.00
1,475.00
145,000.00
Jumlah A
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
11,333.33
11,333.33
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
17,500.00
17,500.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Jumlah A
64,000.00
7,000.00
Rp
134,850.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
105,000.00
24,000.00
9,350.00
203,350.00
338,200.00
338,200.00
=
=
Rp
Rp
Rp
13,600.00
3,966.67
17,566.67
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,340.00
4,200.00
480.00
153.00
7,173.00
24,739.67
24,730.00
=
=
Rp
Rp
Rp
21,000.00
6,125.00
27,125.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,265.00
9,450.00
1,080.00
348.50
16,143.50
43,268.50
43,260.00
=
=
Rp
Rp
Rp
64,000.00
175.00
64,175.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
25,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
12,500.00
200.00
650.00
7,666.67
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650.00
7,000.00
800.00
425.00
8,875.00
73,050.00
73,050.00
Rp
Rp
25,000.00
25,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650.00
7,000.00
800.00
425.00
8,875.00
33,875.00
33,870.00
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
57,483.10
17,256.75
84,991.82
570,000.00
261,220.00
35,685.00
76,305.00
37,800.00
7,000.00
166,863.10
9,580.52
1,324,185.29
1,324,180.00
=
=
=
=
Rp
Rp
Rp
Rp
46,500.00
7,600.00
1,040.00
41,400.00
###
###
###
###
###
###
Jumlah A
Rp
96,540.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
13,650.00
28,000.00
800.00
4,250.00
46,700.00
143,240.00
143,240.00
Rp
Rp
100,000.00
100,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
650.00
35,000.00
800.00
425.00
36,875.00
136,875.00
136,800.00
Rp
Rp
40,000.00
40,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
975.00
10,500.00
1,200.00
63.75
12,738.75
52,738.75
52,700.00
30,000.00
Rp
Rp
30,000.00
30,000.00
65,000.00
Rp
650.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
100,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
40,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
Rp
Rp
70,000.00 =
Rp
80,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
Rp
Rp
Rp
Rp
Rp
Rp
7,000.00
800.00
42.50
8,492.50
38,492.50
38,400.00
Rp
Rp
15,000.00
15,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
975.00
10,500.00
1,200.00
63.75
12,738.75
27,738.75
27,700.00
Rp
Rp
15,000.00
15,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,300.00
14,000.00
1,600.00
85.00
16,985.00
31,985.00
31,900.00
105,000.00
Rp
Rp
115,500.00
115,500.00
65,000.00
70,000.00
80,000.00
85,000.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
975.00
10,500.00
1,200.00
63.75
12,738.75
128,238.75
15,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
15,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
Rp
Rp
Rp
Rp
Jumlah B
Jumlah (A + B)
Rp
128,200.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
3,800.00
1,500.00
1,700.00
16,250.00
23,250.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,550.00
630.00
480.00
212.50
5,872.50
29,122.50
29,120.00
=
=
=
Rp
Rp
Rp
Rp
1,700.00
1,000.00
11,180.00
13,880.00
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,300.00
4,410.00
504.00
212.50
6,426.50
20,306.50
20,300.00
4,650.00
Rp
Rp
4,650.00
4,650.00
70,000.00
85,000.00
=
=
Rp
Rp
350.00
425.00
cat penutup)
Rp
Rp
Rp
Rp
Jumlah A
19,000.00
10,000.00
10,000.00
62,500.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
ps cat penutup)
Rp
Rp
Rp
Jumlah A
17,000.00
10,000.00
43,000.00
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Jumlah A
Rp
Rp
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
775.00
5,425.00
5,420.00
Rp
Rp
3,100.00
3,100.00
Rp
70,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan
Rp
Rp
Rp
Rp
Rp
350.00
425.00
775.00
3,875.00
3,870.00
Rp
Jumlah A
3,100.00
Kutacane, .. 2014
Direktur
:
:
:
I
1
2
3
4
UPAH
Mandor
Kepala Tukang Kayu/Batu/Besi/Cat
Tukang Kayu/Batu/Besi/Cat
Pekerja
II
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
BAHAN/MATERIAL
KELOMPOK MATERIAL ALAM
Air Bersih
Batu Bata
Batu Kali
Beton Rooster/Terawang
Kerikil
Kerikil (berat jenis = 1350 Kg/m3)
Pasir Beton (berat jenis = 1400 Kg/m3)
Pasir Beton / Kerikil
Pasir Cor
Pasir Pasang
Pasir Urug
Semen PC
Semen PC 50 Kg
Tanah Timbun
B
1
2
3
4
5
6
7
6
7
Lem Kayu
Listplank GRC L = 20 cm
HARGA (Rp.)
120,000.00
100,000.00
90,000.00
65,000.00
100.00
500.00
125,000.00
225,000.00
103.70
100.00
170,000.00
170,000.00
150,000.00
100,000.00
1,220.00
61,000.00
75,000.00
3,000,000.00
35,000.00
3,700,000.00
2,800,000.00
2,800,000.00
4,000,000.00
17,500,000.00
27,500.00
45,000.00
8
9
10
Triplek 9 mm
Triplek 3 mm
List Kayu
160,000.00
60,000.00
15,000.00
C
1
2
3
4
5
6
7
8
9
10
11
12
13
75,000.00
12,500.00
46,000.00
7,666.67
200.00
13,300.00
650.00
19,300.00
17,500.00
35,000.00
75,000.00
7,000.00
500.00
D
1
2
25,000.00
68,000.00
E
1
2
3
4
5
6
7
10,000.00
62,500.00
19,000.00
43,000.00
17,000.00
10,000.00
3,500.00
F
1
2
3
4
5
6
30,000.00
40,000.00
15,000.00
15,000.00
105,000.00
100,000.00
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
285,000.00
25,000.00
14,000.00
7,000.00
120,000.00
64,000.00
193,000.00
32,166.67
105,000.00
17,500.00
68,000.00
11,333.33
130,000.00
21,666.67
H
1
2
3
4
5
6
7
74,500.00
23,000.00
35,000.00
12,000.00
35,000.00
155,000.00
165,000.00
Kutacane, .. 2014
Direktur
AN
SAT.
Orang
Orang
Orang
Orang
Liter
Bh
M
Bh
M
Kg
Kg
M
M
M
M
Kg
Zak
M
M
Batang
M
M
M
M
M
Kg
M
Lembar
Lembar
M
Btg
M
Btg
M
Bh
Kg
Bh
Kg
Kg
Kg
m1
m1
bh
Lembar
Lembar
Kg
Kg
Kg
Kg
Liter
Kg
Kg
Bh
Bh
Bh
Bh
M
Bh
0.014
1
71.42857
3928571
Bh
Bh
Kg
Bh
Bh
Bh
Batang
M
Batang
M
Batang
M
Batang
M
Bh
Batang
Bh
Bh
Bh
Rol
Bh
.. 2014