Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 50

NO

PEKERJAAN
1 TANAH
GALIAN PONDASI FOOTPLAT

1.4

GALIAN PONDASI BT KALI

15
10
3.5
2
7
3
4
4

1
1
1
1
1
1
1
1

0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

GALIAN PONDASI BT BATA

4
5
1
11

0.8
0.5
0.5
0.5

0.3
0.3
0.3
0.3

0.1

15
10
3.5
2
7
3
4
4

1
1
1
1
1
1
1
1

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

BT BATA

4
5
1
11

0.8
0.5
0.5
0.5

0.1
0.1
0.1
0.1

LANTAI

15
3
3
4

10
4
5
1

0.1
0.1
0.1
0.1

114.66

13.77

57.39

20
3

10
5

0.5
0.5

PASIR URUG
FOOTPLAT
BATU KALI

URUGAN KEMBALI
URUGAN PENINGGIAN

P
2 PONDASI
PONDASI BATU KALI

15
15
10
3.5
2
7
3
4
4

0.46
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42

0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7

ANSTAMPENG

15
10
3.5
2
7
3
4
4

1
1
1
1
1
1
1
1

0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2

PONDASI BATA

4
5
1
11

0.8
0.3
0.3
0.3

0.6
0.5
0.5
0.5

P
3 DINDING
BATU BATA

PLESTERAN

15
10
3.5
2
7
3
4
4

1
1
1
1
1
1
1
1

4
4
4
4
4
4
4
4

15
7
3.5
4
3
5
4
4

1
1
1
1
1
1
1
1

4
4
4
4
4
4
4
4

ACIAN

P
4 BETON
SLOOF 20/40

10
14

0.4
0.4

0.2
0.2

SLOOF 15/20

3.5
5
4
2
5

0.15
0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2
0.2

BALOK 20/40

10
13
8
7
6
1.5

0.4
0.4
0.4
0.4
0.4
0.4

0.2
0.2
0.2
0.2
0.2
0.2

BALOK 20/30

2
10
5
4
3
10

0.3
0.3
0.3
0.3
0.3
0.3

0.2
0.2
0.2
0.2
0.2
0.2

BALOK 15/20

2
3.5
3
2

0.3
0.3
0.3
0.3

0.2
0.2
0.2
0.2

13
11.5
4
10
8.5
32
9

0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.2
0.2
0.2
0.2
0.2
0.2
0.2

BALOK 15/25

0.15

0.25

KOLOM 20/20

0.2

0.2

KOLOM 15/20

0.15

0.2

KOLOM 15/15

0.15

0.15

RING BALOK 15/20

KOLOM 15/45
FOOTPLAT
PLAT 15CM

TANGGA

PLAT 10 CM

TALANG

PLAT 5 CM
RABAT

4
9

0.15
0.15

0.15
0.15

0.15

0.15

0.2

97.25
3
3
2
2
2

1
0.2
1.2
1
1.5
3.65

0.15
0.15
0.15
0.15
0.15
0.15

3
2.4
1.35
2.85
2
0.5
13
8

1
1
1
1
2.5
5
1
1

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.2

0.05

0.05

P
5 KUSEN&PINTU
KUSEN ALLUMUNIUM
PINTU

JENDELA

2.24
2.24
2.24
2.24
2.54

0.8
1.3
0.7
1.22
2.8

2.2
2.2
2.2
2.2
2.2

1.78
5.34
14
5.84
0.76

0.6
2.54
5.36
3.81
2.24

0
0
0
0
0

DAUN PINTU KAYU

2.2
2.2
2.5

0.8
1.3
2.8

0.03
0.03
0.03

DAUN PINTU ALLUMUNIUM

2.2

0.7

0.03

DAUN JENDELA KAYU

35.2

0.7

0.03

KACA JENDELA O,5 CM

1.56
1.75
1.7
1
1.34

0.45
0.87
2.4
0.5
0.47

1
1
1
1
1

KACA SUSU O,5 CM

1.82

0.44

2.2

1.22

KACA BENING 1 CM

0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85

0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56

1
1
1
1
1
1
1
1
1
1

HOLLO 4/4

2.65
2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85
0.8

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

HOLLO 2/4

2.65

KACA BENING O,5 CM

2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
3.25
2.65
2.25
1.24
2.85

1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1

7 PLAFON
13
2
1
7

P
8 ATAP
GALVALUM

GENTENG

LT2

20/20

1
1
1
1

13
3.5
3

10
5
2

1
1
1

6.17
6.17
3.5
3.5

13
10
5
3

1.84
2
1
3.5

P
9 LANTAI
60/60
LT1

10
4
1
2

11
2
1
0.3
0.2
11
2
1

10
4
2
2
2
10
4
2

1
1
1
1
1
1
1
1

1.5

BALKON

4.5

5.5

DINDING 20/40

1.5
2
1.5
2

3
3
2.2
2.2

1
1
1
1

0.78

2.28

JUMLAH

TOTAL

ALL

25

35

3
1
2
1
2
3
1
1

36
8
5.6
1.6
11.2
7.2
3.2
3.2

SAT.

35 M3

76 M3
1
1
2
1

0.96
0.75
0.3
1.65
3.66 M3

25

2.5

3
1
2
1
2
3
1
1

4.5
1
0.7
0.2
1.4
0.9
0.4
0.4
9.5
0.32
0.25
0.1
1.1
1.77
12.8
1.2
1.5
0.4
15.9

1
1
2
2
1
1
1
1

1
1

29.67 M3
43.5 M3

100
7.5
49 M3

JUMLAH

TOTAL
2
1
1
2
1
2
3
1
1

ALL

SAT.

9.66
4.41
2.94
2.058
0.588
4.116
2.646
1.176
1.176
28.77 M3

3
1
2
1
2
3
1
1

9
2
1.4
0.4
2.8
1.8
0.8
0.8

1
1
2
1

1.92
0.75
0.3
1.65

19 M3

4.62

JUMLAH

TOTAL

ALL

3
1
2
1
2
3
1
1

180
40
28
8
56
36
16
16

2
1
1
1
4
2
2
1

120
28
14
16
48
40
32
16

SAT.

642.3718 m2
1236.236

1236.236

JUMLAH

TOTAL
6
4

ALL

4.8
4.48
9.28
0.21
0.15
0.12
0.12
0.3
0.9
4
2.08
0.64
0.56
0.48
0.24
8
0.72
0.6
0.9
0.48
0.36
0.6
3.66
0.12
0.42
0.18
0.12
0.84
0.78
0.345
0.12
0.6
0.255
0.96
0.27
3.33
0.7875

15

2.4

10

1.2

21

1.89

2
1
1
2
2
5
2
1
1
1
2
6
1
3
2
2
1
1
2
1
1
2
1
1
2
1
1
1

SAT.

32
2
6

2.88
0.405
5.175
0.54

25

1
1
1
1
1
2

14.5875
0.09
0.54
0.3
0.45
2.19
18.1575

2
2
2
1
1
1
2
1

0.6
0.48
0.27
0.285
0.5
0.25
2.6
0.8
5.785

0.08

0.75
60.135

JUMLAH

TOTAL

ALL

SAT.

9
2
5
2
1

47.16
11.48
25.7
11.32
7.54
95.66

16.128
5.824
7.84
5.4656
7.112
95.66 35.2576

5
1
1
1
1

23.8
7.88
19.36
9.65
3
63.69

5.34
2.2606
4.69
4.08
16.3706
63.69

51.6282

9
2
1

0.4752
7.06
5.33
12.8652
5
14.65

12.8652
14.65

6.6528

6.6528

9
6
1
2
4

6.318
9.135
4.08
1
2.5192
23.0522

23.0522

3.2032

3.2032

5.368

5.368

1
1
1
1
1
2
1
1
1
1

0.448
0.84
0.9128
2.52
1.652
3.64
1.484
1.26
0.6944
1.596
15.0472

15.0472

2.65
2.25
1.24
2.85
0.8
1.5
1.63
4.5
2.95
6.5
2.65
2.25
1.24
2.85
13.6
49.46

49.46

1
1
1
1
1
1
1
1
1
2
1
1
1
1
17

5.3

2
2
2
2
2
2
2
2
2
2
2
2
2

JUMLAH

4.5
2.48
5.7
1.6
3
3.26
9
5.9
6.5
5.3
4.5
2.48
5.7
65.22
TOTAL

1
1
1
1

65.22
ALL

SAT.

130
8
1
14
123

JUMLAH

TOTAL
1
1
1

ALL

SAT.

130
17.5
6
153.5

2
1
2
4

91.5628
61.7
17.5
45.5
216.2628

JUMLAH

TOTAL
1
1
2
40
40
1
1
2

ALL
110
8
4
24
16
110
8
4
284
244.25

15

SAT.

24.75

4
4
2
2

18
24
6.6
8.8
57.4
8.892

48.508

DAFTAR ANALISA SATUAN PEKERJAAN


A.

PEKERJAAN PERSIAPAN
1 M Pengukuran dan pemasangan bowplank (Eff. 2x)
A. Bahan
Kayu 5/7
0.010
M3
Paku 2" - 5"
0.020
Kg
Kayu Papan 2/20
0.005
M3
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.100
0.100
0.010
0.005

OH
OH
OH
OH

x
x
x

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


1 M2 Membersihkan lapangan dan perataan
A. Tenaga Kerja
Pekerja
0.100
Mandor
0.050

OH
OH

x
x
Jumlah Harga Per Satuan Pekerjaan

B.

PEKERJAAN TANAH
1 M3 Galian tanah biasa sedalam 1 meter
A. Tenaga Kerja
Pekerja
0.7500
Mandor
0.0250

OH
OH

x
x
Jumlah Harga Per Satuan Pekerjaan

1 M3 Mengurug kembali galian


Mengurug kembali 1 M3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
Jumlah Harga Per Satuan Pekerjaan
1 M3 Mengurug pasir urug
A. Bahan
Pasir Urug
B.

Tenaga Kerja

1.2000

M3

Pekerja
Mandor

0.3000
0.0100

OH
OH

x
x

Jumlah Harga Per Satuan Pekerjaan


1 M3 Mengurug tanah timbun untuk peninggian lantai
A. Bahan
Tanah Timbun
1.2000
M3
B.

Tenaga Kerja
Pekerja
Mandor

0.2500
0.0250

OH
OH

x
x

Jumlah Harga Per Satuan Pekerjaan


C.

PEKERJAAN PONDASI
1 M3 Memasang pondasi batu kali, campuran 1 PC : 4 PP
A. Bahan
Batu Kali
1.2000
M3
Portland Cement
163.0000
Kg
Pasir Pasang
0.5200
M3
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

x
x
x

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


1 M3 Memasang Aanstampeng
A. Bahan
Batu Kali
Pasir Urug
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.2000
0.4300

0.7800
0.3900
0.0390
0.0390

M3
M3

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


D.

PEKERJAAN DINDING
1 M2 Memasang dinding batu bata tebal 1/2 bata, camp. spesi 1 PC : 6 PP
A. Bahan
Bata Merah
x
70.0000 Bh
Portland Cement
x
0.1660 Kg
Pasir Pasang
x
0.0430 M3
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3500
0.1200
0.0100
0.0150

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


1 M2 Memasang dinding batu bata tebal 1/2 bata, camp. spesi 1 PC : 2 PP
A. Bahan
Bata Merah
x
70.0000 Bh
Portland Cement
x
0.3790 Kg
Pasir Pasang
x
0.0380 M3
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3200
0.1000
0.0100
0.0150

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


E.

PEKERJAAN PLESTERAN
1 M2 Membuat plesteran 1 PC : 4 PP, tebal 15 mm
A. Bahan
Portland Cement
6.2400
Pasir Pasang
0.0240
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

Kg
M3

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


F.

PEKERJAAN KUSEN
1 M1 Memasang Kusen Allumunium 4'
A. Bahan

B.

Aluminium
Sekrup fixer
Sealant

1.1000
2.0000
0.0600

M'
bh
tube

x
x
x

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


G

PEKERJAAN PINTU DAN JENDELA


1 M2 Membuat dan memasang daun pintu panel, kayu jati
A. Bahan
Papan Kayu
0.0400
M3
x
Lem Kayu
0.5000
Kg
x
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000
3.0000
0.3000
0.0500

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


1 M2 Membuat dan memasang frame utk jendela kaca, kayu kelas II
A. Bahan
Papan Kayu
0.0240
M3
x
Lem Kayu
0.3000
Kg
x
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang

0.8000
2.4000
0.2400

OH
OH
OH

x
x
x

Mandor

0.0400

OH

Jumlah Harga Per Satuan Pekerjaan


PK. 20 - SNI 3434:2008
1 M2 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II
A. Bahan
Kaso-kaso (3 x 5) cm
0.0163
M3
x
Paku
0.2500
Kg
x
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.3000
0.0300
0.0100

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


PK. 22.a - SNI 3434:2008
1 M' Memasang lisplank GRC lebar 20 cm
A. Bahan
GRC
1.0200
Paku Kait
0.0500
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.2000
0.0200
0.0050

M1
Kg

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan

PLL. 05 - SNI 2839:2008


1 M2 Memasang plafond tripleks uk. (120 x 240) cm, tebal 3 mm
A. Bahan
Tripleks
0.3750
Lbr
x
Paku
0.0300
Kg
x
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


PLL. 10 - SNI 2839:2008
1 M' Memasang list langit-langit kayu profil
A. Bahan
List Kayu Profil
1.0500
Paku
0.0100
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0500
0.0500
0.0050
0.0030

M'
Kg

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


G.

PEKERJAAN BETON/BETON BERTULANG


PB. 02 - SNI 7394:2008
1 M3 Membuat beton mutu f'c = 9.8 Mpa (K 125), slump (12 2) cm, w/c = 0.78
A. Bahan
Portland Cement
276.000
Kg
x
Pasir Beton
828.000
Kg
x
Kerikil (maks. 30 mm)
1012.000
Kg
x
Air
215.000
Ltr
x
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.650
0.275
0.028
0.083

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


CATATAN :
Bobot isi pasir
Bobot isi kerikil
Bukling factor pasir

1400.000 Kg/m3
1350.000 Kg/m3
0.200

PB. 04 - SNI 7394:2008


1 M3 Membuat lantai kerja beton mutu f'c = 7.4 Mpa (K 100), slump (3 - 6) cm, w/c = 0.87
A. Bahan
Portland Cement
230.000
Kg
x

Pasir Beton
Kerikil (maks. 30 mm)
Air
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

893.000
1027.000
200.000

Kg
Kg
Ltr

x
x
x

1.200
0.200
0.020
0.060

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


PB. 17 - SNI 7394:2008
10 Kg Pembesian dengan besi polos
A. Bahan
Besi Beton (Polos/Ulir)
Kawat Beton
B.

Tenaga Kerja
Pekerja
Tukang Besi
Kepala Tukang
Mandor

10.500
0.150

Kg
Kg

x
x

0.070
0.070
0.007
0.004

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


1 Kg

Pembesian dengan besi polos

PB. 21 - SNI 7394:2008


1 M2 Memasang bekisting untuk sloof
A. Bahan
Kayu Kelas III
0.045
Paku 5 cm - 10 cm
0.300
Minyak Bekisting
0.100
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.520
0.260
0.026
0.026

M3
Kg
Ltr

x
x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


PPL. 27 - SNI 2837:2008
1 M2 Membuat acian lantai

A.

B.

Bahan
Portland Cement

3.2500

Kg

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


PB. 38 - SNI. SUPLEMEN
1 M3 Membuat sloof 15/15 (beton K-125, 149 kg besi polos)
Pek. Beton K-125
1.000
M3
x
Pek. Besi Beton Polos
149.000
Kg
x
Pek. Bekisting Sloof
6.667
M2
x
(eff. 2x)
Jumlah Harga Per Satuan Pekerjaan
PB. 43 - SNI. SUPLEMEN
1 M3 Membuat kolom praktis 13/13 (beton K-125, 192 kg besi polos)
Pek. Beton K-125
1.000
M3
x
Pek. Besi Beton Polos
192.000
Kg
x
Pek. Bekisting Kolom
7.692
M2
x
(eff. 2x)
Jumlah Harga Per Satuan Pekerjaan
PB. 50 - SNI. SUPLEMEN
1 M3 Membuat ring balok 13/15 (beton K-125, 170 kg besi polos)
Pek. Beton K-125
1.000
M3
x
Pek. Besi Beton Polos
170.000
Kg
x
Pek. Bekisting Balok
6.667
M2
x
(eff. 2x)
Jumlah Harga Per Satuan Pekerjaan
H.

PEKERJAAN PENUTUP ATAP


PA. 09 SNI-03-3436-2002
1 M2 Memasang atap seng gelombang
A. Bahan
Seng Gelombang BJLS 0, 0.7000
Paku " - 1"
0.0200
B.

Tenaga Kerja
Pekerja
Tukang Kayu

0.1200
0.0600

lbr
kg

x
x

OH
OH

x
x

Kepala Tukang
Mandor

0.0060
0.0060

OH
OH

x
x

Jumlah Harga Per Satuan Pekerjaan


PA. 21 SUPL. SNI
1 M Memasang bubungan seng 0.2 polos
A. Bahan
Bubung Seng Polos
1.1500
Paku asbes
0.0350
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0500
0.0500
0.0050
0.0025

lbr
kg

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


I.

PEKERJAAN LANGIT-LANGIT
PLL. 05 - SNI 2839:2008
1 M2 Memasang plafond tripleks uk. (120 x 240) cm, tebal 3 mm
A. Bahan
Tripleks
0.3750
Lbr
x
Paku
0.0300
Kg
x
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


I.

PEKERJAAN SANITASI
03. SANITASI SNI
1 Bh Memasang kloset jongkok
A. Bahan
Kloset Jongkok
Bata Merah 5 x 12 x 22 c
Portland Cement (PC)
Pasir Pasang

1.0000
7.0000
6.0000
0.0100

bh
bh
kg
m

x
x
x
x

B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000
1.5000
0.3000
0.1100

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


23. SANITASI SNI
1 M Memasang pipa PVC tipe AW "
A. Bahan
Pipa PVC dia. 3/4"
1.2000
Perlengkapan
0.3500
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0360
0.0600
0.0060
0.0018

M
%

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


28. SANITASI SNI
1 M Memasang pipa PVC tipe AW 3"
A. Bahan
Pipa PVC dia. 3"
1.2000
Perlengkapan
0.3500
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0810
0.1350
0.0135
0.0041

M
%

x
x

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


31. SANITASI SNI
1 Bh Memasang kran " atau "
A. Bahan
Kran Air
Seal Tape
B.

Tenaga Kerja

1.0000
0.0250

bh
bh

x
x

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


32. SANITASI SNI
1 Bh Memasang floor drain
A. Bahan
Floor drain
B.

Tenaga Kerja
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000

bh

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


37. SUPL. SANITASI SNI
1 Bh Membuat septic tank dari buis beton dia. 80 cm (rumah tipe kecil)
Galian Tanah
1.1300
m
x
Urugan Pasir urug
0.1050
m
x
Lantai kerja beton
0.1130
m
x
Buis Beton dia. 80 cm
2.0000
bh
x
Plat beton penutup
0.0400
m
x
Pipa GIP 1 1/2"
0.5000
m'
x
Galian tanah resapan
1.5000
m
x
Pasang Ijuk
2.7000
kg
x
Urugan kerikil 3-5 cm.
0.5000
m
x
Pipa PVC 4" AW Berlubang
1.6300
m'
x
Urugan kembali
0.5650
m
x
Jumlah Harga Per Satuan Pekerjaan
J.

PEKERJAAN BESI DAN ALLUMINIUM


PBA. 21 SUPL. SNI
1 M2 Pasang Kuda-kuda baja ringan + reng
A. Bahan
C-75 , 0.6
3.7200
Baut (screw driver)
38.0000
Dynabolt
1.6000
Reng
5.4000

m'
bh
bh
m'

x
x
x
x

B.

Tenaga Kerja
Pekerja
Tukang
Kepala Tukang
Mandor

0.2100
0.4000
0.0100
0.0500

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


K.

PEKERJAAN KUNCI DAN KACA


02. KK. SNI
1 BH Memasang kunci tanam biasa
A. Bahan
Kunci Tanam Biasa
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000

bh

0.0100
0.5000
0.0100
0.0050

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


04. KK. SNI
1 BH Memasang engsel pintu
A. Bahan
Engsel Kuningan 4"
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000

bh

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


05. KK. SNI
1 BH Memasang engsel jendela kupu-kupu
A. Bahan
Engsel Kuningan 3"
1.0000
B.

Tenaga Kerja
Pekerja

0.0100

bh

OH

Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.0100
0.0005

OH
OH
OH

x
x
x

Jumlah Harga Per Satuan Pekerjaan


06. KK. SNI
1 BH Memasang kait angin
A. Bahan
Kait Angin
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000

bh

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


07. KK. SNI
1 BH Memasang kunci selot
A. Bahan
Kunci Selot / Gerendel
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000

bh

0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


11. KK. SNI
1 M2 Memasang kaca; tebal 5 mm
A. Bahan
Kaca
B.

Tenaga Kerja
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.1000

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


L.

PEKERJAAN PENGECATAN
03. CAT SNI
1 M2 Mengecat bidang kayu baru (1 lps cat dsr, 2 lps cat penutup)
A. Bahan
Cat Meni
0.2000
kg
x
Plamir
0.1500
kg
x
Cat Dasar
0.1700
kg
x
Cat Penutup
0.2600
kg
x
B.

Tenaga Kerja
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.0090
0.0060
0.0025

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


08. CAT SNI
1 M2 Mengecat bidang tembok baru (1 lps cat dsr, 2 lps cat penutup)
A. Bahan
Plamir
0.1000
ltr
x
Cat Dasar
0.1000
kg
x
Cat Penutup
0.2600
kg
x
B.

Tenaga Kerja
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0200
0.0630
0.0063
0.0025

OH
OH
OH
OH

x
x
x
x

Jumlah Harga Per Satuan Pekerjaan


M.

PEKERJAAN ELEKTRIKAL
0.1 PIL SNI
1 M Pasang kabel NYM 3 x 1.5 mm
A. Bahan

B.

Kabel NYA/NYM 3 x 1.5 mm

1.000

Tenaga Kerja
Tukang
Mandor

0.005
0.005

OH
OH

x
x

Jumlah Harga Per Satuan Pekerjaan


0.3 PIL SNI
1 M Pasang kabel NYM 2 x 1.5 mm
A. Bahan

B.

Kabel NYA/NYM 2 x 1.5 mm

1.000

Tenaga Kerja
Tukang
Mandor

0.005
0.005

OH
OH

x
x

Jumlah Harga Per Satuan Pekerjaan

A SATUAN PEKERJAAN

Rp
Rp
Rp
Jumlah A

4,000,000.00
17,500.00
2,800,000.00

=
=
=

Rp
Rp
Rp
Rp

40,000.00
350.00
14,000.00
54,350.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
9,000.00
1,000.00
600.00
17,100.00
71,450.00
71,450.00

Rp
65,000.00 =
Rp
120,000.00 =
Jumlah (A)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp

6,500.00
6,000.00
12,500.00
12,500.00

Rp
65,000.00 =
Rp
120,000.00 =
Jumlah A
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp

48,750.00
3,000.00
51,750.00
51,750.00

Rp

17,250.00

Rp
Rp

120,000.00
120,000.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

i dari indeks pekerjaan galian


Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

100,000.00

Rp
65,000.00 =
Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

19,500.00
1,200.00
20,700.00
140,700.00
140,700.00

Rp
Rp

90,000.00
90,000.00

Rp
65,000.00 =
Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

16,250.00
3,000.00
19,250.00
109,250.00
109,250.00

=
=
=

Rp
Rp
Rp
Rp

150,000.00
198,860.00
78,000.00
426,860.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

97,500.00
67,500.00
7,500.00
9,000.00
181,500.00
608,360.00
608,360.00

Rp
Jumlah A

Rp
Rp
Rp
Jumlah A

75,000.00

125,000.00
1,220.00
150,000.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

125,000.00
100,000.00

=
=

Rp
Rp
Rp

150,000.00
43,000.00
193,000.00

Rp
Rp
Rp
Rp
Jumlah B
Jumlah (A + B)

65,000.00
90,000.00
100,000.00
120,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

50,700.00
35,100.00
3,900.00
4,680.00
94,380.00
287,380.00

Jumlah Harga Per Satuan Pekerjaan

Rp

287,380.00

=
=
=

Rp
Rp
Rp
Rp

35,000.00
202.52
6,450.00
41,652.52

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,750.00
10,800.00
1,000.00
1,800.00
36,350.00
78,002.52
78,002.52

=
=
=

Rp
Rp
Rp
Rp

35,000.00
462.38
5,700.00
41,162.38

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,800.00
9,000.00
1,000.00
1,800.00
32,600.00
73,762.38
73,762.38

1,220.00
150,000.00

=
=

Rp
Rp
Rp

7,612.80
3,600.00
11,212.80

65,000.00
90,000.00
100,000.00
120,000.00

=
=
=
=

Rp
Rp
Rp
Rp

19,500.00
13,500.00
1,500.00
1,800.00

mp. spesi 1 PC : 6 PP
Rp
Rp
Rp
Jumlah A

500.00
1,220.00
150,000.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

mp. spesi 1 PC : 2 PP
Rp
Rp
Rp
Jumlah A

500.00
1,220.00
150,000.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A
Rp
Rp
Rp
Rp

0.3790
0.0380

Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Jumlah A

Rp
Rp
Rp

36,300.00
47,512.80
47,512.80

Rp
Rp
Rp
Rp
s
Rp
Rp
Rp
Rp
Rp
Rp
Rp

82,500.00
1,000.00
420.00
83,920.00
2,795.00
3,870.00
430.00
252.00
7,347.00
91,267.00
91,267.00

=
=

Rp
Rp
Rp

700,000.00
13,750.00
713,750.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
270,000.00
30,000.00
6,000.00
371,000.00
1,084,750.00
1,084,750.00

17,500,000.00
27,500.00

=
=

Rp
Rp
Rp

420,000.00
8,250.00
428,250.00

65,000.00
90,000.00
100,000.00

=
=
=

Rp
Rp
Rp

52,000.00
216,000.00
24,000.00

75,000.00
500.00
7,000.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

17,500,000.00
27,500.00

Rp
65,000.00
Rp
90,000.00
Rp
100,000.00
Rp
120,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

=
=
=

=
=
=
=

a, kayu kelas II
Rp
Rp
Jumlah A
Rp
Rp
Rp

Rp
120,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp

4,800.00
296,800.00
725,050.00
725,050.00

=
=

Rp
Rp
Rp

60,310.00
5,750.00
66,060.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,000.00
21,000.00
2,400.00
850.00
37,250.00
103,310.00
103,310.00

=
=

Rp
Rp
Rp

45,900.00
1,750.00
47,650.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
14,000.00
1,600.00
425.00
22,525.00
70,175.00
70,170.00

60,000.00
23,000.00

=
=

Rp
Rp
Rp

22,500.00
690.00
23,190.00

65,000.00
70,000.00
80,000.00
85,000.00

=
=
=
=

Rp
Rp
Rp
Rp

6,500.00
7,000.00
800.00
425.00

yu kelas II
Rp
Rp
Jumlah A

3,700,000.00
23,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

45,000.00
35,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

tebal 3 mm
Rp
Rp
Jumlah A
Rp
Rp
Rp
Rp

Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

15,000.00
22,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp

14,725.00
37,915.00
37,910.00

=
=

Rp
Rp
Rp

15,750.00
220.00
15,970.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,250.00
3,500.00
400.00
255.00
7,405.00
23,375.00
23,370.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp

407,100.00
82,800.00
104,948.15
21,500.00
616,348.15

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

107,250.00
19,250.00
2,240.00
7,055.00
135,795.00
752,143.15
752,140.00

Rp

339,250.00

mp (12 2) cm, w/c = 0.78


Rp
Rp
Rp
Rp
Jumlah A

1,475.00
100.00
103.70
100.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

K 100), slump (3 - 6) cm, w/c = 0.87


Rp

1,475.00

Rp
Rp
Rp
Jumlah A

100.00
103.70
100.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

13,300.00
19,300.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Jumlah A

3,000,000.00
23,000.00
3,500.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

=
=
=

Rp
Rp
Rp
Rp

89,300.00
106,503.70
20,000.00
555,053.70

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

78,000.00
14,000.00
1,600.00
5,100.00
98,700.00
653,753.70
653,750.00

=
=

Rp
Rp
Rp

139,650.00
2,895.00
142,545.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,550.00
4,900.00
560.00
340.00
10,350.00
152,895.00
152,890.00
15,289.00

=
=
=

Rp
Rp
Rp
Rp

135,000.00
6,900.00
350.00
142,250.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

33,800.00
18,200.00
2,080.00
2,210.00
56,290.00
198,540.00
198,540.00

Rp
Jumlah A

1,475.00

Rp
Rp

4,793.75
4,793.75

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,000.00
7,000.00
800.00
850.00
21,650.00
26,443.75
26,440.00

Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

752,140.00
2,278,061.00
1,323,600.00
4,353,801.00
4,353,800.00

kg besi polos)
Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

752,140.00
2,935,488.00
1,527,230.77
5,214,858.77
5,214,850.00

besi polos)
Rp
752,140.00 =
Rp
15,289.00 =
Rp
198,540.00 =
Jumlah
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

752,140.00
2,599,130.00
1,323,600.00
4,674,870.00
4,674,870.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A
Rp
Rp

68,000.00
23,000.00

=
=

Rp
Rp
Rp

47,600.00
460.00
48,060.00

65,000.00
70,000.00

=
=

Rp
Rp

7,800.00
4,200.00

Rp
80,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

25,000.00
23,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

480.00
510.00
12,990.00
61,050.00
61,050.00

=
=

Rp
Rp
Rp

28,750.00
805.00
29,555.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,250.00
3,500.00
400.00
212.50
7,362.50
36,917.50
36,910.00

=
=

Rp
Rp
Rp

22,500.00
690.00
23,190.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
7,000.00
800.00
425.00
14,725.00
37,915.00
37,910.00

=
=
=
=

Rp
Rp
Rp
Rp

120,000.00
4,550.00
8,850.00
1,450.00

tebal 3 mm
Rp
Rp
Jumlah A

60,000.00
23,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp

120,000.00
650.00
1,475.00
145,000.00

Jumlah A
Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

11,333.33
11,333.33

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

17,500.00
17,500.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Jumlah A

64,000.00
7,000.00

Rp

134,850.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
105,000.00
24,000.00
9,350.00
203,350.00
338,200.00
338,200.00

=
=

Rp
Rp
Rp

13,600.00
3,966.67
17,566.67

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,340.00
4,200.00
480.00
153.00
7,173.00
24,739.67
24,730.00

=
=

Rp
Rp
Rp

21,000.00
6,125.00
27,125.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,265.00
9,450.00
1,080.00
348.50
16,143.50
43,268.50
43,260.00

=
=

Rp
Rp
Rp

64,000.00
175.00
64,175.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

25,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

(rumah tipe kecil)


Rp
50,870.00
Rp
164,350.00
Rp
752,140.00
Rp
285,000.00
Rp
6,530,500.00
Rp
71,370.00
Rp
50,870.00
Rp
14,000.00
Rp
14,000.00
Rp
102,370.00
Rp
16,956.67
Jumlah A
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp

12,500.00
200.00
650.00
7,666.67

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

650.00
7,000.00
800.00
425.00
8,875.00
73,050.00
73,050.00

Rp
Rp

25,000.00
25,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

650.00
7,000.00
800.00
425.00
8,875.00
33,875.00
33,870.00

=
=
=
=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,483.10
17,256.75
84,991.82
570,000.00
261,220.00
35,685.00
76,305.00
37,800.00
7,000.00
166,863.10
9,580.52
1,324,185.29
1,324,180.00

=
=
=
=

Rp
Rp
Rp
Rp

46,500.00
7,600.00
1,040.00
41,400.00

###

###
###

###
###
###

Jumlah A

Rp

96,540.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,650.00
28,000.00
800.00
4,250.00
46,700.00
143,240.00
143,240.00

Rp
Rp

100,000.00
100,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

650.00
35,000.00
800.00
425.00
36,875.00
136,875.00
136,800.00

Rp
Rp

40,000.00
40,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

975.00
10,500.00
1,200.00
63.75
12,738.75
52,738.75
52,700.00

30,000.00

Rp
Rp

30,000.00
30,000.00

65,000.00

Rp

650.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

100,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

40,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A
Rp

Rp
70,000.00 =
Rp
80,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

Rp
Rp
Rp
Rp
Rp
Rp

7,000.00
800.00
42.50
8,492.50
38,492.50
38,400.00

Rp
Rp

15,000.00
15,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

975.00
10,500.00
1,200.00
63.75
12,738.75
27,738.75
27,700.00

Rp
Rp

15,000.00
15,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,300.00
14,000.00
1,600.00
85.00
16,985.00
31,985.00
31,900.00

105,000.00

Rp
Rp

115,500.00
115,500.00

65,000.00
70,000.00
80,000.00
85,000.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

975.00
10,500.00
1,200.00
63.75
12,738.75
128,238.75

15,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A

15,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A
Rp
Rp
Rp
Rp
Jumlah B
Jumlah (A + B)

Jumlah Harga Per Satuan Pekerjaan

Rp

128,200.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp

3,800.00
1,500.00
1,700.00
16,250.00
23,250.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,550.00
630.00
480.00
212.50
5,872.50
29,122.50
29,120.00

=
=
=

Rp
Rp
Rp
Rp

1,700.00
1,000.00
11,180.00
13,880.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,300.00
4,410.00
504.00
212.50
6,426.50
20,306.50
20,300.00

4,650.00

Rp
Rp

4,650.00
4,650.00

70,000.00
85,000.00

=
=

Rp
Rp

350.00
425.00

cat penutup)
Rp
Rp
Rp
Rp
Jumlah A

19,000.00
10,000.00
10,000.00
62,500.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

ps cat penutup)
Rp
Rp
Rp
Jumlah A

17,000.00
10,000.00
43,000.00

Rp
65,000.00
Rp
70,000.00
Rp
80,000.00
Rp
85,000.00
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Jumlah A
Rp
Rp

Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp

775.00
5,425.00
5,420.00

Rp
Rp

3,100.00
3,100.00

Rp
70,000.00 =
Rp
85,000.00 =
Jumlah B
Jumlah (A + B)
Jumlah Harga Per Satuan Pekerjaan

Rp
Rp
Rp
Rp
Rp

350.00
425.00
775.00
3,875.00
3,870.00

Rp
Jumlah A

3,100.00

Kutacane, .. 2014

Direktur

DAFTAR HARGA UPAH DAN BAHAN


KEGIATAN
TAHUN
LOKASI
No.

:
:
:

PEMBANGUNAN RUMAH TINGGAL


2016
SURABAYA
NAMA UPAH/BAHAN

I
1
2
3
4

UPAH
Mandor
Kepala Tukang Kayu/Batu/Besi/Cat
Tukang Kayu/Batu/Besi/Cat
Pekerja

II
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN/MATERIAL
KELOMPOK MATERIAL ALAM
Air Bersih
Batu Bata
Batu Kali
Beton Rooster/Terawang
Kerikil
Kerikil (berat jenis = 1350 Kg/m3)
Pasir Beton (berat jenis = 1400 Kg/m3)
Pasir Beton / Kerikil
Pasir Cor
Pasir Pasang
Pasir Urug
Semen PC
Semen PC 50 Kg
Tanah Timbun

B
1
2
3
4
5
6
7

KELOMPOK MATERIAL KAYU


Kayu Bekisting Kelas III
Kayu Dolken Dia.8-10 Cm Panjang 4 Meter
Kayu Kelas II
Kayu Listplank
Kayu Meranti Papan 2 x 20 x 400 Cm
Kayu Meranti 5 x 7 x 400 Cm
Kayu jati 3 x 20

6
7

Lem Kayu
Listplank GRC L = 20 cm

HARGA (Rp.)

120,000.00
100,000.00
90,000.00
65,000.00

100.00
500.00
125,000.00
225,000.00
103.70
100.00
170,000.00
170,000.00
150,000.00
100,000.00
1,220.00
61,000.00
75,000.00

3,000,000.00
35,000.00
3,700,000.00
2,800,000.00
2,800,000.00
4,000,000.00
17,500,000.00
27,500.00
45,000.00

8
9
10

Triplek 9 mm
Triplek 3 mm
List Kayu

160,000.00
60,000.00
15,000.00

C
1
2
3
4
5
6
7
8
9
10
11
12
13

KELOMPOK MATERIAL METAL/BESI/BAJA


Baja Ringan Canal C-75 0.6 p = 6 m
Baja Ringan Canal C-75 0.6 p = 6 m
Reng Baja Ringan AA-0.55 p = 6 m
Reng Baja Ringan AA-0.55 p = 6 m
Baut (screw driver)
Besi Beton Polos
Dynabolt
Kawat Beton
Paku Biasa
Paku Kait
kusen allumunium 4' hitam
sealant
skrup fixer

75,000.00
12,500.00
46,000.00
7,666.67
200.00
13,300.00
650.00
19,300.00
17,500.00
35,000.00
75,000.00
7,000.00
500.00

D
1
2

KELOMPOK MATERIAL ATAP


Bubungan seng 0,2 Polos
Seng Gelombang BJLS 0,2

25,000.00
68,000.00

E
1
2
3
4
5
6
7

KELOMPOK MATERIAL CAT


Cat Dasar Kayu
Cat Kayu Mengkilat
Cat Menie Kayu
Cat Tembok
Pernis
Plamir
Residu/Teer

10,000.00
62,500.00
19,000.00
43,000.00
17,000.00
10,000.00
3,500.00

F
1
2
3
4
5
6

KELOMPOK MATERIAL PINTU/JENDELA


Engsel Kuningan 2"
Engsel Kuningan 4"
Grendel 2 "
Hak Angin
Kaca Polos/Bening 5 mm
Kunci Tanam Biasa

30,000.00
40,000.00
15,000.00
15,000.00
105,000.00
100,000.00

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14

KELOMPOK MATERIAL SANITASI


Buis Beton 80 cm
Floor Drain
Ijuk Saringan
Isolatif Pipa
Kloset Jongkok
Kran
Pipa Leiding 1 1/2 " Galvanis Tebal 3.2 mm
Pipa Leiding 1 1/2 " Galvanis Tebal 3.2 mm
Pipa PVC 3" SNI
Pipa PVC 3" SNI
Pipa PVC 3/4" SNI
Pipa PVC 3/4" SNI
Pipa PVC 4" SNI
Pipa PVC 4" SNI

285,000.00
25,000.00
14,000.00
7,000.00
120,000.00
64,000.00
193,000.00
32,166.67
105,000.00
17,500.00
68,000.00
11,333.33
130,000.00
21,666.67

H
1
2
3
4
5
6
7

KELOMPOK MATERIAL ELEKTRIKAL


Box Sekring
Pipa Listrik
Saklar Ganda
Saklar Tunggal
Stop Kontak + Instalasi
Wayar NYA 1,5 mm
Zekering ( Kast Lolak 2 Zekering )

74,500.00
23,000.00
35,000.00
12,000.00
35,000.00
155,000.00
165,000.00

Kutacane, .. 2014

Direktur

AN

SAT.

Orang
Orang
Orang
Orang

Liter
Bh
M
Bh
M
Kg
Kg
M
M
M
M
Kg
Zak
M

M
Batang
M
M
M
M
M
Kg
M

Lembar
Lembar
M

Btg
M
Btg
M
Bh
Kg
Bh
Kg
Kg
Kg
m1
m1
bh

Lembar
Lembar

Kg
Kg
Kg
Kg
Liter
Kg
Kg

Bh
Bh
Bh
Bh
M
Bh

0.014
1

71.42857
3928571

Bh
Bh
Kg
Bh
Bh
Bh
Batang
M
Batang
M
Batang
M
Batang
M

Bh
Batang
Bh
Bh
Bh
Rol
Bh

.. 2014

You might also like