Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 17

RAJIV GANDHI SEA LINK

Bandra Worli Bridge

Prepared by:
Alfiya Vhora
Hardik Vaghela
Nirav Trivedi
Priya Khandelwal
Mehul Vithalani
Pallavi Yadav
Today’s Presentation

• Overview
• Inauguration
• Benefits
• Government and Rajiv Gandhi Sea link
Overview
• Design
• Construction
• Team Workforce
• About Sea Link
DESIGN
M/s Dar Consultant (U.K.) Ltd.
M/s Dar Consultant (India) Pvt. Ltd.
Construction
• Hindustan Construction Company
• China Harbour Engering corporation
TEAM WORK OF ENGINEERS
• INDIA
• BRITAIN
• CANADA
• CHINA
• HONG KONG
• INDONESIA
• SERBIA
• SINGAPORE
• PHILIPPINES
ABOUT RAJIV GANDHI SEA LINKS
Length of bridge (4.7km): 63 times the Qutub Minar

Weight of bridge (6.7L tones): 50,000 African elephants

424 cables for main roadway: can support 900 tons each

Concrete used: 2.3 lakh cubic meters

Height of main towers (126m): 43-storey building

Work force: 4,000 workers and 150 engineers


INAUGURATION CEREMONY
THE GOLDEN MOMENT
Benefits

•Savings in vehicle operating cost


•Savings in travel time due to increased speed and
reduced delays at intersections at existing roads.
•Ease in driving with reduced mental tension and overall
improvement in the quality of life.
•Improvement in environment especially in terms of
reduction in noise pollution.
•No adverse effect on fisheries, marine life and
livelihood of fisherman.
•Reduced accidents.
GOVERNMENT AND RAJI GANDHI SEA LINK
• Infrastructure
• Budget of the bridge
• Charges to commute on bridge
• Illogical statement by Government Officials
about certain issues related to bridge

You might also like