ANNEXUREC

C1SAMPLECALCULATIONFORDETERMINATIONOFFUEL
CONSUMPTIONFORATYPICALDAYFORSTEAMGENERATOR
TURBINEGENERATINGSTATION.
(A)DATA
1.InstalledCapacity
2.MainSteamParameters
3.Typeofcooling
4.Primaryfuel
(a)Monthlyweightedaverage
Characteristicsofcoalas
Receivedbasis
(i)Moisturecontent
(ii)AshContent
(iii)Hydrogencontent
(iv)GCV
5.(a)GCVofsecondaryfueloil
(b)DensityofSecondaryfueloil

2x130MW
130kg/cm(abs),535C/535C
ClosedCyclewithcoolingtower
Domesticcoal(runoffmine)

10%
35%
2.86%
4200kCal/kg
10,000kCal/kg
0.9kg/l

6.NetGeneration/day
5millionkWh
GuaranteedNetHeatRateofSteamTurbine
Generator
100

7(a)Loading(%)

7(b)GuaranteedNetHeatRate(kCal/kWh)
(asperEPCcontract)asperparaB1.12.1
2525
forash,moistureandhydrogencontentof
primaryfuel
(B)CALCULATIONS
1.Installedcapacity
2.NormativeAux.EnergyConsumption
at100%InstalledCapacity

80

60

50

2565

2680

2760

2x130MW=260MW
9%

3.NetInstalledCapacity

2x130(1009)=236.6MW
100

4.PLFbasedonnetgeneration

5x106x100=88.05%
236.6x103x24

5.PLFbasedongrossgenerationandauxiliaryEnergyconsumptionistobecalculatedby
iterationupto3:
Iteration
0
1
2
PLF

88.05

AECmultiplyingfactor
(fromtableatpara
1.1.5.1.3

0.08(100
1.0+0.08(10088.05) 0.08(10088.47) 88.46)

1.0+
1.0+
20
20

20
=1.0478
=1.0461
=1.04616

AEC(%)(fromtableat
para1.1.5.1

9x1.0478=9.4302

GrossGeneration(kWh) 5x106
1009.4302
100

88.47

88.46

9x1.0461=9.4149

9x1.04616=9.4154

5x106
1009.4149
100

5x106
1009.4154
100

RevisedPLF(%)

=5.52x106

=5.5197x106

=5.5197x106

5.52x106
260x24

5.5197x106
260x24

5.5197x106
260x24

=88.47

=88.46

=88.46

6.GrossHeatRateofSteamTurbine
Generator
NormativeGrossHeatRatefromtable
atPara1.1.4.1
7.GCVas'fired'basis:
GCVasreceivedbasis
GCVonasfiredbasis
(asperpara1.1.4.1.1)
Moisturecontentonasreceivedbasis
Moisturecontentonasfiredbasis
(asperpara1.1.4.1.1)

2080+(21202080)x10088.46
20
2103.08kCal/kWh
4200kCal/kg
4200100=4100kCal/kg
10%
10+1=11%

8.SteamGeneratorEfficiency:
92.5(50x35+630(11+9x2.86)
SteamGeneratorEfficiencyasperformula
4100
atpara1.1.4.1.1
=92.56.07=86.43%
9.NetHeatRate
NormativeGrossHeatRate
NormativeAux.EnergyConsumption
NormativeSteamGeneratorEfficiency
NormativeDailyNetHeatRate
(fromformulaatParaB1.12.1)
DailyNetHeatRatebasedon
guaranteedvalue
(fromitem7ofData)
DailyNetHeatRatebasedon
guaranteedvaluewith
degradationfactorof1.05
ApplicableDailyNetHeatRate

2103.08kCal/kWh
9.415%
86.43%
2103.08x100100
X=2686kCal/kWh
1009.41586.43
2525+(25652525)(10088.46)
20
=2548kCal/kWh
2548x1.05=2675kCal/kWh
2675kCal/kWh

10.HeatCreditofSecondaryFuelOil:
FuelConsumptionSpecificsecondary
fueloilconsumption(asperpara1.1.6)

Allowablefueloilconsumption
GCVoffueloil
Heatcontributionofsecondaryfueloil

1.0ml/grosskWh
1.0
=1.104ml/netkWh
1009.415
5x106x1.104
=5.52kl/day
106
10,000kCal/kg
5.52x10x0.9x10,000kCal/day
=49.71x106kCal/day
or0.0497x109kCal/day

11.Heatinputtogeneratingstation

5x106x2675kCal/day
=13.375x109kCal/day

12.Heatinputbycoal

(13.3750.0497)x109kCal/day
13.3253x109kCal/day

13.Coalconsumption
GCVofcoalonasfiredbasis

4100kCal/kg
13.3253x109
kg/day

CoalConsumption

14.Totalfuelconsumption

4100
=3.250x106kg/day
=3250.0tonnes/day
3250.0t/dayofcoal+5.52kl/dayof
SecondaryFuelOil

C2 SAMPLE CALCULATIONS FOR DETERMINATION OF FUEL


CONSUMPTIONFORASETTLEMENTPERIODFORCOMBINEDCYCLE
COMBUSTIONTURBINE(CCCT)GENERATINGSTATIONS
CASEI:NATURALGASASFUEL(FIRSTYEAROFOPERATION)
A)DATA
1.FirstyearInstalledCapacity

350MW(2x115MWCT+1x120MWST)

2.CombustionTurbineratingatISO
withNaturalgas

123MW

3.Typeofcooling

ClosedCyclewithcoolingTower

4.a)Fuel

NaturalGas

b)NCVoffuel

8500kCal/SM

5.NOxcontrolmeasure
(NOxemissionlevel50ppm)

Waterinjection

6.SettlementPeriod

1Hour

7.Netgenerationduringthe
SettlementPeriod

270830kWh

8.a)Loading

100%

80%

60%

50%

b)GuaranteedNetHeatRate(kCal/kWh)
asperEPCcontractforNaturalGaswith
waterinjectionundersiteambient
conditions

1800

1860

1990

2100

BCALCULATIONS
1.Installedcapacity

350MW

2.Normativeauxiliary
Energyconsumption

2.85%

3.GrossGenerationduringtheSettlement
Period

27083027830100
=x=278775kWh
(1002.85)97.15

100
278775X100=79.65%

4.SPLF

350X10

5. Net Heat Rate for the Settlement Period


(SNHR):
5.1 Normative Net Heat Rate for the
Settlementperiod
(a)NormativeGrossHeatRate(GHR)under 1730+(18501730)X(8079.65)
ISOconditionsasperpara1.1.3.2.1
20
correspondingtoSPLFof79.65%with
=1732.10kCal/kWh
NaturalGasasfuel.

b)Adjustmentforwaterinjectionasper
Note2under1.1.3.2.1

100kCal/kWh

c) Normative GHR under site ambient


conditions(ReferB2.5.2.1)
(Assuming 1.025 as a factor based on
(1732.10+100x1.025)
manufacturer'scurvesfordeviationsofsite
=1877.90kCal/kWh
ambient conditions (temperature, relative
humidity, atmospheric pressure, condenser
vacuum)fromISOconditions
1877.90x100
d)NormativeNetheatrateforthe
SettlementPeriod

1002.85
=1932.99kCal/kWh

5.2NetHeatratefortheSettlementPeriod {1860+(19901860)x(8079.65)}1.035
20
basedonguaranteedvalue(Item8ofdata)
=1927.45kCal/kWh
5.3ApplicableNetheatrate(SNHR)forthe
1927.45kCal/kWh
settlementperiod
6. Fuel consumption during the Settlement
Period
6.1Heatinput

270830x1927.45kCal
=522.011x106kCal

6.2NCVofNaturalGasitem4(b)ofdata

8500kCal/Sm

6.3GasconsumptionduringtheSettlement 522.011x106=0.061413x106Sm
Period
8500

CASEII:NATURALGASASFUEL(FOURTHYEAROFOPERATION)
A)DATA
1.FirstyearInstalledCapacity

350MW(2x115MWCT+1x120MWST)

2. Combustion Turbine rating at ISO with


123MW
NaturalGas
3.TypeofCooling

ClosedCyclewithcoolingTower

4.a)Fuel

NaturalGas

b)NCVoffuel

8500kCal/SM

5.NOxcontrolmeasure
(Noxemissionlevel50ppm)

Waterinjection

6.SettlementPeriod

1hour

7.Netgenerationduringthesettlement
period

264570kWh

8.a)Loading

100%

80%

60%

50%

b)GuaranteedNetHeatrate(kCal/kWh)
asperEPCcontractforNaturalGaswith
waterinjectionundersiteambient
conditions

1800

1860

1990

2100

BCALCULATIONS
1.a)Installedcapacity

350MW

b)Capacitydegradationfactorfor4thyear

0.9775

c)4thyearInstalledCapacity

350x0.9775=342.125MW

2.Normativeauxiliaryenergyconsumption 2.85%
3.GrossGenerationduringtheSettlement
Period

264570264570
=x100=272331kWh
(1002.85)97.5

100

4.SPLF

272331X100=79.60%
342.125X10

5. Net Heat Rate for the Settlement Period


(SNHR)
5.1 Normative Net Heat Rate for the
Settlementperiod
(a)NormativeGrossHeatRate(GHR)under
1730+(18501730)x(8079.6)
ISOconditionsasperpara1.1.4.2.1
20
corresponding
=1732.40kCal./kWh
toSPLFof79.60%withNaturalGasasfuel
b)Adjustmentforwaterinjectionasper
Note2under1.1.4.2.1

100kCal/kWh

c) Normative GHR under site ambient


conditions(ReferB2.5.2.1)
(assuming 1.025 as a factor based on
(1732.40+100)x1.025
manufacturer'scurvesfordeviationsofsite
=1878.21kCal/kWh
ambient conditions (temperature, relative
humidity, atmospheric pressure, condenser
vacuum)fromISOconditions
c)NormativeNetheatrateforthe
SettlementPeriod

1878.21x100
1002.85
=1933.31kCal/kWh

5.2NetHeatratefortheSettlementPeriod {1860+19901860x(8079.60)}1.035
basedonguaranteedvalue
20
(Item8ofdata)
=1927.79kCal/kWh
5.3ApplicableNetHeatRate(SNHR)forthe
1927.79kCal/kWh
settlementperiod
6.FuelconsumptionduringtheSettlement
Period
6.1Heatinput

264570x1927.79kCal
=510.035x106kCal

6.2NCVofNaturalGasitem4(b)ofdata

8500kCal/Sm

6
6.3GasconsumptionduringtheSettlement 510.035x10
8500
Period
=0.060004x106Sm

CASEIII:NAPHTAASFUEL(FIRSTYEAROFOPERATION)
A)DATA
1.FirstyearInstalledCapacity

680MW(2x225MWCT+1x230ST)

2.CombustionTurbineratingatISOwith
NaturalGas

240MW

3.TypeofCooling

Oncethroughsystem

4.a)Fuel

Naphtha

b)NCVoffuel

10500kCal/kg

5.NOxcontrolmeasure
(NOxemissionlevel75ppm)

Waterinjection

6.SettlementPeriod

1hour

7. Net generation during the Settlement


562370kWh
Period
8.a)Loading

100%

b)GuaranteedNetHeatrate(kCal/kWh) as
per EPC contract for Naphtha with water 1700
injectionundersiteambientconditions

80%

60%

50%

1750

1850

1950

BCALCULATIONS
1.a)Installedcapacity

680MW

2.NormativeauxiliaryenergyConsumption 2.75%
3.GrossGenerationduringtheSettlement
Period

562370562370100
=x=578272kWh
(1002.75)97.25

100

4.SPLF

578272X100=85.04%
680X10

5.NetHeatRatefortheSettlementPeriod
(SNHR)
5.1 Normative Net Heat Rate for the
SettlementPeriod
(a)NormativeGrossHeatRate(GHR)under
1580+(163001580)X10085.04
ISOconditionsasperpara1.1.4.2.1
20
corresponding
=1617.40kCal/kWh
toSPLFof85.04%withNaturalGasasfuel.
(b)NormativeGrossHeatRate(GHR)under 1617.40x1.02
=1649.75kCal/kWh
ISOconditionswithNaphthaasfuel
(c)Adjustmentforwaterinjectionasper
Note2underpara1.1.4.2.1

50kCal/kWhforemissionlevel
100ppm
=50x100kCal/kWhforemissionlevel
75of75ppm
=66.67kCal/KWh

d)NormativeGHRundersiteambient
Conditions(Refer1.1.4.2.1)
(Assuming1.025asafactorbasedon
manufacturer'scurvesfordeviationsofsite (1649.75+66.67)x1.025
=1759.33kCal/kWh
ambientconditions(temperaturerelative
humidity,atmosphericpressure,condenser
vaccum)fromISOconditions
e)NormativeNetHeatRateforthe
SettlementPeriod

1759.33x100
1002.75
=1809.08kCal/kWh

5.2NetHeatRatefortheSettlementPeriod {1700+(17501700)x(10085.04)}1.035
basedonguaranteedvalue
20
(Item8ofdata)
=1798.21kCal/kWh
5.3ApplicableNetHeatRate(SNHR)forthe
1798.21kCal/kWh
SettlementPeriod

6. Fuel Consumption during the Settlement


Period
6.1Heatinput

562370x1798.21kCal
=1011.259x106kCal

6.2NCVofNaphtha
(Item4(b)ofdata)

10500kCal/Sm3

6.3Naphthaconsumptionduringthe
settlementperiod

1011.259x106
10500
=0.096310x106Kg
=96.310tonnes