Definitions of Thermal Power Station 2
Definitions of Thermal Power Station 2
Definitions of Thermal Power Station 2
C1SAMPLECALCULATIONFORDETERMINATIONOFFUEL
CONSUMPTIONFORATYPICALDAYFORSTEAMGENERATOR
TURBINEGENERATINGSTATION.
(A)DATA
1.InstalledCapacity
2.MainSteamParameters
3.Typeofcooling
4.Primaryfuel
(a)Monthlyweightedaverage
Characteristicsofcoalas
Receivedbasis
(i)Moisturecontent
(ii)AshContent
(iii)Hydrogencontent
(iv)GCV
5.(a)GCVofsecondaryfueloil
(b)DensityofSecondaryfueloil
2x130MW
130kg/cm(abs),535C/535C
ClosedCyclewithcoolingtower
Domesticcoal(runoffmine)
10%
35%
2.86%
4200kCal/kg
10,000kCal/kg
0.9kg/l
6.NetGeneration/day
5millionkWh
GuaranteedNetHeatRateofSteamTurbine
Generator
100
7(a)Loading(%)
7(b)GuaranteedNetHeatRate(kCal/kWh)
(asperEPCcontract)asperparaB1.12.1
2525
forash,moistureandhydrogencontentof
primaryfuel
(B)CALCULATIONS
1.Installedcapacity
2.NormativeAux.EnergyConsumption
at100%InstalledCapacity
80
60
50
2565
2680
2760
2x130MW=260MW
9%
3.NetInstalledCapacity
2x130(1009)=236.6MW
100
4.PLFbasedonnetgeneration
5x106x100=88.05%
236.6x103x24
5.PLFbasedongrossgenerationandauxiliaryEnergyconsumptionistobecalculatedby
iterationupto3:
Iteration
0
1
2
PLF
88.05
AECmultiplyingfactor
(fromtableatpara
1.1.5.1.3
0.08(100
1.0+0.08(10088.05) 0.08(10088.47) 88.46)
1.0+
1.0+
20
20
20
=1.0478
=1.0461
=1.04616
AEC(%)(fromtableat
para1.1.5.1
9x1.0478=9.4302
GrossGeneration(kWh) 5x106
1009.4302
100
88.47
88.46
9x1.0461=9.4149
9x1.04616=9.4154
5x106
1009.4149
100
5x106
1009.4154
100
RevisedPLF(%)
=5.52x106
=5.5197x106
=5.5197x106
5.52x106
260x24
5.5197x106
260x24
5.5197x106
260x24
=88.47
=88.46
=88.46
6.GrossHeatRateofSteamTurbine
Generator
NormativeGrossHeatRatefromtable
atPara1.1.4.1
7.GCVas'fired'basis:
GCVasreceivedbasis
GCVonasfiredbasis
(asperpara1.1.4.1.1)
Moisturecontentonasreceivedbasis
Moisturecontentonasfiredbasis
(asperpara1.1.4.1.1)
2080+(21202080)x10088.46
20
2103.08kCal/kWh
4200kCal/kg
4200100=4100kCal/kg
10%
10+1=11%
8.SteamGeneratorEfficiency:
92.5(50x35+630(11+9x2.86)
SteamGeneratorEfficiencyasperformula
4100
atpara1.1.4.1.1
=92.56.07=86.43%
9.NetHeatRate
NormativeGrossHeatRate
NormativeAux.EnergyConsumption
NormativeSteamGeneratorEfficiency
NormativeDailyNetHeatRate
(fromformulaatParaB1.12.1)
DailyNetHeatRatebasedon
guaranteedvalue
(fromitem7ofData)
DailyNetHeatRatebasedon
guaranteedvaluewith
degradationfactorof1.05
ApplicableDailyNetHeatRate
2103.08kCal/kWh
9.415%
86.43%
2103.08x100100
X=2686kCal/kWh
1009.41586.43
2525+(25652525)(10088.46)
20
=2548kCal/kWh
2548x1.05=2675kCal/kWh
2675kCal/kWh
10.HeatCreditofSecondaryFuelOil:
FuelConsumptionSpecificsecondary
fueloilconsumption(asperpara1.1.6)
Allowablefueloilconsumption
GCVoffueloil
Heatcontributionofsecondaryfueloil
1.0ml/grosskWh
1.0
=1.104ml/netkWh
1009.415
5x106x1.104
=5.52kl/day
106
10,000kCal/kg
5.52x10x0.9x10,000kCal/day
=49.71x106kCal/day
or0.0497x109kCal/day
11.Heatinputtogeneratingstation
5x106x2675kCal/day
=13.375x109kCal/day
12.Heatinputbycoal
(13.3750.0497)x109kCal/day
13.3253x109kCal/day
13.Coalconsumption
GCVofcoalonasfiredbasis
4100kCal/kg
13.3253x109
kg/day
CoalConsumption
14.Totalfuelconsumption
4100
=3.250x106kg/day
=3250.0tonnes/day
3250.0t/dayofcoal+5.52kl/dayof
SecondaryFuelOil
350MW(2x115MWCT+1x120MWST)
2.CombustionTurbineratingatISO
withNaturalgas
123MW
3.Typeofcooling
ClosedCyclewithcoolingTower
4.a)Fuel
NaturalGas
b)NCVoffuel
8500kCal/SM
5.NOxcontrolmeasure
(NOxemissionlevel50ppm)
Waterinjection
6.SettlementPeriod
1Hour
7.Netgenerationduringthe
SettlementPeriod
270830kWh
8.a)Loading
100%
80%
60%
50%
b)GuaranteedNetHeatRate(kCal/kWh)
asperEPCcontractforNaturalGaswith
waterinjectionundersiteambient
conditions
1800
1860
1990
2100
BCALCULATIONS
1.Installedcapacity
350MW
2.Normativeauxiliary
Energyconsumption
2.85%
3.GrossGenerationduringtheSettlement
Period
27083027830100
=x=278775kWh
(1002.85)97.15
100
278775X100=79.65%
4.SPLF
350X10
b)Adjustmentforwaterinjectionasper
Note2under1.1.3.2.1
100kCal/kWh
1002.85
=1932.99kCal/kWh
5.2NetHeatratefortheSettlementPeriod {1860+(19901860)x(8079.65)}1.035
20
basedonguaranteedvalue(Item8ofdata)
=1927.45kCal/kWh
5.3ApplicableNetheatrate(SNHR)forthe
1927.45kCal/kWh
settlementperiod
6. Fuel consumption during the Settlement
Period
6.1Heatinput
270830x1927.45kCal
=522.011x106kCal
6.2NCVofNaturalGasitem4(b)ofdata
8500kCal/Sm
6.3GasconsumptionduringtheSettlement 522.011x106=0.061413x106Sm
Period
8500
CASEII:NATURALGASASFUEL(FOURTHYEAROFOPERATION)
A)DATA
1.FirstyearInstalledCapacity
350MW(2x115MWCT+1x120MWST)
ClosedCyclewithcoolingTower
4.a)Fuel
NaturalGas
b)NCVoffuel
8500kCal/SM
5.NOxcontrolmeasure
(Noxemissionlevel50ppm)
Waterinjection
6.SettlementPeriod
1hour
7.Netgenerationduringthesettlement
period
264570kWh
8.a)Loading
100%
80%
60%
50%
b)GuaranteedNetHeatrate(kCal/kWh)
asperEPCcontractforNaturalGaswith
waterinjectionundersiteambient
conditions
1800
1860
1990
2100
BCALCULATIONS
1.a)Installedcapacity
350MW
b)Capacitydegradationfactorfor4thyear
0.9775
c)4thyearInstalledCapacity
350x0.9775=342.125MW
2.Normativeauxiliaryenergyconsumption 2.85%
3.GrossGenerationduringtheSettlement
Period
264570264570
=x100=272331kWh
(1002.85)97.5
100
4.SPLF
272331X100=79.60%
342.125X10
100kCal/kWh
1878.21x100
1002.85
=1933.31kCal/kWh
5.2NetHeatratefortheSettlementPeriod {1860+19901860x(8079.60)}1.035
basedonguaranteedvalue
20
(Item8ofdata)
=1927.79kCal/kWh
5.3ApplicableNetHeatRate(SNHR)forthe
1927.79kCal/kWh
settlementperiod
6.FuelconsumptionduringtheSettlement
Period
6.1Heatinput
264570x1927.79kCal
=510.035x106kCal
6.2NCVofNaturalGasitem4(b)ofdata
8500kCal/Sm
6
6.3GasconsumptionduringtheSettlement 510.035x10
8500
Period
=0.060004x106Sm
CASEIII:NAPHTAASFUEL(FIRSTYEAROFOPERATION)
A)DATA
1.FirstyearInstalledCapacity
680MW(2x225MWCT+1x230ST)
2.CombustionTurbineratingatISOwith
NaturalGas
240MW
3.TypeofCooling
Oncethroughsystem
4.a)Fuel
Naphtha
b)NCVoffuel
10500kCal/kg
5.NOxcontrolmeasure
(NOxemissionlevel75ppm)
Waterinjection
6.SettlementPeriod
1hour
100%
b)GuaranteedNetHeatrate(kCal/kWh) as
per EPC contract for Naphtha with water 1700
injectionundersiteambientconditions
80%
60%
50%
1750
1850
1950
BCALCULATIONS
1.a)Installedcapacity
680MW
2.NormativeauxiliaryenergyConsumption 2.75%
3.GrossGenerationduringtheSettlement
Period
562370562370100
=x=578272kWh
(1002.75)97.25
100
4.SPLF
578272X100=85.04%
680X10
5.NetHeatRatefortheSettlementPeriod
(SNHR)
5.1 Normative Net Heat Rate for the
SettlementPeriod
(a)NormativeGrossHeatRate(GHR)under
1580+(163001580)X10085.04
ISOconditionsasperpara1.1.4.2.1
20
corresponding
=1617.40kCal/kWh
toSPLFof85.04%withNaturalGasasfuel.
(b)NormativeGrossHeatRate(GHR)under 1617.40x1.02
=1649.75kCal/kWh
ISOconditionswithNaphthaasfuel
(c)Adjustmentforwaterinjectionasper
Note2underpara1.1.4.2.1
50kCal/kWhforemissionlevel
100ppm
=50x100kCal/kWhforemissionlevel
75of75ppm
=66.67kCal/KWh
d)NormativeGHRundersiteambient
Conditions(Refer1.1.4.2.1)
(Assuming1.025asafactorbasedon
manufacturer'scurvesfordeviationsofsite (1649.75+66.67)x1.025
=1759.33kCal/kWh
ambientconditions(temperaturerelative
humidity,atmosphericpressure,condenser
vaccum)fromISOconditions
e)NormativeNetHeatRateforthe
SettlementPeriod
1759.33x100
1002.75
=1809.08kCal/kWh
5.2NetHeatRatefortheSettlementPeriod {1700+(17501700)x(10085.04)}1.035
basedonguaranteedvalue
20
(Item8ofdata)
=1798.21kCal/kWh
5.3ApplicableNetHeatRate(SNHR)forthe
1798.21kCal/kWh
SettlementPeriod
562370x1798.21kCal
=1011.259x106kCal
6.2NCVofNaphtha
(Item4(b)ofdata)
10500kCal/Sm3
6.3Naphthaconsumptionduringthe
settlementperiod
1011.259x106
10500
=0.096310x106Kg
=96.310tonnes
[NextPage]