ERECTION OF CONTROL AND RELAY PANEL- BUSBAR PROTECTION

Project
:

Rating:

Locatio
n

Make:

FQAP/I
TP No:

Drawin
g no:

Relay Name

Zone-I

S.
No

Zone-II

Start
Date/Time
:
Finish
Date/Time
:
Contracto
r:
Check Zone..

Description of Check
Check Operate Value/Reset Value/Operate Timing for all phases
Zone-I
Zone-II

ii
iii

iv

vi

vii
viii
ix
x
xi

Check Zone
Block Auto-reclose for all CBs Connected Zone-I
Zone-II
If directional Element provided ,Relay tested & Direction found
O.K
Test results enclosed & accepted
Zone-I Tripping extended to :
Trip relay Location . For CB No ..LBB
Initiated
PLCC/D.T.
Trip relay Location . For CB No ..LBB
Initiated
PLCC/D.T.
Zone-II Tripping extended to :
Trip relay Location . For CB No ..LBB
Initiated
PLCC/D.T.
Trip relay Location . For CB No ..LBB
Initiated
PLCC/D.T.
LBB/BFR trip checked & extended to Zone-I
From CB No.
From CB No.
From CB No.
LBB/BFR trip checked & extended to Zone-II
From CB No.
From CB No.
From CB No.
Transfer Bus Trip Checked
Close Interlock in case of BB Trip Checked for all applicable CBs
RESET Working properly
DC selection working properly for DC-I & II

Format Number: F-CO-QA-02

Effective Date: 10.10.2015

Please Tick
Appropriate
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK

Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
OK/ NOT OK
OK/ NOT OK
OK/ NOT OK
OK/
OK/
OK/
OK/

NOT
NOT
NOT
NOT

Yes/ No
Yes/ No

Page |1

OK
OK
OK
OK

ERECTION OF CONTROL AND RELAY PANEL- BUSBAR PROTECTION


xii
xiii

xiv

Carry out stability test by simulating external and internal faults


by primary injection and measure spill currents in Bus bar diff.
relay
Verify stabilizing resistor & Metrosil connection(wherever
applicable)

OK/ NOT OK
OK/ NOT OK

Check for CT switching relay operation, in case of DMT scheme


by closing respective isolators. Also inject current at the relay
panel entry point and measure current at Bus Bar protection relay
terminals after operating respective CT switching relay.

OK/ NOT OK