T207 - CONSTRUCTION OF TUNNELS FROM CROSSOVER TUNNELS TO SPRINGLEAF STATION

FOR THOMSON LINE

DOCUMENT REVIEW & RESPONSE

Reply to Comments on:

Comment Codes
= No Comments
1 = Minor Importance
2 = Moderate Importance
3 = Major Importance

28-Oct-2015

DAR No:

T207/DES/0079/-

Issue Date:

16 APR 2015

Review Dept :

LTA

Date Received:

19 MAY 2015

Subject:

Design Calculation of Temporary Road Crossing Support

S/N

Dwg/Doc No

No.

Comments

Code

Response from Contractor

General Comments

1.1 Please see attached for QPS comments

Noted.

FT207RTS-TMP4009-

2.1 1. In conclusion, beam size is stated to be

1. Please follow drawing and calculation beam size of

350x650mm, however, in calculation and drawings,

350x600mm.

beam size is 350x600mm. Please clarify.


2. Slab length used in calculation is 1.975m, please

2. Slab length is taken from centre of support. It shall be

confirm if the length is taken from centre of support.

2.15m. See attached revised calculation.

3. Dimension of crossing support to be shown

3. The required dimension of crossing support was shown in

clearly in plan.

the section. Full length of it may varies depend on site


condition that is why we dont put dimension on plan.

4. Please provide connection details between

4. Based on the calculated settlement, crossing support will

ramp/lean concrete and crossing support to

settle about 8.56mm which will not affect vehicle movement.

minimize differential settlement.

We will make sure that the soil will be compacted properly to


minimise settlement.

Page 1 of 2

T207 - CONSTRUCTION OF TUNNELS FROM CROSSOVER TUNNELS TO SPRINGLEAF STATION


FOR THOMSON LINE

DOCUMENT REVIEW & RESPONSE

DAR No:

T207/DES/0079/-

Issue Date:

16 APR 2015

Review Dept :

QP(S)

Date Received:

19 MAY 2015

Subject:

Design Calculation of Temporary Road Crossing Support

S/N
1

Dwg/Doc No

Comments

Code

Response from Contractor

DOC/T207/DES/CA/0053

1. We have no adverse comments on your submission.

1. Noted.

F/T207/CWD/TMP/4009

2. COS to be submitted after the endorsing PE inspected

2. Noted. COS to provide.

3. Noted.

the completed work


3. Please ensure compliance with all relevant codes, LTA
design criteria, M&W specifications, construction
drawings, statutory regulations and obligations under
the contract.