Professional Documents
Culture Documents
Layering Structure J038-CGC
Layering Structure J038-CGC
Layering Structure J038-CGC
LAYERING STRUCTURE
MAIN STRUCTURES
o COLOUM&BRACING
o TOP PART
o SECOND PART
SUB STRUCTURE (EVERYTHING WHICH IS SEPARATED FROM MAIN STRUCTURE)
o STRUCTURE_1
STAIR
HANDRAIL
SUPPORT
o STRUCTURE_2
STAIR
HANDRAIL
SUPPORT
OTHER STRUCTURES, INCL :
o PIPE SUPP
o EQP SUPP
o INSTRUMENT SUPP
o HVAC SUPP
o ELECTRIC SUPP
o LADDER
o INSTRUMENT :
INST. EQUI
INST. BOARD
o HANDRAIL
EXTERNAL HANDRAIL (MAIN STRUCTURE HANDRAIL)
o EQUIPMENT PLATFORM (SKID)
o PLATFORM PLANES (FLOOR)
GRATING PLANE ( SUB STRUCTURE FLOOR)
BOUNDARY PLANE ( MAIN STRUCTURE FLOOR)
LIGHTING
INDICATOR & OTHERS
CABLETRAYS
ELECTRIC BOX (PANELS)
MOTOR (PUMPS)
DUCT#01
DUCT#02 etc..
SAFETY#02 etc..
PIPES
o LINE#001
o LINE#002 etc..
INCOMPLETE LINES
o LINES#001
o LINES#002 etc..
EQUIPMENT#001
EQUIPMENT#002 etc..
INSTRUMENT
- FIRE & SAFETY (for FIRE FIGHTING ROUTING PIPE) (LFM Color B1)
-
LINE#001
LINE#002