Project

Location
Flr./Level
Designed by

:
:
:
:

DESIGN OF SQUARE FOOTING


INPUT DATA
Concrete strength, (Fc') =

20.70 Mpa

Footing thk., (t) =

Yield strength, (Fy) =

275.00 Mpa

Deformed Bar, () =

Allow. Soil Pressure,(qa) =

100.00 Kpa

Column size, X-axis,(CX) =


Column size, Y-axis,(CY) =
Soil unit weight,() =
Min. ht. from NGL,(h) =

LOADS
Dead load, (PD)=
Live load, (PL)=
PT = 1.10PD + PL=

qnet = qa - (h)-d) =
AReq'd= PT/qa =
Let, B=L= AReq'd =
Adopted Width, (B)=
Adopted Length, (L)=
Actual Supplied Area =

TRIAL FOOTING THICKNESS

250.00
500.00
16.00
1.50

300.0
16

mm
mm
Kn/m3

160.00 Kn
70.00 Kn
246.00 Kn
68.80
3.58 m2
1.89 m

CHECK FOR BEAM SHEAR


d = dAVE + f/2

1.90 m
1.90 m

= 217.0

mm

3.61 m2

Asupplied> Req'd Area

Pu = 1.2PD + 1.6PL=
qu = PU /Asupplied =

304.00 Kn
84.21 Kpa

qnet =

1.90
m.

84.21 Kpa

CHECK PUNCHING SHEAR


Effective depth,(de)=
209.00 mm
(Cx +de)=
459.00 mm
(Cy +de)=

709.00 mm

d
0.83

bo= 2,336.00 mm

REINFORCEMENT DESIG

Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =

276.6

Kn

Vcp =

fc'

bod =

3
Vu < Vc, Thickness Ok

629.36

R=

Mu
bde2

0.85fc'
Fy

0.002708

As = *B*de
= 10.05
USE

11

rebar spacing

Footing Mark F-1


Date :
Checked by:

Footing

HICKNESS
mm Thickness Ok
mm
Bending Moment along X-Axis
qu*L*[(B/2)-(Cx/2)]2
Mx=
2
=
54.45
Kn.m
GOVERNS
Bending Moment along Y-Axis
qu*B*[(L/2)-(Cy/2)]2
My=
2
=
39.20
Kn.m

###m.

To be safe, Vu Vc
Vu =

Vc =

97.280
f f'c
6

= 265.746
Vu < Vc,SAFE for Beam Shear
###

0.83

NFORCEMENT DESIGN

5.45E+07

7.47E+07
112R

0.72897

0.85fc'
0.002708

min

P < Pmin, Use Pmin


=

2,021.60 m2

pcs
16 mmars both ways
=

172.4 mm.

1.4
Fy

= 0.00509

Project
Location
Flr./Level
Designed by

:
:
:
:

DESIGN OF SQUARE FOOTING


INPUT DATA
Concrete strength, (Fc') =

20.70 Mpa

Footing thk., (t) =

Yield strength, (Fy) =

275.00 Mpa

Deformed Bar, () =

Allow. Soil Pressure,(qa) =

100.00 Kpa

Column size, X-axis,(CX) =


Column size, Y-axis,(CY) =
Soil unit weight,() =
Min. ht. from NGL,(h) =

LOADS
Dead load, (PD)=
Live load, (PL)=
PT = 1.10PD + PL=

qnet = qa - (h)-d) =
AReq'd= PT/qa =
Let, B=L= AReq'd =
Adopted Width, (B)=
Adopted Length, (L)=
Actual Supplied Area =

TRIAL FOOTING THICKNESS

250.00
500.00
16.00
1.50

300.0
16

mm
mm
Kn/m3

200.00 Kn
115.00 Kn
335.00 Kn
68.80
4.87 m2
2.21 m

CHECK FOR BEAM SHEAR


d = dAVE + f/2

2.30 m
2.30 m

= 217.0

mm

5.29 m2

Asupplied> Req'd Area

Pu = 1.2PD + 1.6PL=
qu = PU /Asupplied =

424.00 Kn
80.15 Kpa

qnet =

2.30
m.

80.15 Kpa

CHECK PUNCHING SHEAR


Effective depth,(de)=
209.00 mm
(Cx +de)=
459.00 mm
(Cy +de)=

709.00 mm

d
1.03

bo= 2,336.00 mm

REINFORCEMENT DESIG

Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =

397.9

Kn

Vcp =

fc'

bod =

3
Vu < Vc, Thickness Ok

629.36

R=

Mu
bde2

0.85fc'
Fy

0.004021

As = *B*de
= 12.17
USE

13

rebar spacing

Footing Mark F-2


Date :
Checked by:

Footing

HICKNESS
mm Thickness Ok
mm
Bending Moment along X-Axis
qu*L*[(B/2)-(Cx/2)]2
Mx=
2
=
96.84
Kn.m
GOVERNS
Bending Moment along Y-Axis
qu*B*[(L/2)-(Cy/2)]2
My=
2
=
74.66
Kn.m

###m.

To be safe, Vu Vc
Vu = 148.953

Vc =

f f'c
6

= 321.692
Vu < Vc,SAFE for Beam Shear
###

1.03

NFORCEMENT DESIGN

9.68E+07

9.04E+07
112R

1.07101

0.85fc'
0.004021

min

P < Pmin, Use Pmin


=

2,447.20 m2

pcs
16 mmars both ways
=

174.33 mm.

1.4
Fy

= 0.00509

Project
Location
Flr./Level
Designed by

:
:
:
:

DESIGN OF SQUARE FOOTING


INPUT DATA
Concrete strength, (Fc') =

20.70 Mpa

Footing thk., (t) =

Yield strength, (Fy) =

275.00 Mpa

Deformed Bar, () =

Allow. Soil Pressure,(qa) =

100.00 Kpa

Column size, X-axis,(CX) =


Column size, Y-axis,(CY) =
Soil unit weight,() =
Min. ht. from NGL,(h) =

LOADS
Dead load, (PD)=
Live load, (PL)=
PT = 1.10PD + PL=

qnet = qa - (h)-d) =
AReq'd= PT/qa =
Let, B=L= AReq'd =
Adopted Width, (B)=
Adopted Length, (L)=
Actual Supplied Area =

TRIAL FOOTING THICKNESS

250.00
500.00
16.00
1.50

300.0
16

mm
mm
Kn/m3

100.00 Kn
70.00 Kn
180.00 Kn
68.80
2.62 m2
1.62 m

CHECK FOR BEAM SHEAR


d = dAVE + f/2

1.70 m
1.70 m

= 217.0

mm

2.89 m2

Asupplied> Req'd Area

Pu = 1.2PD + 1.6PL=
qu = PU /Asupplied =

232.00 Kn
80.28 Kpa

qnet =

1.70
m.

80.28 Kpa

CHECK PUNCHING SHEAR


Effective depth,(de)=
209.00 mm
(Cx +de)=
459.00 mm
(Cy +de)=

709.00 mm

d
0.73

bo= 2,336.00 mm

REINFORCEMENT DESIG

Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =

205.9

Kn

Vcp =

fc'

bod =

3
Vu < Vc, Thickness Ok

629.36

R=

Mu
bde2

0.85fc'
Fy

0.001982

As = *B*de
=
USE

9.00
9

rebar spacing

Footing Mark F-3


Date :
Checked by:

Footing

HICKNESS
mm Thickness Ok
mm
Bending Moment along X-Axis
qu*L*[(B/2)-(Cx/2)]2
Mx=
2
=
35.87
Kn.m
GOVERNS
Bending Moment along Y-Axis
qu*B*[(L/2)-(Cy/2)]2
My=
2
=
24.56
Kn.m

###m.

To be safe, Vu Vc
Vu =

Vc =

69.327
f f'c
6

= 237.772
Vu < Vc,SAFE for Beam Shear
###

0.73

NFORCEMENT DESIGN

3.59E+07

6.68E+07
112R

0.53666

0.85fc'
0.001982

min

P < Pmin, Use Pmin


=

1,808.80 m2

pcs
16 mmars both ways
=

194.5 mm.

1.4
Fy

= 0.00509

You might also like