Professional Documents
Culture Documents
TDS Condor PDF
TDS Condor PDF
TDS Condor PDF
Sp09.NPTL.Vt-0025
COND-1
Technical Requirements
B.1.1
Owners
Requirement
a)
b)
c)
d)
e)
Type
Code Word
Calculated total cross-sectional area, mm2
Outer Layers
1.
Material
2.
Calculated Cross-sectional Area, mm2
3.
Stranding No./dia. No./mm
4.
Coefficient of Elongation (/C) 1
Core
1.
Material
f)
g)
h)
i)
j)
k)
l)
m)
B.1.2
2.
Calculated Cross-sectional Area, (mm )
3.
Stranding, No./Dia. No./mm
4.
Zinc coating (Class/g/m2)
5.
Coeff. Of Elongation (/C) 1
Conductor Overall Diameter, mm.
Rated Tensile Strength (RTS), kg
Rated DC Resistance at 20C, ohm/km 1
Initial Modulus of Elasticity, (kg/mm2 ) 1
Final Modulus of Elasticity, (kg/mm2) 1
Percent Elongation at Rated Strength, % 1
Permanent Elongation due to 10 year creep at 20% RTS
Conductor Coeff. Of Linear Expansion (/C) 1
52.19
7/3.081
N/A
12.6 x 10-6 /C
27.73 (approx.)
Not less than 12,600
0.06893
16,200
7470
0.37
500 m/m
20.5 x 10-6 /C
Right
277-361 mm
No
1460
2000 2%
CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation:
POWER CONDUCTOR
TECHNICAL DATA SHEETS
B.1.3
Sp09.NPTL.Vt-0025
COND-2
Cable Reel
Owners
Requirement
a)
b)
c)
B.1.4
b)
c)
B.2
d)
3
4
5
6
Filler Compounds
Yes
Yes
Yes
Yes
As required during
Stringing/
Construction4
As required during
Stringing/
Construction4
Wooden2
No
N/A
Material
Returnable, (Yes, No)
If yes, return within no. of months after installation
Yes5
Yes6
No
N/A
Spare conductors shall be at 100% metal reel. No spare conductors will be accepted if not in metal reels.
CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation:
POWER CONDUCTOR
TECHNICAL DATA SHEETS
B.2.1
Sp09.NPTL.Vt-0025
COND-3
B.3
B.3.1
Spare conductors are indicated in the Schedules of Prices for Spare Materials for this project. It is understood that these
spares will be used only by the Owner in case of damage or occurrence of defects of the conductors outside of the
warranty period. The Contractor therefore is obliged to provide sufficient quantities as replacements for failure or
damages during transport, storage, installation and stringing operation and during the duration of the warranty period.
B.4
Tools
B.4.1
No particular tools intended for the Owner will be required for the supply of power conductors. Tools and equipment
necessary for the installation and stringing of power conductors shall be the full responsibility of the Contractor and its
return to the country of origin if such tools and equipment would be sourced abroad, after the completion of the work.
B.5
Spares
The Contractor shall also provide spare conductor for the Project in the quantity of three (3) reels for 795 MCM
ACSR/AS. Except for the power conductors requirements which are all in wooden reels, the spare conductors shall be
in 100% metal reels. The Contractor is obliged to follow strictly this requirement. The Owner will not accept spare
conductors in wooden reels. The requirements for spare Power Conductors shall be included in the pay item for
Spares in the Bid Price Schedules. The cost shall be inclusive of all works required for the delivery and proper
storage at the designated storage areas for spare Power Conductor. The length of conductor per reel shall be 2000
meters.
C.
Conductors:
1.
Country of Origin
2.
Conductor Manufacturer
PHILIPPINES
___________________________________
___________________________________
PHELPS
DODGE PHILIPPINES ENERGY PRODUCTS CORP.
CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation: