POWER CONDUCTOR

TECHNICAL DATA SHEETS

Sp09.NPTL.Vt-0025
COND-1

Section 6: POWER CONDUCTOR


B.1

Technical Requirements

B.1.1

Technical Characteristics and Requirements

Owners
Requirement
a)
b)
c)
d)

e)

Type
Code Word
Calculated total cross-sectional area, mm2
Outer Layers
1.
Material
2.
Calculated Cross-sectional Area, mm2
3.
Stranding No./dia. No./mm
4.
Coefficient of Elongation (/C) 1
Core
1.
Material

795 MCM ACSR/AS


CONDOR
454.80 (approx.)
Aluminum
402.80 (approx.)
54/3.081
23 x 10-6 /C
Al. Clad Steel (AS)
2

f)
g)
h)
i)
j)
k)
l)
m)
B.1.2

2.
Calculated Cross-sectional Area, (mm )
3.
Stranding, No./Dia. No./mm
4.
Zinc coating (Class/g/m2)
5.
Coeff. Of Elongation (/C) 1
Conductor Overall Diameter, mm.
Rated Tensile Strength (RTS), kg
Rated DC Resistance at 20C, ohm/km 1
Initial Modulus of Elasticity, (kg/mm2 ) 1
Final Modulus of Elasticity, (kg/mm2) 1
Percent Elongation at Rated Strength, % 1
Permanent Elongation due to 10 year creep at 20% RTS
Conductor Coeff. Of Linear Expansion (/C) 1

52.19
7/3.081
N/A
12.6 x 10-6 /C
27.73 (approx.)
Not less than 12,600
0.06893
16,200
7470
0.37
500 m/m
20.5 x 10-6 /C

Other Technical Requirements


Owners
Requirement
a)
b)
c)
d)
e)

Conductor lay, (Right, Left)


Length of Lay (Outer Layer) mm. 1
Corrosion Inhibitor (Grease) Required? (Yes, No)
Weight of Conductor (kg/km) 1
Length Per Reel, m. 1

Right
277-361 mm
No
1460
2000 2%

Contractor to fill-up the required data.

CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation:

PHELPS DODGE PHILIPPINES ENERGY PRODUCTS CORP.


ABRAHAM V. SANCHEZ
Vice-President, Sales

POWER CONDUCTOR
TECHNICAL DATA SHEETS

B.1.3

Sp09.NPTL.Vt-0025
COND-2

Cable Reel
Owners
Requirement
a)
b)
c)

B.1.4

Accessories for Power Conductor


a)

b)

c)

B.2

d)

3
4
5
6

Compression splices suitable for the type of conductor to be used:


1.
Required (Yes, No)
2.
Compound, Pre-filled (Yes, No)
3.
Quantities 3
Compression repair assembly suitable for the type of conductor to be used:
1.
Required (Yes, No)
2.
Compound, Pre-filled (Yes, No)
3.
Quantities

Filler Compounds

Yes
Yes

Yes
Yes

As required during
Stringing/
Construction4
As required during
Stringing/
Construction4

Tests and Experience Requirements


a)
b)
c)

Wooden2
No
N/A

Material
Returnable, (Yes, No)
If yes, return within no. of months after installation

Stress-Strain Test and Report Required


Breaking Strength Test and Reports Required:
Factory Acceptance Tests (Routine Tests) to be witnessed by Owners
personnel:
Required no. of Owners personnel to witness test

Yes5
Yes6
No
N/A

Spare conductors shall be at 100% metal reel. No spare conductors will be accepted if not in metal reels.

Contractor to fill-up the required data.


Supply cost shall be included in the pay items of power conductors.
If Stress-Strain Test was already conducted as an identical conductors, same test on the conductors to be supplied may no longer conducted.
The Test Reports shall be submitted before manufacturing of the conductor
To be submitted before shipment of conductor.

CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation:

PHELPS DODGE PHILIPPINES ENERGY PRODUCTS CORP.


ABRAHAM V. SANCHEZ
Vice-President, Sales

POWER CONDUCTOR
TECHNICAL DATA SHEETS

B.2.1

Sp09.NPTL.Vt-0025
COND-3

Equipment and Manufacturers Experience


The Bidder shall select only from the list of Approved Manufacturers of Materials/Equipment.

B.3

Spares and Spare Parts

B.3.1

Spare conductors are indicated in the Schedules of Prices for Spare Materials for this project. It is understood that these
spares will be used only by the Owner in case of damage or occurrence of defects of the conductors outside of the
warranty period. The Contractor therefore is obliged to provide sufficient quantities as replacements for failure or
damages during transport, storage, installation and stringing operation and during the duration of the warranty period.

B.4

Tools

B.4.1

No particular tools intended for the Owner will be required for the supply of power conductors. Tools and equipment
necessary for the installation and stringing of power conductors shall be the full responsibility of the Contractor and its
return to the country of origin if such tools and equipment would be sourced abroad, after the completion of the work.

B.5

Spares
The Contractor shall also provide spare conductor for the Project in the quantity of three (3) reels for 795 MCM
ACSR/AS. Except for the power conductors requirements which are all in wooden reels, the spare conductors shall be
in 100% metal reels. The Contractor is obliged to follow strictly this requirement. The Owner will not accept spare
conductors in wooden reels. The requirements for spare Power Conductors shall be included in the pay item for
Spares in the Bid Price Schedules. The cost shall be inclusive of all works required for the delivery and proper
storage at the designated storage areas for spare Power Conductor. The length of conductor per reel shall be 2000
meters.

C.

Other Technical Data for the Conductors and Materials


Contractors Data
a)

Conductors:
1.
Country of Origin
2.
Conductor Manufacturer

PHILIPPINES
___________________________________
___________________________________
PHELPS
DODGE PHILIPPINES ENERGY PRODUCTS CORP.

CONFORME:
Name of Bidder:
Name & Signature of Bidder's Representative:
Designation:

PHELPS DODGE PHILIPPINES ENERGY PRODUCTS CORP.


ABRAHAM V. SANCHEZ
Vice-President, Sales

You might also like