F
pu
urposes only
01/01/2012
<1>
For training
F
pu
urposes only
01/01/2012
<2>
For training
F
pu
urposes only
Mechanical/Hydraulic Diagram
HCU
Hydraulic Cylinder Unit
HPS
Hydraulic Power Supply
BOLL filter
01/01/2012
<3>
For training
F
pu
urposes only
Dual cylinder
HCU
01/01/2012
<4>
For training
F
pu
urposes only
Safety block
01/01/2012
<5>
For training
F
pu
urposes only
H.p. pipe
connection
01/01/2012
<6>
For training
F
pu
urposes only
Accumulator
End cover
ELFI valve
Distribution block
3333572.2006.04.12
ME-B Hydraulic
Cylinder Unit
(2200/OZS)
01/01/2012
<7>
For training
F
pu
urposes only
01/01/2012
<8>
For training
F
pu
urposes only
01/01/2012
<9>
For training
F
pu
urposes only
01/01/2012
< 10 >
For training
F
pu
urposes only
01/01/2012
< 11 >
For training
F
pu
urposes only
Distribution Block
01/01/2012
< 12 >
For training
F
pu
urposes only
Distribution Block
01/01/2012
< 13 >
For training
F
pu
urposes only
Distribution Block
01/01/2012
< 14 >
For training
F
pu
urposes only
01/01/2012
< 15 >
For training
F
pu
urposes only
01/01/2012
< 16 >
For training
F
pu
urposes only
01/01/2012
< 17 >
For training
F
pu
urposes only
01/01/2012
< 18 >
For training
F
pu
urposes only
01/01/2012
< 19 >
For training
F
pu
urposes only
01/01/2012
< 20 >
For training
F
pu
urposes only
01/01/2012
< 21 >
For training
F
pu
urposes only
Fuel pump
plunger
l
Slide Fuel
valve
l
Fuel pump
Fuel oil inlet
8 bar
Hydraulic
piston
ELFI
Proportional
valve
To
drain
Membrane
accumulator
01/01/2012
< 22 >
For training
F
pu
urposes only
01/01/2012
< 23 >
For training
F
pu
urposes only
01/01/2012
< 24 >
For training
F
pu
urposes only
01/01/2012
< 25 >
For training
F
pu
urposes only
01/01/2012
< 26 >
For training
F
pu
urposes only
01/01/2012
< 27 >
For training
F
pu
urposes only
01/01/2012
< 28 >
For training
F
pu
urposes only
Engine:
Process Adjustment > Max Pressure
01/01/2012
< 29 >
For training
F
pu
urposes only
Engine:
Process Adjustment > Mean Pressure
01/01/2012
< 30 >
For training
F
pu
urposes only
Engine:
Chief Limiters
01/01/2012
< 31 >
For training
F
pu
urposes only
The ELFI valve feedback signal is not valid, i.e. outside 3.5 - 20.5 mA
The ELFI valve feedback signal indicates a too high (not physical possible)
speed
The ELFI valve feedback signal indicates a position not allowed outside a
window around TDC
Fuel Injection is re-enabled by either:
01/01/2012
< 32 >
For training
F
pu
urposes only
Injection
TDC
Injection
j
control
01/01/2012
< 33 >
For training
F
pu
urposes only
Engine:
Chief Limiters > Re-enable Fuel Injection
01/01/2012
< 34 >
For training
F
pu
urposes only
01/01/2012
< 35 >
For training
F
pu
urposes only
Accumulator
Diaphrame Working Principle
Diaphrame,
01/01/2012
< 36 >
For training
F
pu
urposes only
Accumulator
Nitrogen check and charging
The accumulator charge pressure should be
checked within the first week of service.
Next check
N
h k should
h ld b
be made
d around
d 4 months
h
later, followed by checking every 6 months.
01/01/2012
< 37 >
For training
F
pu
urposes only
Cylinder Lubricator
01/01/2012
< 38 >
For training
F
pu
urposes only
Cylinder Lubricator
01/01/2012
< 39 >
For training
F
pu
urposes only
01/01/2012
< 40 >
For training
F
pu
urposes only
Cylinder Liner,
Liner Injection Nozzles
01/01/2012
< 41 >
For training
F
pu
urposes only
Cylinder Liner,
Liner Injection Nozzles
01/01/2012
< 42 >
For training
F
pu
urposes only
The ME Engine
Cylinder Lubricator
Cylinder
y
lub. oil
inlet
Lubricator
activation signal
from controller
Flow sensor
Fl
Injection plunger
Spacer for
basic setting of
pump
stroke
Non-return valve
Stroke
adjusting
screw
Drain
oil
outlet
Sealing ring
01/01/2012
< 43 >
For training
F
pu
urposes only
01/01/2012
< 44 >
For training
F
pu
urposes only
01/01/2012
< 45 >
For training
F
pu
urposes only
01/01/2012
< 46 >
For training
F
pu
urposes only
250
200
Start level at 180 bar
150
Bar
100
50
0
0
10
15
20
25
30
Seconds
Pressure Decay Time
ME-B Hydraulic Cylinder Unit
01/01/2012
< 47 >
For training
F
pu
urposes only
01/01/2012
< 48 >
For training
F
pu
urposes only
Disclaimer
All data p
provided in these training
g materials is non-binding.
g
This data serves informational purposes only and is especially not
guaranteed in any way.
Depending on the subsequent specific individual projects
projects, the relevant data
may be subject to changes and will be assessed and determined
individually for each project. This will depend on the particular
characteristics of each individual p
project,
j , especially
p
y specific
p
site and
operational conditions.
01/01/2012
< 49 >