Professional Documents
Culture Documents
Comparison: Expandable Cavity Vs Slides
Comparison: Expandable Cavity Vs Slides
Comparison: Expandable Cavity Vs Slides
Instructions:
1) Fill in all grey boxes (expect those marked optional) for a typical slide mold application.
2) Estimates have been provided but can be replaced with your input.
3) Review Savings Summary at bottom and contact Progressive / Roehr with questions.
* This is NOT a quote. Designs can be submitted to Roehr Tool at information@roehrtool.com or call 978-562-4488.
* For animations or more information, please visit http://www.roehrtool.com/Demo/.
Project Overview:
Customer Name:
Project Description:
Date:
Slides vs Ex-Cav
Part/Project Data:
Production Data:
Part OD (in):
Resin Type:
Part Cost Est ($):
Annual Volume:
Expected Life of Mold (yrs):
Run Hours/Day=
Run Days/Year=
Press Rate:
Toolroom Rate:
Productivity Est:
Mold Data:
Cavities:
Slide Cost/Cavity:
Ex-Cav Cost (optional):
# of Columns in Mold Design:
20
300
$50
$50
90%
# /Year
Downtime/Stop (hr)
$2,500
2
$5
Cycle Time:
Est Cycle Time of Slide Mold
Actual Ex-Cav Cycle Time (optional):
Savings Summary:
Notes;
Cycle Time Reduction (sec) =
Mold Capacity: ExCav (units)=
Increased Capacity =
Smaller Mold Base (in) =
Mold Cost Variance =
Annual Savings;
Smaller Press Req, Savings =
TOTAL Part Savings =
TOTAL Maintenance Savings=
TOTAL Secondary Ops Savings =
Savings (year 1)
Savings (years 2, 3, etc)
TOTAL Savings over Life of Mold
ROI (yrs)
=
=
=
=
$/hr
$/hr
0.0
#DIV/0!
8
$0
#DIV/0!
#DIV/0!
$2,004
$0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
% Rejects
0.5%
$/hr
% of part cost